← Back
Shopping center, with or without parking
3579 VICTORY BOULEVARD
STATEN ISLAND · BIN 5036680
💬 Discuss this project
1987Year Built
1Stories
K6Building Class
M1-1Zoning
10,560 sfGross Floor Area
8Units
2 Open Violations ▸FDNY Report ↗
Shopping center, with or without parking · 20,558 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF PREMISES103/22/2026
TOP TOMATO PLAZA503/21/2026
SALVATORE SCIANDRA TRUST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC1201/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROPERTY DAMAGE RESTORATIONGeneral Contractor1007/08/2026
CAPITAL CONTR P&H CORPPlumbing207/08/2026
BENJAMIN DREBINElectrical103/21/2026
JOSEPH ROMAGNOLOElectrical103/21/2026
VINCENT D'ESPOSITOElectrical103/21/2026
RELIABLE HEATING AND COOLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216601/24/2025
A TECH ENGINEERING NYC, P6738101/11/2023
Building Lifecycle
All (75)Filed (12)Permit Issued (7)Signed Off (7)Violation (15)Inspection (7)Special Inspection (27)
06/20/2025
Signed off — Alteration
PROPOSED (1) 2.O TON & (1) 0.75 TON MITSUBISHI OUTDOOR MINI SPLIT UNITS LOCATED ON ROOF W/ ASSOCIATIVE INDOOR UNITS LOCATED ON FIRST FLOOR IN EXIST. NAIL SALON.
S01138598-I1
06/11/2025
Permit issued — Mechanical Systems
S01138598-I1-MS
01/24/2025
Filed — Alteration
PROPOSED (1) 2.O TON & (1) 0.75 TON MITSUBISHI OUTDOOR MINI SPLIT UNITS LOCATED ON ROOF W/ ASSOCIATIVE INDOOR UNITS LOCATED ON FIRST FLOOR IN EXIST. NAIL SALON.
S01138598-I1
01/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
01/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
01/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
12/12/2024
Special inspection requirement — Mechanical Systems
Steven Savino
12/12/2024
Special inspection requirement — Final
Steven Savino
09/16/2024
Violation issued (FDNY_NOV, closed)
03/26/2024
Violation issued (FDNY_NOV, closed)
03/26/2024
Violation issued (FDNY_NOV, closed)
03/19/2024
Signed off — Alteration
Replace a portion of the roof joist and 1-supporting beam to the rear portion of the building that was damaged by fire. No change in use, egress or occupancy.
S08031330-S1
01/17/2024
Signed off — Alteration
INSTALLATION OF 4-SPLIT HVAC UNITS ON THE FIRST FLOOR WITH THE CONDENSERS ON THE ROOF.
S00856517-I1
01/17/2024
Signed off — Alteration
SUB-DIVIDE 1-EXISTING SPACE BACK INTO 3-SPACES AND OUTFIT 1-SPACE INTO A DELI AND MAINTAIN THE 2-OTHER SPACES VACANT AT THIS TIME.
S00856509-I1
01/03/2024
Filed — Alteration
SUB-DIVIDE 1-EXISTING SPACE BACK INTO 3-SPACES AND OUTFIT 1-SPACE INTO A DELI AND MAINTAIN THE 2-OTHER SPACES VACANT AT THIS TIME.
S00856509-P1
01/03/2024
Filed — Alteration
INSTALLATION OF 4-SPLIT HVAC UNITS ON THE FIRST FLOOR WITH THE CONDENSERS ON THE ROOF.
S00856517-P1
11/15/2023
Permit issued — General Construction
S00856509-I1-GC
11/06/2023
Special inspection requirement — Mechanical Systems
Steven Savino
11/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/06/2023
Special inspection requirement — Final
Steven Savino
11/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
11/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/04/2023
Signed off — Alteration
Replace a portion of the roof joist and 1-supporting beam to the rear portion of the building that was damaged by fire. No change in use, egress or occupancy.
S08031330-I1
08/22/2023
Violation issued (FDNY_NOV, closed)
08/22/2023
Violation issued (FDNY_NOV, closed)
07/19/2023
Signed off — Alteration
INSTALLATION OF NEW SANITARY FIXTURES AND GAS APPLIANCES FOR THE SUBDIVISION OF 1-STORE BACK TO 3-STORES.
S00856760-I1
07/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2023
Violation issued (FDNY_NOV, closed)
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/31/2023
Permit issued — Mechanical Systems
S00856517-I1-MS
05/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
05/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
05/30/2023
Filed — Alteration
INSTALLATION OF NEW SANITARY FIXTURES AND GAS APPLIANCES FOR THE SUBDIVISION OF 1-STORE BACK TO 3-STORES.
S00856760-P1
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
04/18/2023
Signed off — Alteration
REPLACE GAS LINES TO EXISTING GAS FIXTURES FOR THE NAIL SALON.
S08043732-I1
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2023
Permit issued — Plumbing
S00856760-I1-PL
04/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2023
Filed — Alteration
INSTALLATION OF 4-SPLIT HVAC UNITS ON THE FIRST FLOOR WITH THE CONDENSERS ON THE ROOF.
S00856517-I1
04/10/2023
Filed — Alteration
SUB-DIVIDE 1-EXISTING SPACE BACK INTO 3-SPACES AND OUTFIT 1-SPACE INTO A DELI AND MAINTAIN THE 2-OTHER SPACES VACANT AT THIS TIME.
S00856509-I1
04/10/2023
Filed — Alteration
INSTALLATION OF NEW SANITARY FIXTURES AND GAS APPLIANCES FOR THE SUBDIVISION OF 1-STORE BACK TO 3-STORES.
