← Back
Elevator apt, semi-fireproof without stores
3555 NETHERLAND AVENUE
BRONX · BIN 2084163
💬 Discuss this project
1939Year Built
6Stories
D1Building Class
R6AZoning
60,792 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized21 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 3555 ASSOCIATES LLC C · 18,075 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING407/08/2026
ORIN MANAGEMENT1107/08/2026
ELITE QUALITY CONSTRUCTION AND CONT404/09/2026
3555 ASSOCIATES1403/22/2026
3555 ASSOCIATES LLC C ORI103/22/2026
OWNER OF 3555 NETHERLAND103/22/2026
ORIN MANAGEMENT CORPOR103/22/2026
PHOENIX BRIDGING INC DBA PHOENIX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING302/04/2022
PAUL PERDEK, PROF. ENG. PLLC108/23/2021
ROYAL ENGINEERING, P.C112/13/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
NORTHEAST EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
BENJAMIN DREBINElectrical103/21/2026
CARL WEISSElectrical103/21/2026
JOHN AHRENSElectrical103/21/2026
YEVGENY KOLTUNOVElectrical103/21/2026
J.V.S. CONTRACTING GROUPGeneral Contractor107/08/2026
ANTHONY LOGOZZOElectrical103/21/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC5785302/04/2022
Building Lifecycle
All (99)Filed (6)Permit Issued (4)Signed Off (2)Facade (FISP) (12)Violation (60)Special Inspection (15)
04/30/2026
Violation issued (HPD, closed)
A
02/10/2026
Permit issued — Suspended Scaffold
X01354871-I1-SC
02/03/2026
Filed — Alteration
X01354871-I1
10/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X00005422-I1
02/22/2022
Signed off — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
X00557957-I1
02/09/2022
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
02/09/2022
Special inspection requirement — Final
ALAN DUDLEY
02/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
02/09/2022
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
02/09/2022
Special inspection requirement — Masonry
alon egozi
02/04/2022
Filed — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
X00557957-P2
01/25/2022
Cycle 9 facade report submitted
01/25/2022
Cycle 9 facade report signed — SAFE
01/20/2022
Cycle 9 facade inspection completed
01/07/2022
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
01/07/2022
Special inspection requirement — Masonry
alon egozi
01/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
01/07/2022
Special inspection requirement — Final
ALAN DUDLEY
01/07/2022
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
09/15/2021
Permit issued — General Construction
X00557957-I1-GC
08/24/2021
Filed — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
X00557957-P1
08/23/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00570919-I1
08/23/2021
Permit issued — Sidewalk Shed
X00570919-I1-SH
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
08/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
08/23/2021
Special inspection requirement — Masonry
alon egozi
08/23/2021
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
08/23/2021
Special inspection requirement — Final
ALAN DUDLEY
07/15/2021
Filed — Alteration
Exterior Facade Restoration as per Plans Filed Herewith. No Change in Use, Egress or Occupancy
X00557957-I1
05/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/17/2019
Violation issued (ECB, closed)
Construction
10/02/2018
Cycle 8 facade report signed — SAFE
09/25/2018
Violation issued (ECB, closed)
Local Law
05/31/2018
Cycle 8 facade report submitted
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2018
Cycle 8 facade inspection completed
12/13/2017
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X00005422-I1
12/13/2017
Permit issued — Sidewalk Shed
X00005422-I1-SH
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2016
Violation issued (HPD, closed)
B
09/23/2016
Violation issued (HPD, closed)
B
09/23/2016
Violation issued (HPD, closed)
B
09/23/2016
Violation issued (HPD, open)
C
09/23/2016
Violation issued (HPD, closed)
C
09/23/2016
Violation issued (HPD, closed)
A
09/23/2016
Violation issued (HPD, closed)
B
05/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/28/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/07/2015
Violation issued (HPD, closed)
A
04/07/2015
Violation issued (HPD, closed)
B
09/03/2014
Cycle 7 facade report submitted
08/30/2014
Cycle 7 facade report signed — SWARMP
08/01/2014
Violation issued (ECB, closed)
Local Law
07/15/2014
Cycle 7 facade inspection completed
07/11/2014
Violation issued (HPD, closed)
B
07/11/2014
Violation issued (HPD, closed)
C
07/11/2014
Violation issued (HPD, closed)
B
07/11/2014
Violation issued (HPD, closed)
B
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedELITE QUALITY CONS & CONT02/10/2026
DOB NOWGeneral ConstructionSigned-offJ.V.S. CONTRACTING GROUP09/15/2021
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL08/23/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC12/13/2017
BISPLISSUEDPRIME PIPING & HEATING IN05/14/2019
