Three families
356 EAST 8 STREET
MANHATTAN · East Village · BIN 1004504
💬 Discuss this project
1899Year Built
4Stories
C0Building Class
R8BZoning
2,928 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 356 EAST 8 STREET LLC · 1,804 sf lot · 1.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof5p · 1 filing · 20 docs
Penthouse31p · 1 filing · 20 docs
Floor 413p · 2 filings · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar13p · 2 filings · 20 docs
Site & exterior10p · 4 filings · 8 docs
Filed — no permit issued11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OXFORD ASSETS5707/08/2026
PLATINUM SERVICES NY504/09/2026
MARUTI CONTRACTING LLC503/22/2026
356 EAST 8 STREET LLC103/22/2026
HHOLDING GROUP103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/13/2024$2.0M—INGRID HOUSE LLC → 356 EAST 8 STREET LLC$683/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HERTZ ENGINEERING, PLLC1603/13/2026
RAS PE CONSULTING ENGINEERS402/10/2025
MCHENERY TESTING LAB111/26/2024
H & O ENGINEERING, DPC203/13/2024
ASHRAF CORP112/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING1603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTRESS FORCE CONST. CORGeneral Contractor1507/08/2026
NURUL AMINGeneral Contractor307/08/2026
G K ENGG GROUP LLCGeneral Contractor303/21/2026
MOISHE KLEINElectrical203/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI36521803/13/2026
H & O ENGINEERING, DPC5595102/05/2024
Building Lifecycle
All (215)Filed (24)Permit Issued (16)Signed Off (12)Violation (60)Inspection (13)Objection (60)Special Inspection (30)
04/13/2026
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-I1
03/13/2026
Filed — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-A3
03/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
NARI MOTWANI
03/13/2026
Special inspection requirement — Interior lighting power
NARI MOTWANI
03/13/2026
Special inspection requirement — Maintenance information
NARI MOTWANI
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
03/13/2026
Special inspection requirement — Masonry
NARI MOTWANI
03/13/2026
Special inspection requirement — Lighting controls
NARI MOTWANI
03/13/2026
Special inspection requirement — Insulation placement and R values
NARI MOTWANI
03/13/2026
Special inspection requirement — Fenestration air leakage
NARI MOTWANI
03/13/2026
Special inspection requirement — Fenestration areas
NARI MOTWANI
03/13/2026
Special inspection requirement — Exterior lighting power
NARI MOTWANI
03/13/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
NARI MOTWANI
03/13/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
NARI MOTWANI
03/13/2026
Special inspection requirement — Lowest Floor Elevation
NARI MOTWANI
03/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
03/13/2026
Special inspection requirement — Permanent certificate
NARI MOTWANI
03/13/2026
Special inspection requirement — Lighting in dwelling units
NARI MOTWANI
03/13/2026
Special inspection requirement — Metering
NARI MOTWANI
03/13/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NARI MOTWANI
03/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NARI MOTWANI
02/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/02/2026
Filed — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-A1
01/02/2026
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
01/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
NARI MOTWANI
01/02/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
NARI MOTWANI
01/02/2026
Special inspection requirement — Masonry
NARI MOTWANI
01/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
01/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
NARI MOTWANI
01/02/2026
Special inspection requirement — Lowest Floor Elevation
NARI MOTWANI
01/02/2026
Special inspection requirement — Insulation placement and R values
NARI MOTWANI
01/02/2026
Special inspection requirement — Lighting controls
NARI MOTWANI
01/02/2026
Special inspection requirement — Metering
NARI MOTWANI
12/08/2025
Signed off — Alteration
file structural stablization plans to address critical safety concerns as per EMERGENCY DECLARATION: , no change in use, egress or occupancy
M01022356-I1
12/08/2025
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-S2
12/04/2025
Signed off — Alteration
M01018082-I1
12/04/2025
Permit issued — Construction Fence
M01018082-I1-FN
11/24/2025
Signed off — Alteration
M00979955-I1
11/06/2025
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-S5
10/08/2025
Filed — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-P9
10/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2025
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-S3
09/28/2025
Signed off — Alteration
NSTALLATION OF 300PSF SIDEWALK SHED PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01179034-I1
09/25/2025
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-S7
09/15/2025
Objection resolved — Addressed
09/05/2025
Permit issued — General Construction
M00974039-I1-GC
08/29/2025
Objection raised — Other
08/18/2025
Filed — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-P8
07/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/26/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/19/2025
Signed off — Alteration CO
SUPERSEDING JOB #121330390. HORIZ/VERT EXT TO EXIST 4-STY BLDG. CONVERT TO 8 RES UNITS + 1ST FLR COMM (UG6, OG M). PROVIDE ZR COMPLIANCE (POST 12/5/24) TO OBTAIN NEW C/O.
