← Back
BuildNYC
Shopping center, with or without parking
Empire Outlets
35B RICHMOND TERRACE · BIN 5164579
💬 Discuss this project
2016Year Built
2Stories
K6Building Class
M1-1Zoning
492,962 sfGross Floor Area
73Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: St George Outlet Development · 353,627 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThe Lure Group14p · 3 filings · 20 docs
Floor 5Mandee, Charlotte Russe8p · 3 filings · 12 docs
Floor 4Mandee, Charlotte Russe8p · 3 filings · 12 docs
Floor 3Mandee, Charlotte Russe62p · 9 filings · 20 docs
Floor 2Levi's, Mandee +134p · 7 filings · 20 docs
Floor 1Mandee, Charlotte Russe +218p · 10 filings · 20 docs
Site & exteriorEmpire Beer Garden, Guess +3Under Construction13p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St George Outlet Development15107/08/2026
EO Staten Island Property Owner1309/02/2026
Lure Group807/08/2026
Crocs103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar803/21/2026
Rogers Calvanico Group803/21/2026
Codeworx603/21/2026
ADG Architecture Design403/21/2026
Municipal Building Consultants103/21/2026
Mago Architecture1003/21/2026
Arup103/21/2026
JP Expedite1603/21/2026
G Plan Design Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger907/08/2026
Five Borough FPPlumbing403/22/2026
A1 SpecializedSign hanger407/08/2026
Interboro Sign & Electrical MaintenanceSign hanger407/08/2026
T.S.M. Mechanicalspecialty_contractor307/08/2026
L.S. Sign CoSign hanger307/08/2026
MPC Plumbing & HeatingPlumbing207/08/2026
Eastern 2000General Contractor203/21/2026
Winick ProductionsGeneral Contractor203/21/2026
Ampere Electrical ServicesElectrical203/22/2026
M & M Control WiringElectrical103/22/2026
Five Borough NYCFire Protection107/08/2026
Mercury Fire SuppFire Protection107/08/2026
RJS Electrical ContngElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting1688103/04/2025
SRA Planning & Expediting5677803/31/2022
Hsu & Associates8025104/28/2021
Building Lifecycle
All (167)Filed (37)Permit Issued (28)Signed Off (20)Violation (9)Inspection (5)Objection (38)Special Inspection (30)
06/12/2026
Permit issued — Sign
S01400773-I1-SG
06/12/2026
Permit issued — Sign
S01400772-I1-SG
06/12/2026
Permit issued — Sign
S01400771-I1-SG
06/12/2026
Permit issued — Sign
S01400774-I1-SG
06/02/2026
Filed — Alteration
S01400774-I1
06/02/2026
Filed — Alteration
S01400773-I1
06/02/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - EMPIRE BEER GARDEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01400772-I1
06/02/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - EMPIRE BEER GARDEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01400771-I1
06/02/2026
Special inspection requirement — Final
Ryan Hung
06/02/2026
Special inspection requirement — Final
Ryan Hung
06/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/08/2025
Permit issued — Sprinklers
S01177832-I1-EW-SP
03/04/2025
Filed — Alteration
SPRINKLER MODIFICATIONS ON THE 2ND FLOOR, SUITE 335 A&B AS PER PLANS SUBMITTED HEREWITH. WORK WILL AFFECT THE USE, OCCUPANCY. OR EGRESS.
S01177832-I1
03/04/2025
Filed — Alteration
DEMOLITION AND CONSTRUCTION OF NON-BEARING PARTITIONS ON THE 2ND FLOOR, SUITE 335 A&B AS PER PLANS SUBMITTED HEREWITH. WORK WILL AFFECT THE USE, OCCUPANCY. OR EGRESS.