BISOTISSUEDINDIAN HEAD CONTRACTING05/14/2019
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION01/19/2018
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION12/06/2017
BISOTISSUEDWINDHAM RESTORATION CORP10/16/2014
BISOTISSUEDJ.V.S. RESTORATION CORP06/01/2012
BISEQISSUEDPHOENIX BRIDGING INC12/14/2011
BISEQISSUEDPHOENIX BRIDGING INC12/14/2011
BISEQISSUEDPHOENIX BRIDGING INC10/12/2011
BISBLISSUEDG. BAUER INC.08/26/1992
BISSPISSUEDD & LPLUMBING AND HEATING09/24/1990
BISOTISSUEDARKARA CONSTRUCTION CO., INC.08/10/1990
6 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023CompleteABILENE ELECTRIC INCGeneral Wiring
08/08/2021CompleteOPTIMAL ELECTRIC, INC—
07/07/2021Permit IssuedPK ELECTRIC INC—
12/24/2020CompleteTUXEDO ELEC'L CONTR'G INC—
12/06/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
12/13/2017Permit IssuedMEO ELECTRIC CORP—
1 project · most recent 08/23/2021
Sidewalk Shed
FiledStatusContractorScope
08/23/2021Permit IssuedPOWERS BRIDGING & SCAFFOLSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/09/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
02/09/2022FinalALAN DUDLEYprogress
02/09/2022Structural Stability – Alterations of existing buildingsalon egozispecial
02/09/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
02/09/2022Masonryalon egozispecial
01/07/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
01/07/2022Masonryalon egozispecial
01/07/2022Structural Stability – Alterations of existing buildingsalon egozispecial
01/07/2022FinalALAN DUDLEYprogress
01/07/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
08/23/2021Energy Code Compliance InspectionsALAN DUDLEYprogress
08/23/2021Structural Stability – Alterations of existing buildingsalon egozispecial
08/23/2021Masonryalon egozispecial
08/23/2021Air barrier - visual inspectionALAN DUDLEYenergy_progress
08/23/2021FinalALAN DUDLEYprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026X00005422-I1Request digital key ↗
08/25/2026X00570919-I1Request digital key ↗
08/24/2026X00557957-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
12/12/2019220704655Open ↗
05/14/2019220704655Open ↗
04/03/2018220163711Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
05/15/2019220704655Open ↗
05/15/2019220704655Open ↗
12/06/2017240201241Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/14/2019220704655Open ↗
04/05/2018220163711Open ↗
04/04/2018220163711Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026X00557957-P1Open ↗
09/01/2026X00557957-P1Open ↗
09/01/2026X00557957-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00570919-I1Open ↗
08/24/2026X00557957-P1Open ↗
08/24/2026X00557957-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/14/2019220704655Open ↗
01/12/2012220163711Open ↗
10/12/2011220144788Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00557957-P1Open ↗
08/29/2026X00557957-I1Open ↗
08/28/2026X00557957-P2Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
05/14/2019220704655Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/12/2011220144788Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/12/2019220704655Open ↗
05/14/2019220704655Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/16/2017240201241Open ↗
05/14/2019220704655Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
04/04/2018240201241Open ↗
10/16/2017240201241Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/12/2012220163711Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2014240071612Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/14/2019220704655Open ↗
04/04/2018240201241Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/09/2020220704655Open ↗
04/04/2018240201241Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/12/2012220163711Open ↗
▸BISNYCECC ANALYSIS1
10/16/2017240201241Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00557957-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/09/2020220704655Open ↗
12/06/2017240201241Open ↗
10/16/2017240201241Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/09/2020220704655Open ↗
05/18/2018220163711Open ↗
04/05/2018220163711Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/12/2012220163711Open ↗
01/12/2012220163711Open ↗
10/12/2011220144788Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/14/2011220144788Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/09/2020220704655Open ↗
05/14/2019220704655Open ↗
04/04/2018240201241Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET3
05/14/2019220704655Open ↗
01/12/2012220163711Open ↗
10/12/2011220144788Open ↗
▸BISBOROUGH INTAKE FORM3
04/05/2018220163711Open ↗
04/04/2018240201241Open ↗
04/04/2018220163711Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/16/2017240201241Open ↗
10/15/2014240071612Open ↗
▸BISADDITIONAL INFORMATION2
12/12/2019220704655Open ↗
04/03/2018240201241Open ↗
▸Other Documents2
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00005422-I1Open ↗
▸DOB NOWIRA Certification1
08/17/2026X01354871-I1Open ↗