← Back
STATEN ISLAND
358 BRADFORD AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5176033
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM TRINITY HOLDINGS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS808/30/2024
STANLEY M. KREBUSHEVSKI, R.A.310/17/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor507/08/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT84721008/30/2024
Building Lifecycle
All (61)Filed (11)Permit Issued (6)Signed Off (3)Inspection (7)Objection (4)Special Inspection (30)
09/09/2024
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S2
09/05/2024
Permit issued — Mechanical Systems
S00820326-S2-MS
08/30/2024
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P4
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
08/30/2024
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
08/30/2024
Special inspection requirement — Final
Stanislav Pilipenko
08/30/2024
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
08/30/2024
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
08/26/2024
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S1
07/24/2024
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S3
07/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
05/30/2024
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P7
05/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
05/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
05/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
05/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
05/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
05/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
05/09/2024
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P6
05/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
05/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
05/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
05/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
05/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
05/08/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2024
Permit issued — Curb Cut
S00820326-S3-CC
04/12/2024
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S3
03/04/2024
Permit issued — Plumbing
S00820326-S1-PL
02/27/2024
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P5
02/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
02/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
02/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
02/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
02/27/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
12/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2023
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P3
11/10/2023
Objection resolved — Addressed
11/09/2023
Objection raised — Scope
10/17/2023
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P2
09/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/29/2023
Objection resolved — Addressed
08/04/2023
Objection raised — Scope
08/03/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/28/2023
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-P1
07/26/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/26/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/21/2023
Permit issued — Plumbing
S61197984-S1-PL
07/20/2023
Permit issued — Plumbing
S00820326-S1-PL
07/17/2023
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S2
07/17/2023
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM IN NEW RESIDENCE
S00820326-S1
07/12/2023
Permit issued — Foundation
S00820326-I1-GC-CX
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBEYER CONSTRUCTION09/05/2024
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION04/17/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/04/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/21/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/20/2023
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION07/12/2023
1 project · most recent 08/30/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/30/2024Signed-offBEYER CONSTRUCTION CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Luxaire CC: XAFB36EBCN1A CU: TCD2B30S21SA 4 tons · Condensing Unit ×4
CC: XAHB36DXXN1A CU: TCD2B30S21SA 3 tons · Condensing Unit ×4
Heating
Luxaire TM9E080B12MP12B 60,000 BTU · Furnace ×2
Z8ES080B12SMPS1A 40,000 BTU · Furnace ×2
Ventilation
__Junk__ NOT AVAILABLE 100 CFM · Erv ×4
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×2
1 project · most recent 08/30/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/30/2024Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CancelledEVEREST ELEC'L CONTRG INCGeneral Wiring
09/26/2023CompleteEVEREST ELEC'L CONTRG INCGeneral Wiring
1 project · most recent 08/30/2024
Wood
FiledStatusContractorScope
08/30/2024Signed-offBEYER CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/03/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/26/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
08/30/2024FinalStanislav Pilipenkoprogress
08/30/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/30/2024Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
08/30/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/30/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/30/2024Mechanical SystemsStanislav Pilipenkospecial
08/30/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/30/2024Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
08/30/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/30/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
05/31/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
05/31/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
05/31/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
05/30/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
05/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
05/30/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
05/30/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
05/30/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
05/30/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
05/08/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
05/08/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
05/08/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
05/08/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
05/08/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
05/08/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
Latest 25 of 81.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026S00820326-P7Request digital key ↗
08/22/2026S00820326-P6Request digital key ↗
08/22/2026S00820326-P5Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00820326-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026S00820326-P2Open ↗
09/01/2026S00820326-P2Open ↗
09/01/2026S00820326-P5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026S00820326-P2Open ↗
09/01/2026S00820326-P2Open ↗
09/01/2026S00820326-P5Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026S00820326-I1Open ↗
08/22/2026S00820326-P3Open ↗
08/22/2026S00820326-P1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00820326-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00820326-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00820326-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00820326-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00820326-I1Open ↗
08/15/2026S00820326-P1Open ↗
08/13/2026S00820326-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00820326-I1Open ↗