S00856760-I1
04/10/2023
Filed — Alteration
REPLACE GAS LINES TO EXISTING GAS FIXTURES FOR THE NAIL SALON.
S08043732-P2
03/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2023
Filed — Alteration
REPLACE GAS LINES TO EXISTING GAS FIXTURES FOR THE NAIL SALON.
S08043732-P1
02/08/2023
Permit issued — Plumbing
S08043732-I1-PL
01/24/2023
Permit issued — Structural
S08031330-S1-ST
01/11/2023
Filed — Alteration
Replace a portion of the roof joist and 1-supporting beam to the rear portion of the building that was damaged by fire. No change in use, egress or occupancy.
S08031330-S1
01/03/2023
Special inspection requirement — Structural Steel - Welding
anthony santoro
01/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
12/30/2022
Special inspection requirement — Final
Steven Savino
12/30/2022
Special inspection requirement — Structural Cold-Formed Steel
anthony santoro
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPROPERTY DAMAGE RESTORATI06/11/2025
DOB NOWGeneral ConstructionSigned-offPROPERTY DAMAGE RESTORATI11/15/2023
DOB NOWMechanical SystemsSigned-offRELIABLE HEATING AND COOL05/31/2023
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP04/13/2023
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP02/08/2023
DOB NOWStructuralSigned-offPROPERTY DAMAGE RESTORATI01/24/2023
DOB NOWGeneral ConstructionSigned-offPROPERTY DAMAGE RESTORATI11/17/2022
BISPLISSUEDCAPITAL CONTR P&H CORP02/20/2019
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/30/2018
BISOTISSUEDREDLINE CONSTRUCTION & MA10/23/2018
BISMHISSUEDMETRO MECHANICAL LLC08/07/2007
BISFPISSUEDWILLIAM HIRD & CO., INC02/24/2005
BISPLISSUEDVITELLO P & MECHANICAL INC12/08/2003
BISFPISSUEDIDEAL FIRE SYSTEM,INC.11/10/2003
BISOTISSUEDAWESOME CONSTRUCTION08/20/2002
BISPLISSUEDVITELLO P & MECHANICAL INC08/02/2002
BISOTISSUEDAWESOME CONSTRUCTION07/29/2002
BISFPISSUEDB & J FIRE INC03/30/1998
BISFPISSUEDFIRE COMMAND CO., INC01/28/1998
1 project · most recent 06/20/2023
General Wiring
FiledStatusContractorScope
06/20/2023CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/10/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
01/10/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
01/10/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
01/10/2025Energy Code Compliance InspectionsSteven Savinoprogress
12/12/2024Mechanical SystemsSteven Savinospecial
12/12/2024FinalSteven Savinoprogress
11/06/2023Mechanical SystemsSteven Savinospecial
11/06/2023Energy Code Compliance InspectionsSteven Savinoprogress
11/06/2023FinalSteven Savinoprogress
11/06/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/06/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
11/06/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/31/2023Energy Code Compliance InspectionsSteven Savinoprogress
05/31/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
05/31/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/31/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
05/30/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
05/30/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/30/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
05/30/2023Energy Code Compliance InspectionsSteven Savinoprogress
01/03/2023Structural Steel - Weldinganthony santorospecial
01/03/2023Structural Stability – Alterations of existing buildingsanthony santorospecial
12/30/2022FinalSteven Savinoprogress
12/30/2022Structural Cold-Formed Steelanthony santorospecial
12/30/2022Structural Steel - Detailsanthony santorospecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Glamour NailRetailFloor 1
Project S01138598 Alteration · LOC Issued · 01/24/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/23/2026S08043732-P1Request digital key ↗
08/23/2026S08043732-I1Request digital key ↗
08/23/2026S08043732-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
02/22/2019520361304Open ↗
12/03/2018520359200Open ↗
12/03/2018520359200Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/28/2019520361304Open ↗
02/22/2019520361304Open ↗
10/25/2018520361304Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/23/2026S08043732-P1Open ↗
08/23/2026S08043732-I1Open ↗
08/23/2026S08031330-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026S08031330-I1Open ↗
09/23/2026S00856760-I1Open ↗
09/23/2026S00856760-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/07/2019520359200Open ↗
05/03/2019520361304Open ↗
12/03/2018520359200Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026S08031330-I1Open ↗
08/29/2026S00856517-P1Open ↗
08/27/2026S08031330-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
08/15/2007510010195Open ↗
07/20/2007510010195Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/25/2018520361304Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/25/2018520361304Open ↗
▸BISPC FULL REPORT1
07/20/2007510010195Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/28/2019520361304Open ↗
02/20/2019520361304Open ↗
10/25/2018520361304Open ↗
▸BISEQUIPMENT USE PERMITS1
08/15/2007510010195Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/15/2007510010195Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/25/2018520361304Open ↗
08/28/2018520359200Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/20/2007510010195Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026S08031330-S1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/03/2019520361304Open ↗
10/25/2018520361304Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/03/2019520361304Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/07/2019520359200Open ↗
05/15/2019520361304Open ↗
05/03/2019520361304Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/25/2018520361304Open ↗
07/20/2007510010195Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/07/2019520359200Open ↗
05/03/2019520361304Open ↗
10/25/2018520361304Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM4
08/07/2019520359200Open ↗
05/03/2019520361304Open ↗
03/28/2019520361304Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
04/24/2019520361304Open ↗
03/28/2019520361304Open ↗
02/20/2019520361304Open ↗
▸BISEFILING COVER SHEET2
10/25/2018520361304Open ↗
08/28/2018520359200Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
08/07/2019520359200Open ↗