1930Year Built
2Stories
S2Building Class
M1-1Zoning
2,500 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · 4,538 sf lot · 0.55 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO 51 ARCHITECTURE, PLLC311/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B2 CODE CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW FIELD CONSTRUCTION INGeneral Contractor303/21/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010208/10/2021
Building Lifecycle
All (29)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)Objection (11)Special Inspection (7)
01/26/2022
Signed off — Alteration
INSTALLATION ON NEW HOT WATER HEATER, LAUNDRY SINK, NEW DRYER, NEW WASHER, AND REPLACEMENT OF EXISTING GAS PIPING IN CELLAR, FIRST FLOOR, AND SECOND FLOOR. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
Q00572717-I1
01/24/2022
Signed off — Alteration
C/O FOR THE BUILDING; CHANGE OF USE FOR EXISTING STORE FROM DELI TO GYMBOREE AND 2 HR-RATED PARTITION IN CELLAR FOR BOILER ROOM.
Q00449942-I1
11/05/2021
Objection raised — Other
11/03/2021
Filed — Alteration
Q00621321-I1
11/02/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2021
Permit issued — General Construction
Q00449942-I1-GC
09/07/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2021
Permit issued — Plumbing
Q00572717-I1-PL
08/10/2021
Filed — Alteration
INSTALLATION ON NEW HOT WATER HEATER, LAUNDRY SINK, NEW DRYER, NEW WASHER, AND REPLACEMENT OF EXISTING GAS PIPING IN CELLAR, FIRST FLOOR, AND SECOND FLOOR. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
Q00572717-I1
08/07/2021
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
08/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
08/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/12/2021
Objection raised — Other
04/12/2021
Objection resolved — Addressed
04/12/2021
Objection raised — Energy
04/12/2021
Objection resolved — Addressed
04/12/2021
Objection raised — Zoning
04/12/2021
Objection resolved — Addressed
04/12/2021
Objection raised — Other
04/12/2021
Objection resolved — Addressed
04/12/2021
Objection raised — Other
04/12/2021
Objection resolved — Addressed
03/25/2021
Filed — Alteration
C/O FOR THE BUILDING; CHANGE OF USE FOR EXISTING STORE FROM DELI TO GYMBOREE AND 2 HR-RATED PARTITION IN CELLAR FOR BOILER ROOM.
Q00449942-I1
03/12/2021
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
01/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/07/2021
Special inspection requirement — Final
XIUCHENG LI
01/07/2021
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
12/07/1989
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEW FIELD CONSTRUCTION IN10/28/2021
DOB NOWPlumbingSigned-offMATHEW WEISS08/25/2021
BIS—ISSUEDMETROTRANS CONSTRUCTION CORP10/07/1994
BISFBISSUEDGLOBE FUEL OIL CO12/20/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/07/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/07/2021Energy Code Compliance InspectionsXIUCHENG LIprogress
08/07/2021HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
08/07/2021Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
03/12/2021Fire-Resistance Rated ConstructionXIUCHENG LIprogress
01/07/2021Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
01/07/2021FinalXIUCHENG LIprogress
01/07/2021Lighting in dwelling unitsXIUCHENG LIenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/27/2026Q00572717-I1Request digital key ↗
08/27/2026Q00621321-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026Q00449942-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION8
02/22/2022421133749Open ↗
02/16/2022421133749Open ↗
02/14/2022421133749Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/12/2021421133749Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/12/2021421133749Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00449942-I1Open ↗
08/27/2026Q00449942-I1Open ↗
08/22/2026Q00572717-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00449942-I1Open ↗
08/13/2026Q00572717-I1Open ↗
08/13/2026Q00621321-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00449942-I1Open ↗
08/22/2026Q00572717-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/12/2021421133749Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00572717-I1Open ↗
08/13/2026Q00449942-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/12/2021421133749Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00572717-I1Open ↗
08/13/2026Q00449942-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/03/2022421133749Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/03/2022421133749Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE7
02/22/2022421133749Open ↗
02/16/2022421133749Open ↗
02/14/2022421133749Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/10/2022421133749Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
01/06/2023421133749Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
02/10/2022421133749Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
10/12/2021421133749Open ↗