← Back
Three families
359 EAST 26 STREET
BROOKLYN · East Flatbush-Erasmus · BIN 3119887
💬 Discuss this project
1905Year Built
2Stories
C0Building Class
R6Zoning
3,282 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 359 EAST 26 STREET LLC · 2,000 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Sub-Basement4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2023$925K—Private party → Private party$282/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KR DESIGN GROUP501/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC503/21/2026
QUICK FILING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHAKER WAY LLCGeneral Contractor303/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PATH ARCHITECTURE P.C.1567501/06/2024
Building Lifecycle
All (100)Filed (5)Permit Issued (2)Signed Off (2)Violation (60)Inspection (5)Special Inspection (26)
05/04/2026
Violation issued (HPD, open)
A
06/09/2025
Violation issued (HPD, closed)
A
01/10/2024
Signed off — Alteration
INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDING. EXTERIOR WORK-REMOVAL OF ILLEGAL ADDITION AT REAR OF THE BUILDING. CORRECTION OF 3 ECB VIOLATIONS. PLUMBING TO BE FILED SEPERATELLY.
B00854226-I1
01/10/2024
Signed off — Alteration
INTERIOR RENOVATIONS OF EXIST. 3 FAMILY BUILDING- RELOCATED EXISTING KITCHENETTES, REPLACED EXISTING KITCHEN AND PROPOSED BATHROOM ON EACH FLOOR- PLUMBING WORK IN CONJUNCTION WITH OT#B00854226-I1. NO CHANGE TO USE , EGRESS AND OCCUPANCY.
B00857348-I1
01/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
WOJCIECH OKTAWIEC
01/08/2024
Special inspection requirement — Energy Code Compliance Inspections
KHINE PWINT
01/08/2024
Special inspection requirement — Final
KHINE PWINT
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
01/08/2024
Special inspection requirement — Lighting in dwelling units
KHINE PWINT
01/08/2024
Special inspection requirement — Maintenance information
KHINE PWINT
01/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
KHINE PWINT
01/08/2024
Special inspection requirement — Interior lighting power
KHINE PWINT
01/08/2024
Special inspection requirement — Fenestration areas
KHINE PWINT
01/08/2024
Special inspection requirement — Insulation placement and R values
KHINE PWINT
01/06/2024
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDING. EXTERIOR WORK-REMOVAL OF ILLEGAL ADDITION AT REAR OF THE BUILDING. CORRECTION OF 3 ECB VIOLATIONS. PLUMBING TO BE FILED SEPERATELLY.
B00854226-P2
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
WOJCIECH OKTAWIEC
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
KHINE PWINT
01/05/2024
Special inspection requirement — Final
KHINE PWINT
01/05/2024
Special inspection requirement — Maintenance information
KHINE PWINT
01/05/2024
Special inspection requirement — Fenestration areas
KHINE PWINT
01/05/2024
Special inspection requirement — Interior lighting power
KHINE PWINT
01/05/2024
Special inspection requirement — Lighting in dwelling units
KHINE PWINT
01/05/2024
Special inspection requirement — Insulation placement and R values
KHINE PWINT
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
KHINE PWINT
11/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
KHINE PWINT
08/07/2023
Special inspection requirement — Maintenance information
KHINE PWINT
08/04/2023
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDING. EXTERIOR WORK-REMOVAL OF ILLEGAL ADDITION AT REAR OF THE BUILDING. CORRECTION OF 3 ECB VIOLATIONS. PLUMBING TO BE FILED SEPERATELLY.
B00854226-P1
08/04/2023
Filed — Alteration
INTERIOR RENOVATIONS OF EXIST. 3 FAMILY BUILDING- RELOCATED EXISTING KITCHENETTES, REPLACED EXISTING KITCHEN AND PROPOSED BATHROOM ON EACH FLOOR- PLUMBING WORK IN CONJUNCTION WITH OT#B00854226-I1. NO CHANGE TO USE , EGRESS AND OCCUPANCY.