S01177804-I1
03/04/2025
Filed — Alteration
S01177829-I1
02/06/2025
Special inspection requirement — Final
02/06/2025
Special inspection requirement — Mechanical Systems
02/06/2025
Special inspection requirement — Final
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/06/2025
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
04/07/2023
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - MANDEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00801241-I1
03/03/2023
Signed off — Alteration
S00801240-I1
03/03/2023
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-SIDED PROJECTING ACCESSORY SIGN - IN PROPERTY LINES - CHARLOTTE RUSSE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00801242-I1
02/24/2023
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - MANDEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00801241-P1
02/24/2023
Special inspection requirement — Final
INDRAJEET VAGHA
02/06/2023
Special inspection requirement — Final
INDRAJEET VAGHA
01/31/2023
Permit issued — Sign
S00801241-I1-SG
01/31/2023
Permit issued — Sign
S00801240-I1-SG
01/31/2023
Permit issued — Sign
S00801242-I1-SG
01/27/2023
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - MANDEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00801241-I1
01/27/2023
Filed — Alteration
S00801240-I1
01/27/2023
Filed — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-SIDED PROJECTING ACCESSORY SIGN - IN PROPERTY LINES - CHARLOTTE RUSSE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S00801242-I1
01/27/2023
Special inspection requirement — Final
INDRAJEET VAGHA
01/27/2023
Special inspection requirement — Final
INDRAJEET VAGHA
09/13/2022
Permit issued — Mechanical Systems
S00390764-S1-MS
05/23/2022
Signed off — Alteration
INSTALL HOOD, EXHAUST FAN AND RETURNED AIR FAN AS REQUIRED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00437357-I1
04/22/2022
Objection resolved — Addressed
04/22/2022
Special inspection requirement — Public Assembly Emergency Lighting
Christopher Carrano
04/07/2022
Objection resolved — Addressed
03/31/2022
Filed — Alteration
Hvac equipment and ductwork for restaurant ,compressors for refrigeration boxes
S00390764-S1
03/24/2022
Objection resolved — Addressed
03/24/2022
Objection resolved — Addressed
03/24/2022
Objection resolved — Addressed
03/14/2022
Objection resolved — Addressed
03/14/2022
Objection resolved — Addressed
03/14/2022
Objection resolved — Addressed
03/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
03/10/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
03/10/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
03/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
03/10/2022
Special inspection requirement — Shutoff dampers
WILLIAM MONTAGUE
03/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
03/08/2022
Permit issued — Mechanical Systems
S00437357-I1-MS
03/07/2022
Special inspection requirement — Final
WILLIAM MONTAGUE
03/07/2022
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
03/04/2022
Objection resolved — Addressed
03/04/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMad Signs06/12/2026
DOB NOWSignPermit IssuedMad Signs06/12/2026
DOB NOWSignPermit IssuedMad Signs06/12/2026
DOB NOWSignPermit IssuedMad Signs06/12/2026
DOB NOWSprinklersSigned-offFive Borough NYC04/08/2025
DOB NOWSignSigned-offWeinfeld, Elliot01/31/2023
DOB NOWSignSigned-offWeinfeld, Elliot01/31/2023
DOB NOWSignSigned-offWeinfeld, Elliot01/31/2023
DOB NOWMechanical SystemsPermit IssuedT.S.M. Mechanical09/13/2022
DOB NOWMechanical SystemsSigned-offEastern 200003/08/2022
DOB NOWMechanical SystemsSigned-offT.S.M. Mechanical01/17/2022
DOB NOWPlumbingSigned-offMPC Plumbing & Heating08/30/2021
DOB NOWSprinklersSigned-offMercury Fire Supp08/10/2021
DOB NOWStructuralSigned-offWinick Productions06/07/2021
DOB NOWPlumbingSigned-offMPC Plumbing & Heating09/23/2020
DOB NOWSignSigned-offSigns Cad07/12/2019
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance05/02/2019
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance04/30/2019
DOB NOWSignSigned-offSigns Cad04/26/2019
DOB NOWSignSigned-offSigns Cad04/26/2019
DOB NOWSignSigned-offSigns Cad04/26/2019
DOB NOWSignSigned-offSigns Cad04/26/2019
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance04/03/2019
DOB NOWSignSigned-offInterboro Sign & Electrical Maintenance02/15/2019
DOB NOWSignSigned-offSigns Cad02/04/2019
DOB NOWSignSigned-offSigns Cad02/04/2019
DOB NOWSignSigned-offSigns Cad02/04/2019
DOB NOWSignSigned-offSigns Cad02/04/2019
BISOTISSUEDG & B Development08/09/2021
BISOTISSUEDG & B Development11/20/2020
BISOTISSUEDG & B Development08/24/2020
BISMHISSUEDG-Net Construction04/19/2019
BISMHISSUEDTitan Construction04/19/2019
BISOTISSUEDG-Net Construction04/19/2019
BISOTISSUEDG-Net Construction04/19/2019
BISPLISSUEDCapital Contracting P&H03/26/2019
BISPLISSUEDHudson Plumbing & MCH03/15/2019
BISOTISSUEDGo Green Construction03/14/2019
BISPLISSUEDJpi Plumbing & Heating02/19/2019
BISPLISSUEDCasino Mechanical02/12/2019
+ 38 more permits on file
