← Back
BuildNYC
Health center, child center, clinic
Callen Lorde Community Health Center
356 WEST 18TH STREET · Name © OpenStreetMap contributors · BIN 1013088
💬 Discuss this project
1900Year Built
6Stories
I5Building Class
R8BZoning
24,706 sfGross Floor Area
1Units
0 Active Violations 1 likely answered ▸
Health center, child center, clinic · Owner of record: Community Health Project · 4,600 sf lot · 5.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMichael Callen-audrey Lorde Community Health Center10p · 2 filings · 5 docs
Floor 6Michael Callen-audrey Lorde Community Health CenterUnder Construction5p · 2 filings · 6 docs
Floor 5Michael Callen-audrey Lorde Community Health CenterUnder Construction4p · 2 filings · 6 docs
Floor 4Michael Callen-audrey Lorde Community Health CenterUnder Construction4p · 2 filings · 6 docs
Floor 3Michael Callen-audrey Lorde Community Health CenterUnder Construction5p · 2 filings · 6 docs
Floor 2Michael Callen-audrey Lorde Community Health Center30p · 7 filings · 20 docs
Floor 1Michael Callen-audrey Lorde Community Health Center18p · 4 filings · 16 docs
Site & exteriorMichael Callen-audrey Lorde Community Health Center4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Callen-Lorde5607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants2003/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rinnovo ConstructionGeneral Contractor1607/08/2026
Nion ElectricElectrical303/22/2026
Denko MechanicalFire Protection207/08/2026
Dobs Elevator CompanyElectrical103/21/2026
Core Scaffold SystemsScaffold107/08/2026
A&A PlumbingPlumbing107/08/2026
Bruni ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423906/27/2025
Building Lifecycle
All (98)Filed (11)Permit Issued (12)Signed Off (10)Violation (42)Inspection (9)Special Inspection (14)
06/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/16/2026
Signed off — Alteration
M01223705-I1
04/16/2026
Signed off — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS (PHASE 2B) AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPACNY.
M01207686-I1
04/01/2026
Signed off — Alteration
M01223673-I1
03/30/2026
Signed off — Alteration
M01223725-I1
03/30/2026
Signed off — Alteration
Structural Modifications (PHASE 2B) as per plans. No change of use egress or occupancy.
M01208158-I1
03/30/2026
Signed off — Alteration
Structural Modifications (PHASE 2C) as per plans. No change of use egress or occupancy.
M01223553-I1
03/25/2026
Signed off — Alteration
PHASE 2C - INTERIOR RENOVATIONS . PARTTIONS, DOORS AND CEILING MODIFICATIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
M01243027-I1
03/25/2026
Signed off — Alteration
PHASE 2D - INTERIOR RENOVATIONS WORK TO INCLUDE REMOVAL OF EXISITNG NON EGRESS STAIR (1-2ND FL) AND CLOSURE OF STAIR OPENING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
M01243077-I1
03/25/2026
Signed off — Alteration
MECHANICAL MODIFICATIONS (PHASE 2B) AT SUBJECT LOCATION AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUAPNCY
M01207653-I1
01/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/28/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/08/2026
Permit issued — General Construction
M01309690-I1-GC
01/05/2026
Filed — Alteration
Modification work to include floor repair on floors 3-6 as per plans. No change of use egress or occupancy.
M01309690-I1
10/28/2025
Special inspection requirement — Final
Young Suh
09/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Permit issued — Sprinklers
M01207686-I1-EW-SP
07/01/2025
Permit issued — Sprinklers
M01223705-I1-EW-SP
07/01/2025
Permit issued — General Construction
M01243077-I1-GC
07/01/2025
Permit issued — General Construction
M01243027-I1-GC
06/27/2025
Filed — Alteration
PHASE 2C - INTERIOR RENOVATIONS . PARTTIONS, DOORS AND CEILING MODIFICATIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
M01243027-I1
06/26/2025
Filed — Alteration
PHASE 2D - INTERIOR RENOVATIONS WORK TO INCLUDE REMOVAL OF EXISITNG NON EGRESS STAIR (1-2ND FL) AND CLOSURE OF STAIR OPENING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
M01243077-I1
06/26/2025
Permit issued — Structural
M01223725-I1-ST
06/26/2025
Permit issued — Structural
M01208158-I1-ST
06/26/2025
Permit issued — Structural
M01223553-I1-ST
06/18/2025
Permit issued — Plumbing
M01207686-I1-PL
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/18/2025
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
06/18/2025
Special inspection requirement — Final
Young Suh
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
06/18/2025
Special inspection requirement — Interior lighting power
Young Suh
06/18/2025
Special inspection requirement — Lighting controls
Young Suh
06/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
06/17/2025
Permit issued — Mechanical Systems
M01207653-I1-MS
06/17/2025
Permit issued — Mechanical Systems
M01223673-I1-MS
06/11/2025
Signed off — Alteration
M01063089-I1
06/10/2025
Filed — Alteration
M01223705-I1
06/10/2025
Filed — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS (PHASE 2B) AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPACNY.
