← Back
Two stories - detached, small or mid-size
357 ARMSTRONG AVENUE
STATEN ISLAND · BIN 5067078
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3AZoning
2,563 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,230 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 23p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROCCO DEFRANCO ARCHITECT, P.C.901/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GUY MANGOGNA RA503/21/2026
LC EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJC RENOVATIONS LLCGeneral Contractor1907/08/2026
FINE MECHANICAL CORPPlumbing107/08/2026
M.A.C. PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738701/15/2024
Building Lifecycle
All (79)Filed (8)Permit Issued (9)Signed Off (3)Inspection (9)Objection (20)Special Inspection (30)
02/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
02/29/2024
Special inspection requirement — Fenestration areas
anthony santoro
02/29/2024
Special inspection requirement — Maintenance information
anthony santoro
02/29/2024
Special inspection requirement — Permanent certificate
anthony santoro
02/29/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
02/29/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
02/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
02/29/2024
Special inspection requirement — Air barrier — testing
anthony santoro
02/29/2024
Special inspection requirement — Metering
anthony santoro
02/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
02/29/2024
Special inspection requirement — Interior lighting power
anthony santoro
02/29/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
02/29/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
02/29/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
02/29/2024
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
02/29/2024
Special inspection requirement — Mechanical Systems
anthony santoro
02/29/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/29/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
02/29/2024
Special inspection requirement — Final
anthony santoro
02/29/2024
Special inspection requirement — Footing and Foundation
anthony santoro
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/29/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
02/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
01/15/2024
Filed — Alteration CO
CONVERT AN EXISTING 1 STY 1 FAMILY EXISTING TO A 2 FAMILY 2 STY BUILDING WITH OFF-STREET PARKING FOR TWO CARS
S00604003-P5
07/03/2023
Filed — Alteration CO
CONVERT AN EXISTING 1 STY 1 FAMILY EXISTING TO A 2 FAMILY 2 STY BUILDING WITH OFF-STREET PARKING FOR TWO CARS
S00604003-P4
05/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2023
Signed off — Alteration
DOCUMENT FILED FOR NEW PLUMBING WORK IN CONJUNCTION WITH S00604003-I1 DOCUMENT AS INDICATED ON PLANS
S00601309-I1
01/19/2023
Signed off — Alteration
8ft Construction Safety Fence around inside perimeter of Property
S00593905-I1
11/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/25/2022
Objection resolved — Addressed
11/21/2022
Objection raised — Other
11/16/2022
Filed — Alteration
DOCUMENT FILED FOR NEW PLUMBING WORK IN CONJUNCTION WITH S00604003-I1 DOCUMENT AS INDICATED ON PLANS
S00601309-P1
10/28/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
10/25/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2022
Permit issued — Structural
S00604003-I1-ST
10/11/2022
Permit issued — Structural
S00604003-I1-FO-EA
09/28/2022
Objection raised — Scope
09/28/2022
Objection resolved — Addressed
09/12/2022
Filed — Alteration CO
CONVERT AN EXISTING 1 STY 1 FAMILY EXISTING TO A 2 FAMILY 2 STY BUILDING WITH OFF-STREET PARKING FOR TWO CARS
S00604003-P1
09/08/2022
Permit issued — General Construction
S00604003-I1-MS
08/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/11/2022
Permit issued — Plumbing
S00601309-I1-PL
03/28/2022
Permit issued — Construction Fence
S00593905-I1-FN
03/28/2022
Permit issued — Structural
S00604003-I1-GC
02/20/2022
Objection raised — Scope
02/20/2022
Objection resolved — Addressed
02/15/2022
Filed — Alteration
DOCUMENT FILED FOR NEW PLUMBING WORK IN CONJUNCTION WITH S00604003-I1 DOCUMENT AS INDICATED ON PLANS
S00601309-I1
02/02/2022
Permit issued — Mechanical Systems
S00604003-I1-GC
01/27/2022
Permit issued — Construction Fence
S00593905-I1-FN
01/24/2022
Filed — Alteration
8ft Construction Safety Fence around inside perimeter of Property
S00593905-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAJC RENOVATIONS LLC10/14/2022
DOB NOWStructuralSigned-offAJC RENOVATIONS LLC10/11/2022
DOB NOWGeneral ConstructionSigned-offAJC RENOVATIONS LLC09/08/2022
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP04/11/2022
DOB NOWConstruction FenceSigned-offAJC RENOVATIONS LLC03/28/2022
DOB NOWStructuralPermit IssuedAJC RENOVATIONS LLC03/28/2022
DOB NOWMechanical SystemsPermit IssuedAJC RENOVATIONS LLC02/02/2022
DOB NOWConstruction FenceSigned-offAJC RENOVATIONS LLC01/27/2022
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC10/05/2021
BISOTISSUEDSUNRUN INSTALLATION SVC05/04/2022
1 project · most recent 01/15/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2024Signed-offAJC RENOVATIONS LLCAir Conditioning Systems, Heating Systems
Cooling
York Model #: YCD30B33SA 4 tons · Fan Coil Indoor ×3
Heating
Lochinvar Model #: NKC150N 150,000 BTU · Boiler ×3
— AO SMITH PROLINE XE 150,000 BTU · Boiler ×1
2 projects · most recent 05/04/2022
General Wiring
FiledStatusContractorScope
05/04/2022CompleteSUNRUN SOLAR ELECTL CORP—
04/18/2022CompleteRICHMOND ELEC'L CONTR'SGeneral Wiring
1 project · most recent 01/15/2024
Concrete Wood
FiledStatusContractorScope
01/15/2024Signed-offAJC RENOVATIONS LLCConcrete, Wood
1 project · most recent 01/15/2024
Earthwork
FiledStatusContractorScope
01/15/2024Signed-offAJC RENOVATIONS LLCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Pass-Final Fence Non-Directive 14PassView ↗
10/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