1 project · most recent 03/31/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2022Permit IssuedT.S.M. MechanicalAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUY 24,000 BTU · Split System ×2
MXZ 48,000 BTU · Heat Pump Outdoor ×2
Trane Precident 120,000 BTU ×2
Heating
Mitsubishi Electric MXZ 48,000 BTU · Heat Pump Outdoor ×1
MXz 36,000 BTU · Heat Pump Outdoor ×1
Trane Precident 1,500,000 BTU ×2
Ventilation
Captiveaire AM 525 CFM · Kitchen Exhaust ×1
Amd 3,400 CFM · Makeup Air ×1
DU 4,000 CFM · Kitchen Exhaust ×1
Mitsubishi Electric Loosnay 600 CFM · Erv ×2
1 project · most recent 03/04/2025
FiledStatusContractorScope
03/04/2025Signed-offFive Borough NYC9 heads
25 projects · most recent 05/14/2026
General Wiring Lighting
FiledStatusContractorScope
05/14/2026Permit IssuedAll Pro Electric of N.Y—
05/14/2026Permit IssuedAll Pro Electric of N.Y—
05/14/2026Permit IssuedAll Pro Electric of N.Y—
05/14/2026Permit IssuedAll Pro Electric of N.Y—
03/05/2025CompleteRJS Electrical ContngGeneral Wiring
04/13/2023CompleteSNB Electrical Contng—
04/13/2023CompleteSNB Electrical Contng—
04/13/2023CompleteSNB Electrical Contng—
12/06/2019Permit IssuedR. Donovan & Son ElectricGeneral Wiring
08/27/2019CompleteAmpere Electrical Services—
07/01/2019CompleteWebsite Electric—
05/31/2019CompleteJohn Michael Electrical ContgGeneral Wiring
05/02/2019CompleteAmpere Electrical Services—
05/02/2019CompleteAmpere Electrical Services—
05/02/2019CompleteAmpere Electrical Services—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
06/02/2026FinalRyan Hungprogress
06/02/2026FinalRyan Hungprogress
02/06/2025Final—progress
02/06/2025Mechanical Systems—special
02/06/2025Final—progress
02/06/2025Fire-Resistant Penetrations and Joints—special
02/06/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/24/2023FinalINDRAJEET VAGHAprogress
02/06/2023FinalINDRAJEET VAGHAprogress
01/27/2023FinalINDRAJEET VAGHAprogress
01/27/2023FinalINDRAJEET VAGHAprogress
04/22/2022Public Assembly Emergency LightingChristopher Carranoprogress
03/10/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
03/10/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
03/10/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
03/10/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
03/10/2022Shutoff dampersWILLIAM MONTAGUEenergy_progress
03/10/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
03/07/2022FinalWILLIAM MONTAGUEprogress
03/07/2022Mechanical SystemsWILLIAM MONTAGUEspecial
08/02/2021Sprinkler SystemsWILLIAM MONTAGUEspecial
07/26/2021Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
07/26/2021Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
07/26/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
07/26/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Empire Beer GardenRestaurant / Food Service—
Project S01400772 Alteration · Permit Entire · 06/02/2026
Project S01400773 Alteration · Permit Entire · 06/02/2026
Levi'sRetailFloor 2
Project S01177804 Alteration · Approved · 03/04/2025
Project S01177829 Alteration · Approved · 03/04/2025
Project S01177832 Alteration · Permit Entire · 03/04/2025
Project S00147487 Alteration · LOC Issued · 03/28/2019
Charlotte RusseRetailFloors 1–5
Project S00801240 Alteration · LOC Issued · 01/27/2023
Project S00801242 Alteration · LOC Issued · 01/27/2023
MandeeRetailFloors 1–5
Project S00801241 Alteration · LOC Issued · 01/27/2023
Cotton on GroupRetailFloor 1
Project S00157034 Alteration · LOC Issued · 04/25/2019
Project S00157364 Alteration · LOC Issued · 04/25/2019
Project S00157366 Alteration · LOC Issued · 04/25/2019
Project S00157367 Alteration · LOC Issued · 04/25/2019
GuessRetailFloor 2
Project S00147494 Alteration · LOC Issued · 04/12/2019
Francesca'sRetailFloor 2
Project S00147479 Alteration · LOC Issued · 04/08/2019
CrocsRetailFloor 1
Project S00074786 Alteration · LOC Issued · 02/04/2019
Project S00074794 Alteration · LOC Issued · 02/04/2019
Project S00074802 Alteration · LOC Issued · 02/04/2019
Project S00074805 Alteration · LOC Issued · 02/04/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 798 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch18
08/26/2026S00074805-I1Request digital key ↗
08/26/2026S00074802-I1Request digital key ↗
08/26/2026S00074786-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sign9
08/26/2026S00120068-I1Request digital key ↗
08/26/2026S00147487-I1Request digital key ↗
08/26/2026S00147479-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026S00388423-I1Request digital key ↗
08/15/2026S00388423-P1Request digital key ↗
08/15/2026S00388423-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026S00391391-I1Request digital key ↗
08/15/2026S00391391-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026S00390764-I1Request digital key ↗
08/25/2026S00437357-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026S00367428-I1Request digital key ↗
08/15/2026S00367428-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/25/2026S00524170-I1Request digital key ↗
▸Applications & Permits161
