← Back
Multi-story retail building (2+)
3556 BROADWAY
MANHATTAN · BIN 1061956
💬 Discuss this project
1925Year Built
2Stories
K2Building Class
R8Zoning
9,680 sfGross Floor Area
1Units
Multi-story retail building (2+) · Owner of record: CRP 3556 BROADWAY A LLC · 5,000 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof2p · 2 filings · 19 docs
Floor 27p · 2 filings · 19 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CRP 3556 BROADWAY1803/21/2026
CRP 125 RIVINGTON STREET, LLC503/21/2026
CRP 3554 BROADWAY403/21/2026
3554 BWAY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/14/2015$6.1M—2431 GRAND CONCOURSE, LLC → CRP 3556 BROADWAY C LLC$630/sf building
02/21/2014$5.0M—— → —$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF ENGINEERING, PC502/06/2020
AVRO CONSULT ENGINEERING, P.C.211/07/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COW BAY SPRINKLER CORPGeneral Contractor303/21/2026
IPS PLUMBING CORPPlumbing203/22/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ROBERT COVELLOElectrical203/21/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
ROBERT STEINElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827501/03/2020
Building Lifecycle
All (34)Filed (7)Permit Issued (5)Signed Off (4)Special Inspection (18)
11/25/2020
Signed off — Alteration
M00214834-I1
10/01/2020
Signed off — Alteration
M00214822-I1
10/01/2020
Signed off — Alteration
NY OPHTHALMOLOGY - MEDICAL OFFICE BUILDOUT - MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00214838-I1
10/01/2020
Signed off — Alteration
NY OPHTHALMOLOGY - MEDICAL OFFICE BUILDOUT - PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00214827-I1
02/06/2020
Filed — Alteration
NY OPHTHALMOLOGY - MEDICAL OFFICE BUILDOUT - PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00214827-P1
01/18/2020
Permit issued — Mechanical Systems
M00214822-I1-MS
01/03/2020
Filed — Alteration
M00214822-P1
12/26/2019
Special inspection requirement — Electrical motors
JONAR MADRIAGA
12/26/2019
Special inspection requirement — Heating Systems
JONAR MADRIAGA
12/26/2019
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
12/26/2019
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
12/26/2019
Special inspection requirement — Final
JONAR MADRIAGA
12/26/2019
Special inspection requirement — HVAC insulation and sealing
12/26/2019
Special inspection requirement — HVAC and service water heating equipment
12/26/2019
Special inspection requirement — Maintenance information
12/26/2019
Special inspection requirement — HVAC and service water heating system controls
12/26/2019
Special inspection requirement — Shutoff dampers
11/13/2019
Permit issued — Structural
M00214834-S1-ST
11/07/2019
Filed — Alteration
M00214834-S1
11/06/2019
Permit issued — Structural
M00214834-I1-ST
11/06/2019
Special inspection requirement — Final
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Masonry
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Structural Cold-Formed Steel
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
11/06/2019
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
10/24/2019
Permit issued — Sprinklers
M00214838-I1-EW-SP
10/24/2019
Permit issued — Plumbing
M00214827-I1-PL
10/18/2019
Filed — Alteration
M00214834-I1
10/17/2019
Filed — Alteration
M00214822-I1
10/17/2019
Filed — Alteration
NY OPHTHALMOLOGY - MEDICAL OFFICE BUILDOUT - MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00214838-I1
10/17/2019
Filed — Alteration
NY OPHTHALMOLOGY - MEDICAL OFFICE BUILDOUT - PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00214827-I1
08/21/2019
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCOW BAY SPRINKLER CORP01/18/2020
DOB NOWStructuralPermit IssuedCOW BAY SPRINKLER CORP11/13/2019
DOB NOWStructuralSigned-offCOW BAY SPRINKLER CORP11/06/2019
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC10/24/2019
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/24/2019
BISPLISSUEDIPS PLUMBING CORP04/13/2022
BISPLISSUEDIPS PLUMBING CORP07/24/2020
BISOTISSUEDCOW BAY SPRINKLER CORP11/07/2019
BISOTISSUEDSASCO CONSTRUCTION ENTER10/01/2018
BISOTISSUEDSASCO CONSTRUCTION ENTER11/30/2017
BISOTISSUEDSASCO CONSTRUCTION ENTER07/12/2017
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC06/19/2017
BISSPISSUEDFIVE BOROUGH NYC LLC11/28/2016
BIS—ISSUEDINTERBORO SIGN & ELEC MAI11/16/2016
BIS—ISSUEDINTERBORO SIGN & ELEC MAI10/20/2016
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC10/03/2016
BISMHISSUEDSMJ CONSTRUCTION TECH,LLC10/03/2016
BISEQISSUEDSASCO CONSTRUCTION ENTER09/08/2016
BISPLISSUEDPLUMBING & HTG DOCTOR INC08/24/2016
BISEQISSUEDSMJ CONSTRUCTION TECH,LLC07/21/2016
BISMHISSUEDSMJ CONSTRUCTION TECH,LLC07/21/2016
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC07/21/2016
BISOTISSUEDBIG BULL CORP02/26/2016
BISPLISSUEDJ.H LOWEY05/30/1997
BISEQISSUEDAMD CONSTRUCTION04/24/1997
BISMHISSUEDAMD CONSTRUCTION04/24/1997
BISOTISSUEDAMD CONSTRUCTION04/24/1997
BISOTISSUEDAMD CONSTRUCTION04/24/1997
3 projects · most recent 09/30/2022
General Wiring
FiledStatusContractorScope
09/30/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/19/2019CompleteDOUBLE "R" ELEC'L CONTR'GGeneral Wiring
07/24/2018CancelledTHYSSENKRUPP ELEVATOR CO—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/26/2019Electrical motorsJONAR MADRIAGAenergy_progress
