← Back
BuildNYC
Elevator apt, semi-fireproof without stores
3555 NETHERLAND AVENUE
BRONX · BIN 2084163
💬 Discuss this project
1939Year Built
6Stories
D1Building Class
R6AZoning
60,792 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized12 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 3555 Associates LLC C · 18,075 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorOrin Management24p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3555 Associates903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pve Associates302/04/2022
Paul Perdek, Professional Engineering108/23/2021
Royal T&E112/13/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Northeast Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Powers Bridging & ScaffoldingScaffold203/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
Optimal ElectricElectrical103/21/2026
J.V.S. Contracting GroupGeneral Contractor107/08/2026
Lawrence ExteriorGeneral Contractor103/21/2026
Abilene ElectricElectrical103/21/2026
Triera ContractingScaffold107/08/2026
D & Lplumbing and HeatingPlumbing109/24/1990
Indian Head ContractingGeneral Contractor105/14/2019
Phoenix BridgingGeneral Contractor312/14/2011
Prime Piping & HeatingPlumbing105/14/2019
Windham RestorationGeneral Contractor110/16/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ase Engineering5785302/04/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
06/11/2026
Elevator Category 1 inspection report filed
05/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/10/2026
Permit issued — Suspended Scaffold
X01354871-I1-SC
148 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedElite Quality Construction & Contracting02/10/2026
DOB NOWGeneral ConstructionSigned-offJ.V.S. Contracting Group09/15/2021
DOB NOWSidewalk ShedPermit IssuedPowers Bridging & Scaffol08/23/2021
DOB NOWSidewalk ShedSigned-offTriera Contracting12/13/2017
BISPLISSUEDPrime Piping & Heating05/14/2019
BISOTISSUEDIndian Head Contracting05/14/2019
BISOTISSUEDLawrence Exterior Restoration01/19/2018
BISOTISSUEDLawrence Exterior Restoration12/06/2017
BISOTISSUEDWindham Restoration10/16/2014
BISOTISSUEDJ.V.S. Restoration06/01/2012
BISEQISSUEDPhoenix Bridging12/14/2011
BISEQISSUEDPhoenix Bridging12/14/2011
BISEQISSUEDPhoenix Bridging10/12/2011
BISBLISSUEDG. Bauer08/26/1992
BISSPISSUEDD & Lplumbing and Heating09/24/1990
BISOTISSUEDArkara Construction08/10/1990
6 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023CompleteAbilene ElectricGeneral Wiring
08/08/2021CompleteOptimal Electric—
07/07/2021Permit IssuedPK Electric—
12/24/2020CompleteTuxedo Electrical Contracting—
12/06/2019Permit IssuedStar Electrical Contractors—
12/13/2017Permit IssuedMeo Electric—
1 project · most recent 08/23/2021
Sidewalk Shed
FiledStatusContractorScope
08/23/2021Permit IssuedPowers Bridging & ScaffolSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/09/2022Structural Stability – Alterations of existing buildingsalon egozispecial
02/09/2022Masonryalon egozispecial
02/09/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
02/09/2022FinalALAN DUDLEYprogress
02/09/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
01/07/2022Air barrier - visual inspectionALAN DUDLEYenergy_progress
01/07/2022Masonryalon egozispecial
01/07/2022Structural Stability – Alterations of existing buildingsalon egozispecial
01/07/2022Energy Code Compliance InspectionsALAN DUDLEYprogress
01/07/2022FinalALAN DUDLEYprogress
08/23/2021Energy Code Compliance InspectionsALAN DUDLEYprogress
08/23/2021FinalALAN DUDLEYprogress
08/23/2021Air barrier - visual inspectionALAN DUDLEYenergy_progress
08/23/2021Masonryalon egozispecial
08/23/2021Structural Stability – Alterations of existing buildingsalon egozispecial
109 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account