← Back
BuildNYC
Miscellaneous hospital / health care facility
36-02 14TH STREET
QUEENS · BIN 4004284
💬 Discuss this project
1957Year Built
2Stories
I9Building Class
M1-1Zoning
11,200 sfGross Floor Area
0Units
0 Active Violations
Miscellaneous hospital / health care facility · 16,500 sf lot · 0.68 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAmerican Society for the Prevention of Cruelty to Animals (A97p · 7 filings · 20 docs
BulkheadAmerican Society for the Prevention of Cruelty to Animals (A1p · 1 filing · 20 docs
Floor 2American Society for the Prevention of Cruelty to Animals (A115p · 7 filings · 20 docs
Floor 1American Society for the Prevention of Cruelty to Animals (A119p · 8 filings · 20 docs
CellarAmerican Society for the Prevention of Cruelty to Animals (A133p · 9 filings · 20 docs
Site & exteriorAmerican Society for the Prevention of Cruelty to Animals (A1p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aspca3707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2022$6.0M—— → —$531/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Environetics Design301/25/2024
Env Architects512/27/2023
Cameron Engineering912/21/2023
Leon Skvirsky PE212/12/2023
Pillori Associates102/09/2023
Ancora Engineering110/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants3603/21/2026
Building Brothers403/21/2026
Perciballi Industries203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Newgrange Construction CoGeneral Contractor1407/08/2026
Avalon ElectricElectrical203/22/2026
Perciballi IndustriesScaffold203/21/2026
Active SignsSign hanger207/08/2026
Dell MechanicalPlumbing107/08/2026
Accurate MechanicalPlumbing107/08/2026
Perciballi IndustriesGeneral Contractor107/08/2026
Accurate MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joadem43501801/25/2024
Pillori Associates2317102/09/2023
Building Lifecycle
All (153)Filed (21)Permit Issued (13)Signed Off (12)Violation (13)Inspection (12)Objection (52)Special Inspection (30)
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2024
Signed off — Alteration
installation of a new 3 combined fire/domestic (take-off) water service with new RPZ and DCDA. New plumbing equipment and fixtures with all required waste, vent and water connections, fitting, valves, faucets and etc., as shown on plans.
Q00795640-I1
03/28/2024
Signed off — Alteration
Construction of non-load bearing partitions, creation of an elevator shaft (elevator device filed separately), modification of windows, doors, and existing storefront as per plans. No change to occupancy, egress, or use.
Q08007646-I1
03/22/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (ASPCA)
Q00951927-I1
03/22/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (ASPCA Community Veterinary Clinic by Rachael Ray Nutrish)
Q00951918-I1
03/13/2024
Signed off — Alteration
New elevator opening through existing concrete floor slab. Support of new rooftop units. (500 lineal feet of steel).
Q08030956-I1
03/07/2024
Signed off — Alteration
Mechanical/HVAC renovation to existing commercial space.
Q00795672-I1
03/07/2024
Signed off — Alteration
Installation of a new gas-fired optional standby generator on the roof.
Q00872069-I1
03/01/2024
Special inspection requirement — Post-installed Anchors
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Final
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Subgrade Inspections
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Masonry
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Concrete - Cast-In-Place
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Structural Steel - Welding
OLULADE ADEMOKUN
03/01/2024
Special inspection requirement — Structural Steel - Details
OLULADE ADEMOKUN
02/21/2024
Objection resolved — Addressed
02/12/2024
Objection raised — Accessibility
01/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/25/2024
Filed — Alteration
New elevator opening through existing concrete floor slab. Support of new rooftop units. (500 lineal feet of steel).
Q08030956-P2
01/19/2024
Signed off — Alteration
medical gas lines installation
Q00843892-I1
01/11/2024
Permit issued — Sign
Q00951927-I1-SG
01/10/2024
Permit issued — Sign
Q00951918-I1-SG
01/09/2024
Signed off — Alteration
New sprinkler System throughout the building as per NFPA13-2007 Modified by 2014 BC NYC Appendix Q.
Q00795613-I1
01/05/2024
Special inspection requirement — Masonry
OLULADE ADEMOKUN
01/05/2024
Special inspection requirement — Insulation placement and R values
OLULADE ADEMOKUN
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
OLULADE ADEMOKUN
01/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
OLULADE ADEMOKUN
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
01/04/2024
Special inspection requirement — Post-installed Anchors
OLULADE ADEMOKUN
12/27/2023
Filed — Alteration CO
Change of use to establish new animal hospital (change of UG 4 to UG 16) within existing commercial structure. Installation of new elevator bulkhead. All interior work filed separately.
