← Back
Shopping center, with or without parking
3555 VICTORY BOULEVARD
STATEN ISLAND · BIN 5036682
💬 Discuss this project
1981Year Built
1Stories
K6Building Class
M1-1Zoning
43,700 sfGross Floor Area
8Units
27 Open Violations 25 unresolved · 2 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: TOP TOMATOE PLAZA LL · 100,800 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOP TOMATOE PLAZA LL303/22/2026
AKIL CONTRACTING CORP.103/22/2026
OWNER OF 3555 VICTORY BL103/22/2026
OWNER OF PREMISES103/22/2026
AMERICAN STAR REALTY303/21/2026
ROMA SHOPPING PLAZA303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M B KIM ARCHITECT P C506/17/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.B.KIM,ARCHITECT,P.CGeneral Contractor203/21/2026
WASOFF PLBG & UTILITY COPlumbing207/08/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M B KIM ARCHITECT P C4257212/09/2019
Building Lifecycle
All (80)Filed (5)Permit Issued (3)Signed Off (3)Violation (60)Special Inspection (9)
06/29/2026
Violation issued (ECB, open)
Construction
02/27/2026
Violation issued (ECB, open)
Construction
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
08/11/2025
Violation issued (FDNY_NOV, closed)
12/31/2024
Violation issued (FDNY_NOV, closed)
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2024
Violation issued (FDNY_NOV, closed)
09/09/2024
Signed off — Alteration
REMOVE EXISTING VAPOR BARRIER ROOM AND REPLACE EXISTING PERC. DRY CLEANING MACHINE WITH NEW HYDROCARBON DRY-CLEANING MACHINE AT EXISTING DRY-CLEANING FACILITY ON THE 1st FLOOR AS PER PLAN. ALL RELATED PLUMBING & ELECTRICAL WORKS TO BE FILED SEPARATELY.
S01067336-I1
08/05/2024
Violation issued (FDNY_NOV, closed)
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2024
Violation issued (FDNY_NOV, closed)
06/27/2024
Permit issued — General Construction
S01067336-I1-GC
06/17/2024
Filed — Alteration
REMOVE EXISTING VAPOR BARRIER ROOM AND REPLACE EXISTING PERC. DRY CLEANING MACHINE WITH NEW HYDROCARBON DRY-CLEANING MACHINE AT EXISTING DRY-CLEANING FACILITY ON THE 1st FLOOR AS PER PLAN. ALL RELATED PLUMBING & ELECTRICAL WORKS TO BE FILED SEPARATELY.
S01067336-I1
06/16/2024
Special inspection requirement — Final
MOON KIM
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/09/2023
Violation issued (FDNY_NOV, closed)
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2022
Violation issued (FDNY_NOV, closed)
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2022
Violation issued (FDNY_NOV, closed)
08/03/2022
Violation issued (ECB, closed)
Construction
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2021
Signed off — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-I1
02/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2020
Signed off — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-S1
08/10/2020
Filed — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-P2
08/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/03/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/24/2020
Permit issued — Plumbing
S00244855-S1-PL
01/21/2020
Filed — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-S1
12/10/2019
Special inspection requirement — HVAC and service water heating system controls
MOON KIM
12/10/2019
Special inspection requirement — Heating Systems
MOON KIM
12/10/2019
Special inspection requirement — HVAC and service water heating equipment
MOON KIM
12/10/2019
Special inspection requirement — Maintenance information
MOON KIM
12/09/2019
Filed — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-P1
11/03/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2019
Special inspection requirement — Heating Systems
MOON KIM
11/02/2019
Special inspection requirement — HVAC and service water heating system controls
MOON KIM
11/02/2019
Special inspection requirement — Maintenance information
MOON KIM
11/02/2019
Special inspection requirement — HVAC and service water heating equipment
MOON KIM
10/24/2019
Permit issued — Boiler Equipment
S00244855-I1-BE
10/22/2019
Filed — Alteration
REPLACE EXISTING GAS FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 107902) WITH NEW GAS FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT 1st FLOOR AS PER PLAN.
