← Back
BuildNYC
Primarily 2 family with 1 store or office
356 7TH AVENUE
BROOKLYN · Park Slope · BIN 3022707
💬 Discuss this project
1885Year Built
3Stories
S2Building Class
R6AZoning
3,500 sfGross Floor Area
3Units
3 Active Violations 1 likely answered 1 old, status unconfirmed ▸
Primarily 2 family with 1 store or office · Owner of record: 356-358 Seventh · 1,514 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3New mechanical HVAC units, 2nd and 3rd floors1p · 1 filing · 10 docs
Floor 2New mechanical HVAC units, 2nd and 3rd floors1p · 1 filing · 10 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HH Realty Equities210/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bitopi Consultants109/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spirit AcquisitionsGeneral Contractor110/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bitopi Consultants7036109/30/2026
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Violation (8)Special Inspection (6)
10/14/2026
Signed off — Alteration
INSTALL NEW MECHANICAL HVAC UNITS AT THE 2ND AND 3RD FLOOR RESIDENTIAL APARTMENTS.
B01445131-I1
10/06/2026
Permit issued — Mechanical Systems
B01445131-I1-MS
09/30/2026
Filed — Alteration
INSTALL NEW MECHANICAL HVAC UNITS AT THE 2ND AND 3RD FLOOR RESIDENTIAL APARTMENTS.
B01445131-I1
09/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
09/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
KAMRUL AHSAN
09/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
KAMRUL AHSAN
09/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KAMRUL AHSAN
08/12/2026
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
08/12/2026
Special inspection requirement — Final
KAMRUL AHSAN
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2025
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/11/2024
Violation issued (ECB, closed)
Construction
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSpirit Acquisitions10/06/2026
1 project · most recent 09/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2026Signed-offSpirit AcquisitionsHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ASU12RLS3Y 12,000 BTU · Split System ×4
AOU12RLS3 12,000 BTU · Condensing Unit ×1
Cooper & Hunter CH-36LCDTU/I 36,000 BTU · Fan Coil Indoor ×1
CH-36LCU/O 36,000 BTU · Condensing Unit ×1
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/29/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
09/29/2026HVAC-R and service water heating equipmentKAMRUL AHSANenergy_progress
09/29/2026HVAC-R and service water heating system controlsKAMRUL AHSANenergy_progress
09/29/2026HVAC-R and service water piping design and insulationKAMRUL AHSANenergy_progress
08/12/2026Mechanical SystemsKAMRUL AHSANspecial
08/12/2026FinalKAMRUL AHSANprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
10/04/2026B01445131-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
10/04/2026B01445131-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
10/05/2026B01445131-I1Open ↗
10/05/2026B01445131-I1Open ↗
10/05/2026B01445131-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
10/05/2026B01445131-I1Open ↗
10/05/2026B01445131-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
10/04/2026B01445131-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
10/04/2026B01445131-I1Open ↗