M01207686-I1
06/10/2025
Filed — Alteration
M01223673-I1
06/10/2025
Filed — Alteration
M01223725-I1
06/10/2025
Filed — Alteration
Structural Modifications (PHASE 2B) as per plans. No change of use egress or occupancy.
M01208158-I1
06/10/2025
Filed — Alteration
Structural Modifications (PHASE 2C) as per plans. No change of use egress or occupancy.
M01223553-I1
06/10/2025
Filed — Alteration
MECHANICAL MODIFICATIONS (PHASE 2B) AT SUBJECT LOCATION AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUAPNCY
M01207653-I1
06/10/2025
Special inspection requirement — Wood – Seismic Resistance
Young Suh
06/10/2025
Special inspection requirement — Designated Seismic System
Young Suh
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
05/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
04/09/2025
Special inspection requirement — Final
Young Suh
04/08/2025
Special inspection requirement — Sprinkler Systems
Young Suh
06/11/2024
Permit issued — Supported Scaffold
M01063089-I1-SF
06/10/2024
Filed — Alteration
M01063089-I1
10/01/2021
Violation issued (ECB, closed)
Construction
07/20/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
01/14/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRinnovo Construction01/08/2026
DOB NOWSprinklersSigned-offS. Tieger Plumbing Co07/01/2025
DOB NOWSprinklersSigned-offS. Tieger Plumbing Co07/01/2025
DOB NOWGeneral ConstructionSigned-offRinnovo Construction07/01/2025
DOB NOWGeneral ConstructionSigned-offRinnovo Construction07/01/2025
DOB NOWStructuralSigned-offRinnovo Construction06/26/2025
DOB NOWStructuralSigned-offRinnovo Construction06/26/2025
DOB NOWStructuralSigned-offRinnovo Construction06/26/2025
DOB NOWPlumbingSigned-offA&A Plumbing06/18/2025
DOB NOWMechanical SystemsSigned-offRinnovo Construction06/17/2025
DOB NOWMechanical SystemsSigned-offRinnovo Construction06/17/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/11/2024
BIS—ISSUEDRinnovo Construction04/17/2025
BISPLISSUEDSystems 2000 Plumbing Services04/03/2025
BISPLISSUEDA&A Plumbing06/05/2024
BIS—ISSUEDRinnovo Construction05/01/2024
BISPLISSUEDRRP Plumbing05/12/2022
BISPLISSUEDRRP Plumbing05/12/2022
BIS—ISSUEDDynamic Construction Service03/23/2022
BISPLISSUEDRRP Plumbing01/30/2020
BISPLISSUEDRRP Plumbing01/30/2020
BIS—ISSUEDDynamic Construction Service10/16/2019
BIS—ISSUEDDynamic Construction Service10/22/2018
BIS—ISSUEDAcc Construction03/20/2018
BISOTISSUEDAcc Construction02/14/2018
BISOTISSUEDAcc Construction02/13/2018
BISMHISSUEDAcc Construction02/13/2018
BISOTISSUEDDynamic Construction Service11/06/2017
BISMHISSUEDDynamic Construction Service09/12/2016
BISSPISSUEDT.J. Piping & Heating07/14/2015
BISMHISSUEDPen Enterprises05/07/2014
BISOTISSUEDPen Enterprises05/07/2014
BISEQISSUEDPilku Construction Services01/13/2014
BISEQISSUEDPilku Construction Services01/06/2014
BISEQISSUEDPilku Construction Services01/06/2014
BISSPISSUEDT.J. Piping & Heating09/03/2013
BISPLISSUEDSatellite Plumbing08/23/2013
BISEQISSUEDPilku Construction Services07/22/2013
BISOTISSUEDPen Enterprises05/07/2013
BISOTISSUEDPen Enterprises05/07/2013
+ 22 more permits on file
5 projects · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteNion ElectricGeneral Wiring
01/06/2025CancelledNion ElectricGeneral Wiring
08/07/2024CompleteNion ElectricGeneral Wiring
11/11/2019Permit IssuedA.S.K. ElectricalGeneral Wiring
10/28/2019Permit IssuedA.S.K. Electrical—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/28/2025FinalYoung Suhprogress
06/18/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/18/2025Sprayed fire-resistant materialsYoung Suhspecial
06/18/2025FinalYoung Suhprogress
06/18/2025Energy Code Compliance InspectionsYoung Suhprogress
06/18/2025Interior lighting powerYoung Suhenergy_progress
06/18/2025Lighting controlsYoung Suhenergy_progress
06/18/2025Fire-Resistance Rated ConstructionYoung Suhprogress
06/10/2025Wood – Seismic ResistanceYoung Suhspecial
06/10/2025Designated Seismic SystemYoung Suhspecial
05/08/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
05/08/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
04/09/2025FinalYoung Suhprogress
04/08/2025Sprinkler SystemsYoung Suhspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Michael Callen-audrey Lorde Community Health CenterMedical / HealthcareEntire building
Project M01243027 Alteration · LOC Issued · 06/27/2025
Project M01243077 Alteration · LOC Issued · 06/26/2025
Project M01207653 Alteration · LOC Issued · 06/10/2025
Project M01207686 Alteration · LOC Issued · 06/10/2025
Project M01208158 Alteration · LOC Issued · 06/10/2025
Project M01223553 Alteration · LOC Issued · 06/10/2025
Project M01223673 Alteration · LOC Issued · 06/10/2025
Project M01223705 Alteration · LOC Issued · 06/10/2025
Project M01223725 Alteration · LOC Issued · 06/10/2025
Project M01063089 Alteration · LOC Issued · 06/10/2024
