← Back
One family attached or semi-detached
359 TANGLEWOOD DRIVE
STATEN ISLAND · Great Kills-Eltingville · BIN 5061118
💬 Discuss this project
1984Year Built
2Stories
A5Building Class
R3-2Zoning
1,440 sfGross Floor Area
1Units
One family attached or semi-detached · 2,167 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI104/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841104/14/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/23/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01210220-I1
04/16/2025
Permit issued — Solar
S01210220-I1-SL
04/14/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01210220-I1
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
04/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
04/14/2025
Special inspection requirement — Final
ROBERT MASONE
04/14/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC04/16/2025
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025CompleteNY SOLAR ELECTRICAL LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/14/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
04/14/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
04/14/2025Energy Code Compliance InspectionsROBERT MASONEprogress
04/14/2025FinalROBERT MASONEprogress
04/14/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01210220-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026S01210220-I1Open ↗
08/27/2026S01210220-I1Open ↗
08/27/2026S01210220-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01210220-I1Open ↗
08/27/2026S01210220-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01210220-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01210220-I1Open ↗