← Back
BuildNYC
Two family brick
3567 LACONIA AVENUE
BRONX · BIN 2059318
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R5DZoning
1,764 sfGross Floor Area
2Units
52 Active Violations ▸
Two family brick · 1,850 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedInterior renovation and legalization of rear deck extension8p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2024$859K—SMART BLONDE LLC → Private party$487/sf building
07/25/2023$294K—Private party → SMART BLONDE LLC$167/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Professional Engineering Service112/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KDV Designs103/21/2026
Building Lifecycle
05/27/2026
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST AND NORTH WALLS IN THE 3rd ROOM FROM…
HPD violation · open
05/27/2026
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST…
HPD violation · open
05/27/2026
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT BSMT-APT 1, 1st…
HPD violation · open
04/22/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ. FT AT CEILING IN THE 3rd ROOM FROM EAST AT…
HPD violation · open
04/22/2026
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT…
HPD violation · open
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 12/30/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
12/30/2025——Heating and Air Conditioning Systems
1 project · most recent 12/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/30/2025——Gas, Water/Sanitary
1 project · most recent 06/01/2020
General Wiring
FiledStatusContractorScope
06/01/2020Permit IssuedMeo ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/18/2026HVAC-R and service water heating system controls—energy_progress
04/18/2026HVAC-R and service water heating equipment—energy_progress
04/18/2026HVAC-R and service water piping design and insulation—energy_progress
12/08/2025Mechanical Systems—special
12/08/2025Final—progress
4 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account