12/26/2019Heating SystemsJONAR MADRIAGAspecial
12/26/2019Mechanical SystemsJONAR MADRIAGAspecial
12/26/2019Energy Code Compliance InspectionsJONAR MADRIAGAprogress
12/26/2019FinalJONAR MADRIAGAprogress
12/26/2019HVAC insulation and sealing —energy_progress
12/26/2019HVAC and service water heating equipment —energy_progress
12/26/2019Maintenance information—energy_progress
12/26/2019HVAC and service water heating system controls —energy_progress
12/26/2019Shutoff dampers—energy_progress
11/06/2019FinalJONAR MADRIAGAprogress
11/06/2019MasonryJONAR MADRIAGAspecial
11/06/2019Structural Cold-Formed SteelJONAR MADRIAGAspecial
11/06/2019Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
11/06/2019Structural Steel - DetailsJONAR MADRIAGAspecial
11/06/2019Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
11/06/2019Structural Steel - WeldingJONAR MADRIAGAspecial
08/21/2019Sprinkler SystemsJONAR MADRIAGAspecial
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00214834-S1Request digital key ↗
09/05/2026M00214834-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00214827-I1Request digital key ↗
08/15/2026M00214827-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00214822-I1Request digital key ↗
08/15/2026M00214822-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00214838-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION24
02/14/2022140820618Open ↗
11/09/2021122689830Open ↗
09/02/2021140808482Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION17
04/13/2022140820618Open ↗
06/04/2021140820618Open ↗
07/24/2020122945901Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/07/2019123691585Open ↗
11/04/2019123691585Open ↗
10/08/2019123691585Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
11/25/2016122945901Open ↗
11/17/2016140553595Open ↗
10/24/2016122922409Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026M00214822-P1Open ↗
08/13/2026M00214827-P1Open ↗
08/13/2026M00214834-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026M00214838-I1Open ↗
08/28/2026M00214834-S1Open ↗
08/28/2026M00214834-S1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/17/2016140553595Open ↗
09/07/2016140545667Open ↗
07/20/2016140524001Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/17/2016140553595Open ↗
09/07/2016140545667Open ↗
07/20/2016140524001Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/25/2016122945901Open ↗
10/24/2016122922392Open ↗
02/24/2016122689830Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/04/2018140820618Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M00214834-S1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/25/2016122945901Open ↗
09/25/2016140523985Open ↗
02/24/2016122689830Open ↗
▸BISSCHEDULE B - PLUMBING2
12/04/2018140820618Open ↗
07/20/2016140523985Open ↗
▸BISEQUIPMENT USE PERMITS1
08/09/2017140524001Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/09/2017140524001Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
07/26/2019121188687Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
11/04/2019123691585Open ↗
07/26/2019121188687Open ↗
11/22/2016122922409Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026M00214822-P1Open ↗
08/13/2026M00214834-I1Open ↗
08/13/2026M00214834-S1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
03/08/2022121188687Open ↗
06/04/2021140820618Open ↗
11/06/2020123691585Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/07/2019123691585Open ↗
11/04/2019123691585Open ↗
12/07/2016140524001Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/06/2020123691585Open ↗
09/10/2020140553595Open ↗
09/10/2020140553595Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/17/2016140553595Open ↗
07/20/2016140524001Open ↗
07/20/2016140523985Open ↗
▸BISNYCECC ANALYSIS2
07/20/2016140524001Open ↗
07/20/2016140523985Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/27/2020140523985Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY25
03/08/2022121188687Open ↗
06/04/2021140820618Open ↗
11/06/2020123691585Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/17/2016140553595Open ↗
▸BISSOIL REPORT1
11/17/2016140553595Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/06/2020123691585Open ↗
09/10/2020140553595Open ↗
07/27/2020140523985Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/26/2019121188687Open ↗
07/26/2019121188687Open ↗
07/21/2017140553595Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
07/23/2018122689830Open ↗
07/16/2018122689830Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/05/2016140523985Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
01/18/2022121188687Open ↗
11/06/2020123691585Open ↗
09/10/2020140553595Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/27/2020140523985Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION7
10/25/2019123691585Open ↗
03/20/2019140820618Open ↗
03/20/2019140820618Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/04/2018140820618Open ↗
11/17/2016140553595Open ↗
09/07/2016140545667Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
10/08/2019123691585Open ↗
11/25/2016122945901Open ↗
10/24/2016122922409Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
04/27/2020122689830Open ↗
07/23/2018122689830Open ↗
07/16/2018122689830Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/25/2016122945901Open ↗
11/25/2016122945901Open ↗