02/29/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/29/2024Fenestration areasanthony santoroenergy_progress
02/29/2024Insulation placement and R valuesanthony santoroenergy_progress
02/29/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
02/29/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
02/29/2024Meteringanthony santoroenergy_progress
02/29/2024Ventilation and air distribution systemanthony santoroenergy_progress
02/29/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
02/29/2024Permanent certificateanthony santoroenergy_progress
02/29/2024Maintenance informationanthony santoroenergy_progress
02/29/2024Fenestration air leakageanthony santoroenergy_progress
02/29/2024Air barrier - visual inspectionanthony santoroenergy_progress
02/29/2024Interior lighting poweranthony santoroenergy_progress
02/29/2024Air barrier — testing anthony santoroenergy_progress
02/29/2024Subgrade Inspectionsanthony santorospecial
02/29/2024Wood – Prefabricated I-Joistsanthony santorospecial
02/29/2024Mechanical Systemsanthony santorospecial
02/29/2024Concrete - Cast-In-Placeanthony santorospecial
02/29/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/29/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
02/29/2024Structural Stability – Alterations of existing buildingsanthony santorospecial
02/29/2024Finalanthony santoroprogress
02/29/2024Footing and Foundationanthony santoroprogress
02/29/2024Energy Code Compliance Inspectionsanthony santoroprogress
02/29/2024Fire-Resistance Rated Constructionanthony santoroprogress
Latest 25 of 68.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00520320-I1Request digital key ↗
08/24/2026S00593905-I1Request digital key ↗
08/21/2026S00604003-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
06/30/2022540218334Open ↗
05/04/2022540218334Open ↗
06/07/2021540201976Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/09/2021540201976Open ↗
▸BISWORK PERMIT APPLICATION1
05/04/2022540218334Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
09/09/2021540201976Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026S00604003-P5Open ↗
08/13/2026S00604003-I1Open ↗
08/13/2026S00604003-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026S00604003-P4Open ↗
08/13/2026S00604003-P5Open ↗
08/13/2026S00604003-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00604003-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026S00604003-I1Open ↗
09/02/2026S00604003-I1Open ↗
09/02/2026S00604003-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00520320-I1Open ↗
08/23/2026S00601309-I1Open ↗
08/21/2026S00604003-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026S00604003-I1Open ↗
09/02/2026S00604003-I1Open ↗
09/01/2026S00601309-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/04/2022540218334Open ↗
06/07/2021540201976Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
05/04/2022540218334Open ↗
06/07/2021540201976Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/13/2026S00604003-P5Open ↗
08/13/2026S00604003-P3Open ↗
08/13/2026S00604003-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/04/2022540218334Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00604003-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00604003-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00604003-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026S00520320-I1Open ↗
08/21/2026S00604003-P5Open ↗
08/21/2026S00604003-P4Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/04/2022540218334Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/09/2022540218334Open ↗
09/22/2022540218334Open ↗
05/04/2022540218334Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00604003-I1Open ↗
08/13/2026S00520320-I1Open ↗
08/13/2026S00601309-I1Open ↗
▸BISNYCECC ANALYSIS1
05/04/2022540218334Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/04/2022540218334Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/09/2022540218334Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/09/2022540218334Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/04/2022540218334Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/22/2022540218334Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT5
08/13/2026S00604003-P5Open ↗
08/13/2026S00604003-P4Open ↗
08/13/2026S00604003-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/09/2022540218334Open ↗
09/22/2022540218334Open ↗
05/04/2022540218334Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/09/2021540201976Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00604003-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00604003-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/13/2022540218334Open ↗
12/13/2022540218334Open ↗
05/04/2022540218334Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/10/2021540201976Open ↗
09/09/2021540201976Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/13/2022540218334Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/11/2022540218334Open ↗
09/22/2022540218334Open ↗
05/04/2022540218334Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/09/2022540218334Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
07/27/2022540218334Open ↗
07/27/2022540218334Open ↗
07/06/2022540218334Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/04/2022540218334Open ↗
06/07/2021540201976Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
08/13/2026S00604003-P5Open ↗
08/13/2026S00604003-P3Open ↗
08/13/2026S00604003-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026S00604003-P3Open ↗
08/13/2026S00604003-I1Open ↗
08/13/2026S00604003-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026S00604003-P1Open ↗
08/13/2026S00604003-P4Open ↗
08/13/2026S00604003-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/21/2026S00604003-P5Open ↗
08/21/2026S00604003-P4Open ↗
08/21/2026S00604003-P3Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
06/07/2021540201976Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00604003-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00604003-I1Open ↗