M00974039-S6
06/04/2025
Signed off — Alteration
M01181649-I1
05/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01147706-I1
04/02/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
03/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR12/04/2025
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR09/05/2025
DOB NOWSidewalk ShedSigned-offFORTRESS FORCE CONST. COR02/21/2025
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR02/18/2025
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR01/09/2025
DOB NOWSupported ScaffoldSigned-offG K ENGG GROUP LLC12/03/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL09/04/2024
DOB NOWStructuralSigned-offFORTRESS FORCE CONST. COR07/31/2024
DOB NOWEarth WorkSigned-offFORTRESS FORCE CONST. COR07/31/2024
DOB NOWMechanical SystemsSigned-offFORTRESS FORCE CONST. COR07/12/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS07/05/2024
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR06/20/2024
DOB NOWSidewalk ShedSigned-offNITHIN CONSTRUCTION CO03/29/2024
DOB NOWStructuralSigned-offNITHIN CONSTRUCTION CO03/28/2024
DOB NOWConstruction FenceSigned-offNITHIN CONSTRUCTION CO03/26/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/21/2023
BISOTISSUEDALBA SERVICES INC02/20/2019
BISEQISSUEDSINGLA CONCEPTS INC10/10/2017
BISEQISSUEDEMMA GROUP MANAGEMENT INC08/16/2017
BISEQISSUEDEMMA GROUP MANAGEMENT INC09/12/2016
BIS—ISSUEDELITE BUILDERS CORP08/16/2016
BISEQISSUEDELITE BUILDERS CORP07/29/2016
BISEQISSUEDELITE BUILDERS CORP12/29/2015
BISEQISSUEDELITE BUILDERS CORP12/29/2015
BISEQISSUEDELITE BUILDERS CORP08/18/2015
BISOTISSUEDELITE BUILDERS CORP05/28/2015
BIS—ISSUEDELITE BUILDERS CORP05/13/2015
BISEQISSUEDELITE BUILDERS CORP12/16/2014
BISEQISSUEDELITE BUILDERS CORP12/16/2014
BISEQISSUEDELITE BUILDERS CORP10/08/2014
BIS—ISSUEDELITE BUILDERS CORP10/08/2014
1 project · most recent 03/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2026Permit IssuedFORTRESS FORCE CONST. CORHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NAHZ4 36,000 BTU · Heat Pump Outdoor ×8
MXZ-2C20NAHZ4 15,900 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire HE07RT 694 CFM · Erv ×1
1 project · most recent 03/13/2026
Sprinkler System
FiledStatusContractorScope
03/13/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 03/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/13/2026Signed-offDYNAMIC PLBG & SPRKLR CORStorm, Water/Sanitary
7 projects · most recent 03/06/2026
General Wiring
FiledStatusContractorScope
03/06/2026CompletePOWER SURGE ELECTRIC, INC—
03/06/2026CompletePOWER SURGE ELECTRIC, INC—
02/03/2026CompletePOWER SURGE ELECTRIC, INC—
02/03/2026CompletePOWER SURGE ELECTRIC, INC4 meters, 4 new_meters
11/19/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
03/28/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
02/13/2024CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 03/13/2026
Steel Masonry
FiledStatusContractorScope
03/13/2026Permit IssuedFORTRESS FORCE CONST. CORSteel, Masonry
1 project · most recent 03/13/2026
Earthwork
FiledStatusContractorScope
03/13/2026Permit IssuedFORTRESS FORCE CONST. COREarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/02/2025Pass-Final House ConnectionPassView ↗
03/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
03/13/2026Exterior lighting powerNARI MOTWANIenergy_progress
03/13/2026Lighting controlsNARI MOTWANIenergy_progress
03/13/2026Interior lighting powerNARI MOTWANIenergy_progress
03/13/2026Fenestration areasNARI MOTWANIenergy_progress
03/13/2026Fenestration and door U-factor and product ratingsNARI MOTWANIenergy_progress
03/13/2026Exterior Insulation and Finish Systems (EIFS)NARI MOTWANIspecial
03/13/2026Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
03/13/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)NARI MOTWANIspecial
03/13/2026MasonryNARI MOTWANIspecial
03/13/2026Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
03/13/2026Wall Panels, Curtain Walls, and VeneersNARI MOTWANIspecial
03/13/2026Energy Code Compliance InspectionsNARI MOTWANIprogress
03/13/2026Fire-Resistance Rated ConstructionNARI MOTWANIprogress
03/13/2026Lowest Floor ElevationNARI MOTWANIprogress
03/13/2026Permanent certificateNARI MOTWANIenergy_progress