B00857348-P2
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
KHINE PWINT
08/03/2023
Special inspection requirement — Maintenance information
KHINE PWINT
05/11/2023
Permit issued — Plumbing
B00857348-I1-PL
04/10/2023
Filed — Alteration
INTERIOR RENOVATIONS OF EXIST. 3 FAMILY BUILDING- RELOCATED EXISTING KITCHENETTES, REPLACED EXISTING KITCHEN AND PROPOSED BATHROOM ON EACH FLOOR- PLUMBING WORK IN CONJUNCTION WITH OT#B00854226-I1. NO CHANGE TO USE , EGRESS AND OCCUPANCY.
B00857348-I1
04/07/2023
Permit issued — General Construction
B00854226-I1-GC-CX
04/04/2023
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING 3 FAMILY BUILDING. EXTERIOR WORK-REMOVAL OF ILLEGAL ADDITION AT REAR OF THE BUILDING. CORRECTION OF 3 ECB VIOLATIONS. PLUMBING TO BE FILED SEPERATELLY.
B00854226-I1
03/22/2023
Violation issued (HPD, closed)
A
12/18/2022
Violation issued (HPD, closed)
C
12/18/2022
Violation issued (HPD, closed)
C
12/18/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
A
12/15/2022
Violation issued (HPD, closed)
A
12/15/2022
Violation issued (HPD, closed)
A
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, open)
C
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
B
12/15/2022
Violation issued (HPD, open)
C
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
B
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
B
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING05/11/2023
DOB NOWGeneral ConstructionSigned-offSHAKER WAY LLC04/07/2023
1 project · most recent 05/02/2023
General Wiring
FiledStatusContractorScope
05/02/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/08/2024Fire-Resistance Rated ConstructionWOJCIECH OKTAWIECprogress
01/08/2024Energy Code Compliance InspectionsKHINE PWINTprogress
01/08/2024FinalKHINE PWINTprogress
01/08/2024Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
01/08/2024Lighting in dwelling unitsKHINE PWINTenergy_progress
01/08/2024Maintenance informationKHINE PWINTenergy_progress
01/08/2024Fenestration and door U-factor and product ratingsKHINE PWINTenergy_progress
01/08/2024Interior lighting powerKHINE PWINTenergy_progress
01/08/2024Fenestration areasKHINE PWINTenergy_progress
01/08/2024Insulation placement and R valuesKHINE PWINTenergy_progress
01/05/2024Fire-Resistance Rated ConstructionWOJCIECH OKTAWIECprogress
01/05/2024Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
01/05/2024Energy Code Compliance InspectionsKHINE PWINTprogress
01/05/2024FinalKHINE PWINTprogress
01/05/2024Maintenance informationKHINE PWINTenergy_progress
01/05/2024Fenestration areasKHINE PWINTenergy_progress
01/05/2024Interior lighting powerKHINE PWINTenergy_progress
01/05/2024Lighting in dwelling unitsKHINE PWINTenergy_progress
01/05/2024Insulation placement and R valuesKHINE PWINTenergy_progress
01/05/2024Fenestration and door U-factor and product ratingsKHINE PWINTenergy_progress
08/07/2023Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
08/07/2023Energy Code Compliance InspectionsKHINE PWINTprogress
08/07/2023Maintenance informationKHINE PWINTenergy_progress
08/03/2023Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
08/03/2023Energy Code Compliance InspectionsKHINE PWINTprogress
Latest 25 of 26.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00854226-P2Request digital key ↗
08/27/2026B00854226-P1Request digital key ↗
08/27/2026B00854226-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026B00854226-P2Open ↗
09/28/2026B00854226-P2Open ↗
09/28/2026B00854226-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00854226-P1Open ↗
08/27/2026B00854226-I1Open ↗
08/27/2026B00857348-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026B00854226-P2Open ↗
09/23/2026B00854226-I1Open ↗
09/01/2026B00857348-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00854226-I1Open ↗
08/27/2026B00854226-P1Open ↗
08/27/2026B00857348-P2Open ↗
Showing 3 of 5 on file for this type