← Back
Primarily 5-6 family with 1 store or office
357 WEST 52 STREET
MANHATTAN · BIN 1025238
💬 Discuss this project
1920Year Built
4Stories
S5Building Class
R8Zoning
6,312 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Primarily 5-6 family with 1 store or office · Owner of record: 357 WEST 52ND STR. CORP · 2,010 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Floor 122p · 1 filing · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
357 WEST 52ND STREET2907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YORKOS ENGINEERING DESIGN CONSULT306/24/2021
SERMAN ENGINEERING109/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CROWN DESIGN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCALPINE CONTRACTING COGeneral Contractor407/08/2026
KG SPRINKLER CORPFire Protection207/08/2026
JGR GROUP INCGeneral Contractor203/21/2026
IRVING BAPTISTEElectrical103/21/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
GOLDS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YORKOS ENGINEERING, DESIG6991306/24/2021
SERMAN ENGINEERING4685109/02/2020
Building Lifecycle
All (35)Filed (4)Permit Issued (8)Signed Off (2)Violation (4)Special Inspection (17)
08/06/2021
Signed off — Alteration
Filing herewith for minor plumbing work which includes cap & removal of existing PL fixtures, replacing & adding new PL fixtures & adding new drains & modifying existing sprinkler system at existing veterinary clinic. No change to use, egress or occupancy
M00385528-I1
07/14/2021
Signed off — Alteration
Filing herewith for new mechanical system as per drawings submitted with this application at existing veterinary clinic. No change in use, occupancy or egress.
M00385525-I1
07/13/2021
Permit issued — Mechanical Systems
M00385525-I1-MS
06/25/2021
Special inspection requirement — Maintenance information
BALTU YORKOS
06/25/2021
Special inspection requirement — HVAC insulation and sealing
BALTU YORKOS
06/25/2021
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
06/25/2021
Special inspection requirement — Final
BALTU YORKOS
06/25/2021
Special inspection requirement — Mechanical Systems
BALTU YORKOS
06/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
06/24/2021
Filed — Alteration
Filing herewith for new mechanical system as per drawings submitted with this application at existing veterinary clinic. No change in use, occupancy or egress.
M00385525-P1
06/18/2021
Permit issued — Sprinklers
M00385528-I1-EW-SP
06/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
06/18/2021
Special inspection requirement — Mechanical Systems
BALTU YORKOS
06/18/2021
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
06/18/2021
Special inspection requirement — Final
BALTU YORKOS
06/18/2021
Special inspection requirement — HVAC insulation and sealing
BALTU YORKOS
06/18/2021
Special inspection requirement — Maintenance information
BALTU YORKOS
11/13/2020
Permit issued — Mechanical Systems
M00385525-I1-MS
11/05/2020
Permit issued — Sprinklers
M00385528-I1-EW-SP
11/05/2020
Permit issued — Plumbing
M00385528-I1-PL
09/08/2020
Permit issued — Sprinklers
M00385528-I1-EW-SP
09/02/2020
Filed — Alteration
M00390227-I1
08/31/2020
Permit issued — Plumbing
M00385528-I1-PL
08/30/2020
Permit issued — Mechanical Systems
M00385525-I1-MS
08/24/2020
Filed — Alteration
Filing herewith for minor plumbing work which includes cap & removal of existing PL fixtures, replacing & adding new PL fixtures & adding new drains & modifying existing sprinkler system at existing veterinary clinic. No change to use, egress or occupancy
M00385528-I1
08/24/2020
Filed — Alteration
Filing herewith for new mechanical system as per drawings submitted with this application at existing veterinary clinic. No change in use, occupancy or egress.