03/13/2026Insulation placement and R valuesNARI MOTWANIenergy_progress
03/13/2026Lighting in dwelling unitsNARI MOTWANIenergy_progress
03/13/2026MeteringNARI MOTWANIenergy_progress
03/13/2026Fenestration air leakageNARI MOTWANIenergy_progress
03/13/2026Maintenance informationNARI MOTWANIenergy_progress
01/02/2026Wall Panels, Curtain Walls, and VeneersNARI MOTWANIspecial
01/02/2026Insulation placement and R valuesNARI MOTWANIenergy_progress
01/02/2026Lighting controlsNARI MOTWANIenergy_progress
01/02/2026Lighting in dwelling unitsNARI MOTWANIenergy_progress
01/02/2026Fenestration areasNARI MOTWANIenergy_progress
Latest 25 of 135.
▾Documents — 489 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/28/2026M00979955-I1Request digital key ↗
08/27/2026M01018082-I1Request digital key ↗
08/27/2026M01022356-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION21
11/07/2025121749288Open ↗
11/03/2025121713823Open ↗
10/31/2025122211766Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION14
02/19/2019140831679Open ↗
10/16/2017121330390Open ↗
09/22/2016121330390Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
02/19/2025141026770Open ↗
▸Zoning, Tax Lot & Property Records30
▸DOB NOWZD1: DOB Zoning Diagram12
08/18/2026M00974039-I1Open ↗
08/18/2026M00974039-I1Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWZoning Exhibit form (1-5)9
08/18/2026M00974039-I1Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWRestrictive Declaration/Easement 15
08/18/2026M00974039-I1Open ↗
Showing 1 of 5 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
04/03/2014121330390Open ↗
▸BISFLOOD ZONE COMPLIANCE1
10/29/2025122390750Open ↗
▸BISZONING DIAGRAM1
08/21/2014121330390Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
04/03/2014121330390Open ↗
▸Seals & Professional Certifications184
▸DOB NOWProgress Inspector Seal & Signature83
09/08/2026M00974039-P2Open ↗
09/08/2026M00974039-P2Open ↗
09/01/2026M00974039-P8Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature52
09/08/2026M00974039-P2Open ↗
09/01/2026M00974039-P8Open ↗
09/01/2026M00974039-P8Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/28/2026M00979955-I1Open ↗
08/28/2026M00995957-I1Open ↗
08/27/2026M01022356-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/28/2019140831679Open ↗
06/03/2019140831679Open ↗
05/17/2019140831679Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/19/2019140831679Open ↗
11/09/2017123257144Open ↗
05/05/2015122390750Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/09/2017123257144Open ↗
05/05/2015122390750Open ↗
12/09/2014122211757Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/19/2025141026770Open ↗
02/19/2019140831679Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/19/2025141026770Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/18/2026M00974039-A3Open ↗
08/18/2026M00974039-I1Open ↗
Showing 2 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING2
12/23/2015121330390Open ↗
12/24/2014121330390Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
08/19/2014121330390Open ↗
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist11
08/18/2026M00974039-I1Open ↗
Showing 1 of 11 on file for this type
▸BISST-1 Street Tree Checklist1
04/03/2014121330390Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/19/2025141026770Open ↗
▸BISSTREET TREE CHECKLIST1
02/19/2025141026770Open ↗
▸BISSTREET TREE SIGNOFF1
11/24/2025141026770Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
10/29/2025122390750Open ↗
▸BISDS1-Demolition Submittal Certification Form1
10/10/2014121330390Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026M00974039-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026M00974039-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026M00974039-I1Open ↗
▸Environmental & Asbestos44
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/27/2026M00974039-P2Open ↗
08/18/2026M00974039-A3Open ↗
08/18/2026M00974039-S7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice to Proceed11
08/27/2026M01022356-I1Open ↗
08/18/2026M00974039-S7Open ↗
08/18/2026M00974039-I1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
11/24/2025141026770Open ↗
11/03/2025122211766Open ↗
10/29/2025122211757Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/18/2026M00974039-S7Open ↗
08/18/2026M00974039-I1Open ↗