Q00790007-P1
12/21/2023
Filed — Alteration
installation of a new 3 combined fire/domestic (take-off) water service with new RPZ and DCDA. New plumbing equipment and fixtures with all required waste, vent and water connections, fitting, valves, faucets and etc., as shown on plans.
Q00795640-P2
12/21/2023
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
12/21/2023
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
12/18/2023
Special inspection requirement — Masonry
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Insulation placement and R values
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Final
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Energy Code Compliance Inspections
OLULADE ADEMOKUN
12/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
OLULADE ADEMOKUN
12/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
12/13/2023
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
12/13/2023
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
12/12/2023
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (ASPCA)
Q00951927-I1
12/12/2023
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (ASPCA Community Veterinary Clinic by Rachael Ray Nutrish)
Q00951918-I1
12/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
OLULADE ADEMOKUN
12/11/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
OLULADE ADEMOKUN
12/11/2023
Special inspection requirement — Masonry
OLULADE ADEMOKUN
12/11/2023
Special inspection requirement — Insulation placement and R values
OLULADE ADEMOKUN
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
12/07/2023
Special inspection requirement — Post-installed Anchors
OLULADE ADEMOKUN
12/07/2023
Special inspection requirement — Sprinkler Systems
OLULADE ADEMOKUN
12/04/2023
Filed — Alteration
Construction of non-load bearing partitions, creation of an elevator shaft (elevator device filed separately), modification of windows, doors, and existing storefront as per plans. No change to occupancy, egress, or use.
Q08007646-P2
12/01/2023
Filed — Alteration
New elevator opening through existing concrete floor slab. Support of new rooftop units. (500 lineal feet of steel).
Q08030956-P1
11/28/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
OLULADE ADEMOKUN
11/22/2023
Filed — Alteration
installation of a new 3 combined fire/domestic (take-off) water service with new RPZ and DCDA. New plumbing equipment and fixtures with all required waste, vent and water connections, fitting, valves, faucets and etc., as shown on plans.
Q00795640-P1
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offActive Signs01/11/2024
DOB NOWSignSigned-offActive Signs01/10/2024
DOB NOWMechanical SystemsSigned-offNewgrange Construction Co10/03/2023
DOB NOWPlumbingSigned-offDell Mechanical05/25/2023
DOB NOWSupport of ExcavationSigned-offNewgrange Construction Co04/06/2023
DOB NOWGeneral ConstructionSigned-offNewgrange Construction Co04/05/2023
DOB NOWStructuralSigned-offNewgrange Construction Co03/29/2023
DOB NOWPlumbingSigned-offAnthony Disabato03/21/2023
DOB NOWGeneral ConstructionPermit IssuedNewgrange Construction Co03/14/2023
DOB NOWMechanical SystemsSigned-offNewgrange Construction Co02/28/2023
DOB NOWSprinklersSigned-offAccurate Mechanical02/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offPerciballi Industries11/04/2022
DOB NOWGeneral ConstructionSigned-offPerciballi Industries10/27/2022
BISPLISSUEDThe Plumbing Company06/30/2010
BIS—ISSUEDElbo Construction06/28/2010
BISPLISSUEDStuart Wachtel & Son07/29/2003
BIS—ISSUEDAta Construction07/10/2003
BISBLISSUEDA & C Heating Services06/24/1999
BISPLISSUEDA & C Heating Services06/24/1999
2 projects · most recent 05/06/2024
General Wiring
FiledStatusContractorScope
05/06/2024CompleteAvalon ElectricGeneral Wiring
08/25/2023CompleteR.C.M. Electric—
1 project · most recent 12/27/2023
FiledStatusContractorScope
12/27/2023Permit IssuedNewgrange Construction Co1 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/21/2023Certified Medical Gas - MG - PL - FinishCertifiedView ↗
12/21/2023Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2023Certified Medical Gas - MG - PL - FinishCertifiedView ↗
