← Back
Over six families without stores
357 87 STREET
BROOKLYN · BIN 3153498
💬 Discuss this project
1929Year Built
4Stories
C1Building Class
R5BZoning
10,400 sfGross Floor Area
16Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 357 87TH ST. LLC · 4,000 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GEORGE BUTSIKARIS REALTY, INC1207/08/2026
357 87TH ST. LLC103/22/2026
P M REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.210/29/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS PLAZA P & H INCPlumbing107/08/2026
KING'S PLAZA PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947210/29/2020
Building Lifecycle
All (30)Filed (2)Permit Issued (4)Violation (11)Inspection (1)Special Inspection (12)
11/07/2022
Violation issued (HPD, closed)
I
08/31/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/25/2022
Permit issued — Plumbing
B00419615-I1-PL
08/25/2022
Permit issued — Boiler Equipment
B00419610-I1-BE-EW
11/02/2020
Permit issued — Plumbing
B00419615-I1-PL
11/02/2020
Permit issued — Boiler Equipment
B00419610-I1-BE
10/29/2020
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO DUAL FUEL BURNER. NEW DUAL FUEL BURNER/BOILER FILED UNDER DOB NOW BUILD NO. B00419610. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00419615-I1
10/29/2020
Filed — Alteration
REPLACE BOILER AND BURNER. CHANGE FUEL FROM OIL TO OIL AND GAS. GAS LINE AND METER FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00419610-I1
10/29/2020
Special inspection requirement — HVAC insulation and sealing
Gregory Perotto
10/29/2020
Special inspection requirement — HVAC and service water heating system controls
Gregory Perotto
10/29/2020
Special inspection requirement — HVAC and service water heating equipment
Gregory Perotto
10/29/2020
Special inspection requirement — Maintenance information
Gregory Perotto
10/27/2020
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
10/27/2020
Special inspection requirement — HVAC and service water heating system controls
Gregory Perotto
10/27/2020
Special inspection requirement — Maintenance information
Gregory Perotto
10/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/27/2020
Special inspection requirement — HVAC and service water heating equipment
Gregory Perotto
10/27/2020
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
10/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/27/2020
Special inspection requirement — Heating Systems
Gregory Perotto
06/20/2019
Violation issued (HPD, closed)
C
06/20/2019
Violation issued (HPD, closed)
A
06/20/2019
Violation issued (HPD, closed)
A
06/20/2019
Violation issued (HPD, closed)
A
06/20/2019
Violation issued (HPD, closed)
A
06/20/2019
Violation issued (HPD, open)
B
06/20/2019
Violation issued (HPD, open)
B
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKING'S PLAZA PLBG & HTG I08/25/2022
DOB NOWBoiler EquipmentSigned-offS.J. FUEL CO., INC08/25/2022
DOB NOWPlumbingSigned-offKINGS PLAZA P & H INC11/02/2020
DOB NOWBoiler EquipmentPermit IssuedS.J. FUEL CO., INC11/02/2020
BISEQISSUEDMBR CONTRACTING INC12/10/2003
BISFSISSUEDEMPIRE USED BOILER SUPPLY CO.INC12/08/1995
1 project · most recent 10/29/2020
Gas
FiledStatusContractorScope
10/29/2020Signed-offKING'S PLAZA PLBG & HTG IGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/31/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/29/2020HVAC insulation and sealing Gregory Perottoenergy_progress
10/29/2020HVAC and service water heating system controls Gregory Perottoenergy_progress
10/29/2020HVAC and service water heating equipment Gregory Perottoenergy_progress
10/29/2020Maintenance informationGregory Perottoenergy_progress
10/27/2020Lowest Floor ElevationGregory Perottoprogress
10/27/2020HVAC and service water heating system controls Gregory Perottoenergy_progress
10/27/2020Maintenance informationGregory Perottoenergy_progress
10/27/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
10/27/2020HVAC and service water heating equipment Gregory Perottoenergy_progress
10/27/2020Energy Code Compliance InspectionsGregory Perottoprogress
10/27/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
10/27/2020Heating SystemsGregory Perottospecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00419615-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00419610-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00419610-I1Open ↗
09/23/2026B00419610-I1Open ↗
09/23/2026B00419610-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00419610-I1Open ↗
09/23/2026B00419610-I1Open ↗
08/27/2026B00419615-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/02/2026B00419615-I1Open ↗
09/02/2026B00419610-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/02/2026B00419615-I1Open ↗
08/13/2026B00419610-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026B00419615-I1Open ↗
09/02/2026B00419610-I1Open ↗