← Back
Elevator apt, semi-fireproof without stores
3554 DEKALB AVENUE
BRONX · BIN 2017824
💬 Discuss this project
1941Year Built
6Stories
D1Building Class
R7-1Zoning
34,800 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized112 Open Violations 110 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: DEKALB EQUITIES, INC · 7,500 sf lot · 4.64 FAR built · Flood zone X
Locations of Work
Structural
Roof6p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GAZIVODA REALTY1404/09/2026
DEKALB EQUITIEWS INC2903/22/2026
DEKALD EQUITIES, INC103/22/2026
3554 DEKALB REALTY CO.303/22/2026
NYNEX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR CONSULTING ENGINEER207/28/2025
ASR ENGINEERING PC101/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC INCGeneral Contractor407/08/2026
BECKWITH, BRUCEElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
WINSER, KEVINElectrical103/21/2026
A & A RESTORATION INCGeneral Contractor104/09/2026
ARS RESTORATION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR CONSULTING ENGINEER P.4054207/28/2025
Building Lifecycle
All (84)Filed (4)Permit Issued (6)Signed Off (2)Violation (60)Inspection (4)Objection (2)Special Inspection (6)
07/01/2026
Violation issued (ECB, open)
Construction
04/30/2026
Violation issued (HPD, open)
A
04/09/2026
Violation issued (ECB, open)
Construction
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, open)
B
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, open)
B
04/07/2026
Violation issued (HPD, open)
C
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, open)
B
04/07/2026
Violation issued (HPD, open)
B
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, open)
C
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, closed)
C
04/07/2026
Violation issued (HPD, open)
A
04/07/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, closed)
C
04/01/2026
Violation issued (HPD, closed)
C
04/01/2026
Violation issued (HPD, closed)
C
04/01/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (ECB, open)
Elevators
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
A
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, open)
C
02/09/2026
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2025
Signed off — Alteration
Herewith filing for facade repairs along (Exposure 1,2,3&4) and repair the parapet wall as shown in the drawings.
X01030709-I1
10/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/13/2025
Violation issued (HPD, closed)
C
09/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/25/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
QAZI RAZZAK
08/01/2025
Special inspection requirement — Masonry
QAZI RAZZAK
08/01/2025
Special inspection requirement — Final
NAVEEN KUMAR
07/31/2025
Violation issued (ECB, open)
Boilers
07/28/2025
Filed — Alteration
Herewith filing for facade repairs along (Exposure 1,2,3&4) and repair the parapet wall as shown in the drawings.
X01030709-P1
07/03/2025
Special inspection requirement — Masonry
QAZI RAZZAK
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
QAZI RAZZAK
07/03/2025
Special inspection requirement — Final
06/25/2025
Signed off — Alteration
X01015320-I1
05/02/2025
Permit issued — Suspended Scaffold
X01015320-I1-SC
01/25/2025
Violation issued (HPD, closed)
C
01/25/2025
Violation issued (HPD, closed)
C
01/10/2025
Permit issued — Sidewalk Shed
X00995034-I1-SH
12/18/2024
Permit issued — Structural
X01030709-I1-GC-CX
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
B
10/23/2024
Violation issued (HPD, closed)
C
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offA & A RESTORATION, INC05/02/2025
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC01/10/2025
DOB NOWStructuralSigned-offARS RESTORATION12/18/2024
DOB NOWGeneral ConstructionSigned-offA & A RESTORATION INC05/02/2024
DOB NOWSuspended ScaffoldSigned-offA & A RESTORATION, INC03/22/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC01/26/2024
BISBLISSUEDDUAL FUEL PLUBING & HTING11/23/2015
BISPLISSUEDDUAL FUEL PLUBING & HTING11/23/2015
2 projects · most recent 01/27/2024
FiledStatusContractorScope
01/27/2024Permit IssuedRICHARD NEU—
10/28/2023Permit IssuedJAM ELECTRICAL CORP—
1 project · most recent 01/26/2024
Sidewalk Shed
FiledStatusContractorScope
01/26/2024Permit IssuedTOPLINE NYC INCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/01/2025Tenant Protection Plan ComplianceQAZI RAZZAKspecial
08/01/2025MasonryQAZI RAZZAKspecial
08/01/2025FinalNAVEEN KUMARprogress
07/03/2025MasonryQAZI RAZZAKspecial
07/03/2025Tenant Protection Plan ComplianceQAZI RAZZAKspecial
07/03/2025Final—progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X00995034-I1Request digital key ↗
08/21/2026X01015320-I1Request digital key ↗
08/21/2026X01030709-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
12/01/2015220454005Open ↗
12/01/2015220454005Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/01/2015220454005Open ↗
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026X01030709-P1Open ↗
08/27/2026X01030709-P1Open ↗
08/26/2026X01030709-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/28/2016220454005Open ↗
05/01/2015220454005Open ↗
05/01/2015220454005Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X00995034-I1Open ↗
08/21/2026X01030709-I1Open ↗
08/21/2026X01030709-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026X01030709-P1Open ↗
08/26/2026X01030709-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/01/2015220454005Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/01/2015220454005Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/01/2015220454005Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/01/2015220454005Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026X01030709-P1Open ↗
08/21/2026X01030709-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/01/2015220454005Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/28/2016220454005Open ↗
05/01/2015220454005Open ↗
05/01/2015220454005Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/28/2016220454005Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/28/2016220454005Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/28/2016220454005Open ↗
05/01/2015220454005Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/01/2015220454005Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026X01015320-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01015320-I1Open ↗