Project M01309690 Alteration · On Hold - Applicant Supersede Request Required · 01/05/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 599 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026M01063089-I1Request digital key ↗
08/23/2026M01207653-I1Request digital key ↗
08/23/2026M01207686-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits152
▸BISPLAN / WORK APPROVAL APPLICATION92
10/09/2025120413622Open ↗
04/23/2025123266241Open ↗
04/03/2025120413622Open ↗
Showing 3 of 92 on file for this type
▸BISWORK PERMIT APPLICATION54
04/03/2025120413622Open ↗
03/27/2025120413622Open ↗
06/25/2024123266241Open ↗
Showing 3 of 54 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
01/07/2026120413597Open ↗
12/19/2025120413622Open ↗
12/16/2025121571254Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/30/2024123266241Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications110
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
02/21/2025123266241Open ↗
02/21/2025123266241Open ↗
09/25/2018120413622Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026M01063089-I1Open ↗
08/23/2026M01223673-I1Open ↗
08/23/2026M01223725-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01309690-I1Open ↗
08/31/2026M01243027-I1Open ↗
08/31/2026M01243027-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01207686-I1Open ↗
08/31/2026M01243027-I1Open ↗
08/26/2026M01208158-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment68
▸BISSCHEDULE B - PLUMBING25
10/09/2025120413622Open ↗
10/03/2024123266241Open ↗
09/27/2024123266241Open ↗
Showing 3 of 25 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS7
02/21/2025123266241Open ↗
02/21/2025123266241Open ↗
02/21/2025123266241Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
06/06/2018120412838Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/01/2023123266241Open ↗
01/17/2019123266241Open ↗
Showing 2 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
02/21/2025123266241Open ↗
09/25/2018120413622Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER SYSTEMS2
09/19/2025120413597Open ↗
02/06/2025123266241Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/07/2025123266241Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/07/2025123266241Open ↗
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/23/2026M01223673-I1Open ↗
08/23/2026M01223725-I1Open ↗
08/23/2026M01208158-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/15/2022123266241Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS: WORK UNDER 1000 SQFT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/21/2018123266241Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/16/2020123266241Open ↗
07/10/2020123266241Open ↗
07/10/2020123266241Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
02/07/2025123266241Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/07/2025123266241Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
02/07/2025123266241Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/07/2025123266241Open ↗
▸BISELECTRIC MOTORS1
02/07/2025123266241Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/19/2025120413597Open ↗
07/16/2020123266241Open ↗
07/16/2020123266241Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/06/2025123266241Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
02/06/2025123266241Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/06/2025123266241Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/06/2025123266241Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
01/07/2026120413597Open ↗
12/16/2025121571254Open ↗
09/24/2024120935051Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
04/23/2025123266241Open ↗
11/03/2023123266241Open ↗
10/31/2023123266241Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/12/2022123266241Open ↗
05/12/2022123097068Open ↗
03/21/2018123266241Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER4
04/03/2025120413622Open ↗
03/27/2025120413622Open ↗
06/05/2024123266241Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
09/19/2025120413597Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT47
01/18/2022123266241Open ↗
11/03/2021123266241Open ↗
10/26/2021123266241Open ↗
Showing 3 of 47 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/19/2025120413597Open ↗
09/24/2024120935051Open ↗
05/04/2022120412838Open ↗
▸Filing & Intake Forms73
▸BISEFILING COVER SHEET29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISADDITIONAL INFORMATION28
12/19/2025120413622Open ↗
05/14/2025123266241Open ↗
02/18/2025123266241Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM15
06/05/2024123266241Open ↗
05/01/2024123266241Open ↗
05/12/2022123266241Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
09/24/2024120935051Open ↗
08/24/2021123266241Open ↗
Showing 2 of 5 on file for this type
▸BISSHUTOFF DAMPERS1
02/07/2025123266241Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
08/24/2021123266241Open ↗
▸BISVESTIBULES1
02/07/2025123266241Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
02/06/2025123266241Open ↗
▸BISMAINTENANCE INFORMATION1
02/07/2025123266241Open ↗