08/18/2026M00974039-S2Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
02/19/2025141026770Open ↗
02/19/2019140831679Open ↗
05/05/2015121330390Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/19/2014122211757Open ↗
08/21/2013121749288Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/03/2014121330390Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/26/2014121330390Open ↗
12/26/2014121330390Open ↗
08/19/2014121330390Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/05/2015122390750Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/29/2025122211757Open ↗
10/29/2025122390750Open ↗
12/26/2014121330390Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT3
08/18/2026M00974039-S7Open ↗
08/18/2026M00974039-P3Open ↗
Showing 2 of 3 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/29/2025122211757Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/10/2014121330390Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
02/19/2019140831679Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/19/2019140831679Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/10/2014121330390Open ↗
▸BISSoil Report1
04/03/2014121330390Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/03/2014121330390Open ↗
▸BISDEP Hydrant Flow Test Letter1
06/28/2013121330390Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/18/2026M00974039-S7Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/03/2025122211766Open ↗
10/29/2025122390750Open ↗
10/29/2025122211757Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/13/2019140831679Open ↗
11/09/2017123257144Open ↗
10/10/2014121330390Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
04/24/2014121330390Open ↗
03/18/2014121330390Open ↗
12/23/2015121330390Open ↗
▸BISSUPERSEDING LETTER2
10/18/2017121330390Open ↗
09/22/2016121330390Open ↗
▸BISFINAL2
10/29/2025122390750Open ↗
02/19/2019140831679Open ↗
▸BISSHED LETTER2
01/12/2016122211766Open ↗
01/12/2016122211766Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/24/2025141026770Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
10/10/2014121330390Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT9
06/28/2019140831679Open ↗
06/04/2019140831679Open ↗
05/17/2019140831679Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/22/2015121330390Open ↗
10/10/2014121330390Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/29/2025122390750Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/31/2016121330390Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
08/31/2016121330390Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION8
10/14/2025141026770Open ↗
09/14/2016121330390Open ↗
09/01/2015122390750Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
06/28/2019140831679Open ↗
06/04/2019140831679Open ↗
06/03/2019140831679Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
11/09/2017123257144Open ↗
05/05/2015122390750Open ↗
12/09/2014122211757Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/19/2025141026770Open ↗
02/19/2019140831679Open ↗
▸Other Documents54
▸DOB NOWPlot Diagram12
08/18/2026M00974039-I1Open ↗
08/18/2026M00974039-S7Open ↗
08/18/2026M00974039-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSite Survey: Initial9
08/18/2026M00974039-I1Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/18/2026M00974039-A3Open ↗
08/18/2026M00974039-I1Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/18/2026M00974039-I1Open ↗
Showing 1 of 9 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
02/19/2025141026770Open ↗
02/19/2025141026770Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
04/03/2014121330390Open ↗
03/05/2014121713823Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/03/2015122390750Open ↗
10/10/2014121330390Open ↗
▸BISUNDERPINNING (2014)1
10/29/2025122390750Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
02/19/2019140831679Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/22/2015121330390Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/18/2026M00974039-S1Open ↗
▸DOB NOWStructural Peer Review Report1
08/18/2026M00974039-S1Open ↗
▸DOB NOWFinal Survey1
08/18/2026M00974039-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/18/2026M00974039-S7Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/18/2026M00974039-I1Open ↗