12/13/2023Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
12/13/2023Certified Medical Gas - MG - PL - TestCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
03/01/2024Post-installed AnchorsOLULADE ADEMOKUNspecial
03/01/2024FinalOLULADE ADEMOKUNprogress
03/01/2024Subgrade InspectionsOLULADE ADEMOKUNspecial
03/01/2024MasonryOLULADE ADEMOKUNspecial
03/01/2024Structural Stability – Alterations of existing buildingsOLULADE ADEMOKUNspecial
03/01/2024Concrete - Cast-In-PlaceOLULADE ADEMOKUNspecial
03/01/2024Structural Steel - WeldingOLULADE ADEMOKUNspecial
03/01/2024Structural Steel - DetailsOLULADE ADEMOKUNspecial
01/05/2024MasonryOLULADE ADEMOKUNspecial
01/05/2024Insulation placement and R valuesOLULADE ADEMOKUNenergy_progress
01/05/2024Energy Code Compliance InspectionsOLULADE ADEMOKUNprogress
01/05/2024Exterior Insulation and Finish Systems (EIFS)OLULADE ADEMOKUNspecial
01/04/2024Fire-Resistant Penetrations and JointsOLULADE ADEMOKUNspecial
01/04/2024Post-installed AnchorsOLULADE ADEMOKUNspecial
12/18/2023MasonryOLULADE ADEMOKUNspecial
12/18/2023Fire-Resistant Penetrations and JointsOLULADE ADEMOKUNspecial
12/18/2023Wall Panels, Curtain Walls, and VeneersOLULADE ADEMOKUNspecial
12/18/2023Fenestration and door U-factor and product ratingsOLULADE ADEMOKUNenergy_progress
12/18/2023Insulation placement and R valuesOLULADE ADEMOKUNenergy_progress
12/18/2023FinalOLULADE ADEMOKUNprogress
12/18/2023Energy Code Compliance InspectionsOLULADE ADEMOKUNprogress
12/18/2023Fire-Resistance Rated ConstructionOLULADE ADEMOKUNprogress
12/11/2023Energy Code Compliance InspectionsOLULADE ADEMOKUNprogress
12/11/2023Exterior Insulation and Finish Systems (EIFS)OLULADE ADEMOKUNspecial
12/11/2023MasonryOLULADE ADEMOKUNspecial
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
American Society for the Prevention of Cruelty to Animals (ASPCA)Community FacilityCellar, Floors 1, 2, Roof
Project Q00951918 Alteration · LOC Issued · 12/12/2023
Project Q00951927 Alteration · LOC Issued · 12/12/2023
Project Q00843892 Alteration · LOC Issued · 03/28/2023
Project Q08030956 Alteration · LOC Issued · 11/18/2022
Project Q00795613 Alteration · LOC Issued · 10/27/2022
Project Q00795640 Alteration · LOC Issued · 10/27/2022
Project Q00795672 Alteration · LOC Issued · 10/27/2022
Project Q08007646 Alteration · LOC Issued · 10/26/2022
Project Q08024424 Alteration · LOC Issued · 10/26/2022
Project Q00757257 Alteration · LOC Issued · 08/26/2022
Project Q00872069 Alteration · LOC Issued · 05/18/2023
Project Q00790007 Alteration CO · CO Issued · 08/12/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/25/2026Q08024424-I1Request digital key ↗
08/25/2026Q08007646-P2Request digital key ↗
08/25/2026Q00795672-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00790007-I1Open ↗
▸Seals & Professional Certifications79
▸DOB NOWSpecial Inspector Seal & Signature30
10/19/2026Q08007646-I1Open ↗
10/19/2026Q08007646-I1Open ↗
10/19/2026Q08007646-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/19/2026Q08007646-I1Open ↗
10/19/2026Q08007646-I1Open ↗
10/19/2026Q08007646-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/25/2026Q00795672-P1Open ↗
08/25/2026Q00795672-I1Open ↗
08/25/2026Q00795613-I1Open ↗
Showing 3 of 21 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/23/2026Q00790007-P1Open ↗
08/14/2026Q00790007-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/25/2026Q00795672-I1Open ↗
08/25/2026Q00821317-I1Open ↗
08/25/2026Q00843892-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00951927-I1Open ↗
08/13/2026Q00951918-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00790007-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/25/2026Q00795672-P1Open ↗
08/25/2026Q00795672-I1Open ↗
08/25/2026Q00795613-I1Open ↗
Showing 3 of 18 on file for this type
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q08007646-P2Open ↗
08/13/2026Q08007646-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00790007-P1Open ↗
08/14/2026Q00790007-I1Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026Q00821317-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00821317-I1Open ↗