M00385525-I1
08/19/2020
Special inspection requirement — Maintenance information
BALTU YORKOS
08/18/2020
Special inspection requirement — HVAC insulation and sealing
BALTU YORKOS
08/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
08/17/2020
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
08/14/2020
Special inspection requirement — Sprinkler Systems
BALTU YORKOS
01/03/2013
Violation issued (HPD, closed)
C
12/27/2012
Violation issued (HPD, closed)
C
12/27/2012
Violation issued (HPD, closed)
C
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO07/13/2021
DOB NOWSprinklersSigned-offH M SPRINKLER INC06/18/2021
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO11/13/2020
DOB NOWSprinklersSigned-offH M SPRINKLER INC11/05/2020
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC11/05/2020
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC09/08/2020
DOB NOWPlumbingSigned-offGOLDS PLUMBING CORP08/31/2020
DOB NOWMechanical SystemsSigned-offJGR GROUP08/30/2020
BISOTISSUEDMCALPINE CONTRACTING CO01/08/2021
BISOTISSUEDMCALPINE CONTRACTING CO11/04/2020
BISOTISSUEDJGR GROUP INC08/26/2020
BISOTISSUEDGUARANTEED HOME IMPROVEME05/17/2019
BISEQISSUEDS S BRIDGING & SCAFFOLDIN02/27/2013
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/25/2021Maintenance informationBALTU YORKOSenergy_progress
06/25/2021HVAC insulation and sealing BALTU YORKOSenergy_progress
06/25/2021Energy Code Compliance InspectionsBALTU YORKOSprogress
06/25/2021FinalBALTU YORKOSprogress
06/25/2021Mechanical SystemsBALTU YORKOSspecial
06/25/2021Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
06/18/2021Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
06/18/2021Mechanical SystemsBALTU YORKOSspecial
06/18/2021Energy Code Compliance InspectionsBALTU YORKOSprogress
06/18/2021FinalBALTU YORKOSprogress
06/18/2021HVAC insulation and sealing BALTU YORKOSenergy_progress
06/18/2021Maintenance informationBALTU YORKOSenergy_progress
08/19/2020Maintenance informationBALTU YORKOSenergy_progress
08/18/2020HVAC insulation and sealing BALTU YORKOSenergy_progress
08/18/2020Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
08/17/2020Energy Code Compliance InspectionsBALTU YORKOSprogress
08/14/2020Sprinkler SystemsBALTU YORKOSspecial
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00385525-I1Request digital key ↗
08/15/2026M00385525-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00385528-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00385528-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00390227-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
08/05/2021140933747Open ↗
07/29/2021140933747Open ↗
07/28/2021140933747Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION5
01/08/2021140964491Open ↗
11/04/2020140933747Open ↗
05/17/2019140848947Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M00385525-I1Open ↗
08/13/2026M00385525-P1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature11
08/30/2026M00385525-I1Open ↗
08/30/2026M00385525-I1Open ↗
08/30/2026M00385525-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026M00385525-I1Open ↗
08/30/2026M00385525-I1Open ↗
08/24/2026M00385525-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/04/2026M00390227-I1Open ↗
08/13/2026M00385528-I1Open ↗
08/13/2026M00385525-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/14/2020140964491Open ↗
08/14/2020140933747Open ↗
05/16/2019140848947Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/14/2020140933747Open ↗
05/16/2019140848947Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/14/2020140933747Open ↗
05/16/2019140848947Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/19/2019140848947Open ↗
02/28/2013121552391Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/14/2020140964491Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/28/2013121552391Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/28/2013121552391Open ↗
▸Safety & Tenant Protection12
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist4
08/13/2026M00390227-I1Open ↗
08/13/2026M00385525-I1Open ↗
08/13/2026M00385528-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
10/14/2020140964491Open ↗
05/16/2019140848947Open ↗
▸DOB NOWCertificate of No Harassment2
08/13/2026M00385525-I1Open ↗
08/13/2026M00385525-P1Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
08/14/2020140933747Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/08/2021140964491Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/16/2019140848947Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00385525-I1Open ↗
▸Environmental & Asbestos9
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
08/24/2020140933747Open ↗
08/18/2020140933747Open ↗
08/14/2020140933747Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00390227-I1Open ↗
08/13/2026M00385525-P1Open ↗
08/13/2026M00385525-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/14/2020140964491Open ↗
05/16/2019140848947Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00385528-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/05/2021140933747Open ↗
07/29/2021140933747Open ↗
06/28/2021140933747Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/14/2020140964491Open ↗
08/14/2020140933747Open ↗
05/16/2019140848947Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/30/2021140964491Open ↗
06/25/2021140933747Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/19/2019140848947Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/19/2019140848947Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/30/2021140964491Open ↗
06/25/2021140933747Open ↗
12/24/2020140964491Open ↗
Showing 3 of 7 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/14/2020140964491Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/05/2021140933747Open ↗
07/30/2021140964491Open ↗
08/19/2019140848947Open ↗
▸BISSUPERSEDING LETTER1
11/04/2020140933747Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/14/2020140933747Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/28/2013121552391Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
10/14/2020140964491Open ↗
08/14/2020140933747Open ↗
08/19/2019140848947Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/30/2021140964491Open ↗
06/25/2021140933747Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
07/29/2021140964491Open ↗
04/22/2021140933747Open ↗
04/07/2021140933747Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/14/2020140964491Open ↗
08/14/2020140933747Open ↗
05/16/2019140848947Open ↗
▸BISBOROUGH INTAKE FORM2
11/04/2020140933747Open ↗
08/19/2019140848947Open ↗
▸BISEFILING COVER SHEET1
02/28/2013121552391Open ↗