S00244855-I1
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM.B.KIM,ARCHITECT,P.C06/27/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO01/24/2020
DOB NOWBoiler EquipmentPermit IssuedWASOFF PLBG & UTILITY CO10/24/2019
BISBLISSUEDWASOFF PLBG & UTILITY CO11/21/2016
BISMHISSUEDSILLER BROTHER'S CONSTRUCTION06/12/2012
BISOTISSUEDTITANIUM CONSTRUCTION SER03/09/2010
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEMS10/02/2006
BISFPISSUEDIDEAL FIRE SYSTEMS. INC.02/11/2005
BISBLISSUEDALL - RITE PLUMBING03/28/2001
BISPLISSUEDALL - RITE PLUMBING03/28/2001
BIS—ISSUEDRESIDENTIAL & STRUCTURAL CONTR.03/10/1999
BISOTISSUEDN/A10/28/1998
BISPLISSUEDRICHMOND PLBG & HTG09/24/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC.06/05/1997
BIS—ISSUEDBERGER SIGN FABRICATION INC.06/05/1997
BIS—ISSUEDFUN ZONES OF S.I. INC.02/07/1997
BISFPISSUEDFIRE FOE CORPORATION11/14/1996
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.04/25/1996
BISOTISSUEDAKIL HOME IMPROVEMENT INC.03/12/1996
BIS—ISSUEDAKIL HOME IMPROVEMENT INC.10/19/1995
BISPLISSUEDMTHL PLUMBING & HEATING02/01/1995
BIS—ISSUEDRUSSO BROS HTG& AIR CONDITIONING05/19/1993
BISSPISSUEDSKYLINE FIRE SPRINKLER CORP.05/01/1992
2 projects · most recent 06/24/2024
General Wiring
FiledStatusContractorScope
06/24/2024CompleteJONG HYUN KIMGeneral Wiring
02/18/2020CompleteISTRA ELEC'L CONTRS CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/16/2024FinalMOON KIMprogress
12/10/2019HVAC and service water heating system controls MOON KIMenergy_progress
12/10/2019Heating SystemsMOON KIMspecial
12/10/2019HVAC and service water heating equipment MOON KIMenergy_progress
12/10/2019Maintenance informationMOON KIMenergy_progress
11/02/2019Heating SystemsMOON KIMspecial
11/02/2019HVAC and service water heating system controls MOON KIMenergy_progress
11/02/2019Maintenance informationMOON KIMenergy_progress
11/02/2019HVAC and service water heating equipment MOON KIMenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hollywood CleanersOtherFloor 1
Project S00244855 Alteration · LOC Issued · 10/22/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/26/2026S00244855-I1Request digital key ↗
08/15/2026S00244855-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026S00244855-S1Request digital key ↗
08/15/2026S00244855-P2Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026S01067336-I1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION5
11/06/2016540116685Open ↗
11/06/2016540116685Open ↗
06/12/2012520103101Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
11/06/2016540116685Open ↗
06/12/2012520103101Open ↗
02/16/2010520029166Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026S00244855-I1Open ↗
09/23/2026S00244855-I1Open ↗
09/23/2026S00244855-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026S01067336-I1Open ↗
08/13/2026S00244855-P1Open ↗
08/13/2026S00244855-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/12/2012520103101Open ↗
10/27/2010520029166Open ↗
02/16/2010520029166Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/12/2012520103101Open ↗
02/16/2010520029166Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/12/2012520103101Open ↗
02/16/2010520029166Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S00244855-I1Open ↗
09/02/2026S00244855-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/06/2016540116685Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/06/2016540116685Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/06/2016540116685Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/06/2016540116685Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/16/2010520029166Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026S01067336-I1Open ↗
08/13/2026S00244855-P2Open ↗
08/13/2026S00244855-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/06/2016540116685Open ↗
06/12/2012520103101Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/16/2010520029166Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/12/2012520103101Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2016540116685Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/06/2016540116685Open ↗
▸BISNYCECC ANALYSIS1
11/06/2016540116685Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00244855-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/06/2016540116685Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
06/12/2012520103101Open ↗
02/16/2010520029166Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2010520029166Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/06/2016540116685Open ↗
06/12/2012520103101Open ↗
10/27/2010520029166Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
06/12/2012520103101Open ↗
02/16/2010520029166Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/06/2016540116685Open ↗
▸BISADDITIONAL INFORMATION1
11/21/2016540116685Open ↗