▸BISPLAN / WORK APPROVAL APPLICATION90
11/18/2024520208819Open ↗
02/07/2023520208819Open ↗
02/07/2023520208819Open ↗
Showing 3 of 90 on file for this type
▸BISWORK PERMIT APPLICATION64
11/20/2020540176441Open ↗
08/24/2020540176441Open ↗
Showing 2 of 64 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/21/2020540176441Open ↗
08/21/2020540176441Open ↗
▸BISDOT Permit - House Connection2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF1
08/23/2022540176441Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISFLOOD ZONE COMPLIANCE4
02/10/2023520262974Open ↗
02/10/2023520262974Open ↗
06/14/2022540176441Open ↗
Showing 3 of 4 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/21/2023520208819Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/21/2020540176441Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications175
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
02/10/2023520335762Open ↗
03/04/2020520354358Open ↗
12/11/2019520353153Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/26/2026S00074802-I1Open ↗
08/26/2026S00147487-I1Open ↗
08/26/2026S00147494-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
10/13/2026S00521450-I1Open ↗
10/01/2026S00147487-I1Open ↗
09/28/2026S01400774-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
03/23/2020520370278Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026S00391391-I1Open ↗
08/26/2026S00388423-P2Open ↗
08/25/2026S00390764-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/17/2020540176441Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/17/2020540176441Open ↗
▸Trade Schedules & Equipment65
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
08/12/2019520354063Open ↗
06/13/2019520354063Open ↗
Showing 2 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
02/10/2023520335762Open ↗
02/22/2022520354063Open ↗
02/08/2022520354063Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS13
02/10/2023520335762Open ↗
02/08/2023520335762Open ↗
02/22/2022520354063Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
01/05/2021520356908Open ↗
06/23/2020520372882Open ↗
05/28/2020520369805Open ↗
Showing 3 of 12 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
08/31/2023520208819Open ↗
01/21/2020520208819Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
03/04/2020520354358Open ↗
12/11/2019520353153Open ↗
Showing 2 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
11/12/2020520373104Open ↗
09/14/2020520322160Open ↗
06/08/2020520370278Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/22/2021520354063Open ↗
07/09/2021520353162Open ↗
11/12/2020520373104Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
02/07/2023520335762Open ↗
06/14/2022540176441Open ↗
07/22/2021520354063Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/07/2023520335762Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/07/2023520335762Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00437357-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/22/2021520354063Open ↗
07/22/2021520354063Open ↗
07/09/2021520353162Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/24/2020540176441Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
07/03/2019520264516Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs76
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
03/03/2023540176441Open ↗
02/10/2023520262974Open ↗
02/09/2023520363838Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
12/02/2022520208819Open ↗
05/29/2020520208819Open ↗
01/21/2020520208819Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
02/07/2023520208819Open ↗
02/07/2023520208819Open ↗
01/27/2023520208819Open ↗
Showing 3 of 9 on file for this type
▸BISBSA/CPC APPROVAL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
02/07/2023520335762Open ↗
06/14/2022540176441Open ↗
▸BISLetter from Homeowner for Withdrawal2
09/26/2019520262974Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
06/14/2022540176441Open ↗
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT38
11/12/2020520373104Open ↗
09/14/2020520322160Open ↗
08/17/2020540176441Open ↗
Showing 3 of 38 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
02/10/2023520262974Open ↗
06/10/2022540176441Open ↗
03/02/2022520363838Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms132
▸BISBOROUGH INTAKE FORM44
11/20/2020540176441Open ↗
04/16/2020520374577Open ↗
04/15/2020520356908Open ↗
Showing 3 of 44 on file for this type
▸BISADDITIONAL INFORMATION44
02/08/2023520208819Open ↗
02/03/2023520363838Open ↗
11/24/2021540176441Open ↗
Showing 3 of 44 on file for this type
▸BISEFILING COVER SHEET43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/17/2020540176441Open ↗
▸Other Documents10
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation5
08/13/2026S00168132-I1Open ↗
08/13/2026S00147487-I1Open ↗
08/13/2026S00120068-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
08/17/2020540176441Open ↗
▸BISUnknown1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUPDATE C OF O TO CHANGE THE USE FROM COFFE TO INDOOR EATING AND DRINKING.1
02/21/2023540176441Open ↗