← Back
Three families
358 7 STREET
BROOKLYN · BIN 3021895
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,276 sfGross Floor Area
3Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Three families · 1,917 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof1p · 1 filing · 3 docs
Floor 310p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANNA GUGLIELMO TRUST303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/13/2023$3.0M—— → —$931/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DP ARCHITECT704/27/2026
LEVIN ENGINEERING PLLC111/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JODOM MECHANICAL, INCPlumbing207/08/2026
ALVARADO HOME CONSTRUCTIOGeneral Contractor107/08/2026
MOD CONSULTANTS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312304/27/2026
SIA INSPECTIONS LLC7306704/27/2026
Building Lifecycle
All (63)Filed (8)Permit Issued (4)Signed Off (3)Violation (9)Inspection (5)Objection (4)Special Inspection (30)
05/19/2026
Signed off — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-I1
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Air barrier - visual inspection
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Lighting controls
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Permanent certificate
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Insulation placement and R values
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Interior lighting power
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Maintenance information
Dmitriy Polyakov
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOFIA KAPELYAN
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
05/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Dmitriy Polyakov
04/30/2026
Violation issued (HPD, open)
A
04/27/2026
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-P5
03/30/2026
Signed off — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-S1
01/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2025
Special inspection requirement — Maintenance information
Dmitriy Polyakov
12/30/2025
Special inspection requirement — Permanent certificate
Dmitriy Polyakov
12/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitriy Polyakov
12/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dmitriy Polyakov
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Dmitriy Polyakov
12/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitriy Polyakov
12/22/2025
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-P4
12/19/2025
Signed off — Alteration
B01139635-I1
12/09/2025
Permit issued — Plumbing
B00990214-S1-PL
12/05/2025
Permit issued — Mechanical Systems
B01139635-I1-MS
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
03/05/2025
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-P3
01/24/2025
Objection resolved — Addressed
01/21/2025
Objection raised — Other
01/15/2025
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-P1
01/14/2025
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-P2
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Dmitriy Polyakov
01/02/2025
Special inspection requirement — Maintenance information
Dmitriy Polyakov
01/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitriy Polyakov
01/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitriy Polyakov
01/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dmitriy Polyakov
01/02/2025
Special inspection requirement — Permanent certificate
Dmitriy Polyakov
12/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2024
Violation issued (HPD, open)
I
11/22/2024
Filed — Alteration
B01139635-I1
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
10/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOFIA KAPELYAN
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Dmitriy Polyakov
10/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Dmitriy Polyakov
10/07/2024
Special inspection requirement — Maintenance information
Dmitriy Polyakov
10/07/2024
Special inspection requirement — Insulation placement and R values
Dmitriy Polyakov
09/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/31/2024
Permit issued — Plumbing
B00990214-S1-PL
07/16/2024
Objection resolved — Addressed
07/08/2024
Objection raised — Scope
06/28/2024
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-S1
05/29/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/15/2024
Permit issued — General Construction
B00990214-I1-GC
04/03/2024
Violation issued (HPD, open)
A
03/04/2024
Filed — Alteration CO
PROPOSED ALTERATION/RENOVATION AND CHANGE OF USE FROM EXISTING 3 STORY + CELLAR, 3 FAMILY DWELLING UNIT INTO A SINGLE (1) FAMILY DWELLING. WORK PER PLANS FILED HEREIN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO BULK OR EGRESS.
B00990214-I1
03/20/2023
Violation issued (HPD, closed)
A
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC12/09/2025
DOB NOWMechanical SystemsSigned-offMOD CONSULTANTS LLC12/05/2025
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC07/31/2024
DOB NOWGeneral ConstructionPermit IssuedALVARADO HOME CONSTRUCTIO05/15/2024
BISEQISSUEDACUMATE SERVICES, LLC11/25/2016
1 project · most recent 04/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/27/2026Signed-offJODOM MECHANICAL, INCGas, Water/Sanitary
2 projects · most recent 11/19/2025
General Wiring
FiledStatusContractorScope
11/19/2025CompleteRONEY ELECTRIC INCGeneral Wiring
08/01/2024CompleteMARKS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/29/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/08/2026Energy Code Compliance InspectionsDmitriy Polyakovprogress
05/08/2026Air barrier - visual inspectionDmitriy Polyakovenergy_progress
05/08/2026Lighting controlsDmitriy Polyakovenergy_progress
05/08/2026Permanent certificateDmitriy Polyakovenergy_progress
05/08/2026Insulation placement and R valuesDmitriy Polyakovenergy_progress
05/08/2026Interior lighting powerDmitriy Polyakovenergy_progress
05/08/2026Maintenance informationDmitriy Polyakovenergy_progress
05/08/2026Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
05/08/2026Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
05/08/2026Fire-Resistance Rated ConstructionDmitriy Polyakovprogress
12/30/2025Maintenance informationDmitriy Polyakovenergy_progress
12/30/2025Permanent certificateDmitriy Polyakovenergy_progress
12/30/2025HVAC-R and service water heating system controlsDmitriy Polyakovenergy_progress
12/30/2025HVAC-R and service water piping design and insulationDmitriy Polyakovenergy_progress
12/30/2025Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
12/30/2025Energy Code Compliance InspectionsDmitriy Polyakovprogress
12/30/2025HVAC-R and service water heating equipmentDmitriy Polyakovenergy_progress
01/02/2025Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
01/02/2025Energy Code Compliance InspectionsDmitriy Polyakovprogress
01/02/2025Maintenance informationDmitriy Polyakovenergy_progress
01/02/2025HVAC-R and service water heating system controlsDmitriy Polyakovenergy_progress
01/02/2025HVAC-R and service water heating equipmentDmitriy Polyakovenergy_progress
01/02/2025HVAC-R and service water piping design and insulationDmitriy Polyakovenergy_progress
01/02/2025Permanent certificateDmitriy Polyakovenergy_progress
10/07/2024Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
Latest 25 of 34.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026B01139635-I1Request digital key ↗
08/17/2026B00990214-S1Request digital key ↗
08/17/2026B00990214-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
01/22/2024340447948Open ↗
11/21/2023340447948Open ↗
10/13/2023340447948Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/23/2016340447948Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00990214-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature28
08/27/2026B00990214-S1Open ↗
08/27/2026B00990214-S1Open ↗
08/27/2026B00990214-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01139635-I1Open ↗
08/17/2026B00990214-I1Open ↗
08/17/2026B00990214-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B00990214-S1Open ↗
08/25/2026B00990214-P1Open ↗
08/25/2026B00990214-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/23/2016340447948Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/23/2016340447948Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/23/2016340447948Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00990214-P1Open ↗
08/13/2026B00990214-P5Open ↗
08/13/2026B00990214-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/23/2016340447948Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026B01139635-I1Open ↗
08/17/2026B00990214-S1Open ↗
08/17/2026B00990214-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/23/2016340447948Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/23/2016340447948Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/17/2026B00990214-P1Open ↗
08/17/2026B00990214-P5Open ↗
08/17/2026B00990214-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00990214-I1Open ↗