← Back
BuildNYC
Two family brick
36-05 28TH AVENUE
QUEENS · BIN 4010133
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6AZoning
1,890 sfGross Floor Area
2Units
2 Active Violations ▸FDNY Report ↗
Two family brick · 1,040 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofStructural framing for 3rd floor extension and roof3p · 1 filing · 16 docs
Floor 3Structural framing for 3rd floor extension and roof10p · 2 filings · 20 docs
Floor 2Alteration of existing residential building20p · 4 filings · 20 docs
Floor 1Alteration of existing residential building21p · 4 filings · 20 docs
CellarAlteration of existing residential building20p · 4 filings · 20 docs
Site & exteriorProposed Heavy Duty Sidewalk Shed14p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/07/2017$564K—Private party → —$299/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P Georgopoulos Architect904/16/2025
Ashraf102/15/2024
Sotir Associates307/08/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alpha Tech RenovationsGeneral Contractor1203/21/2026
KMN BuildersGeneral Contractor603/21/2026
Tri-State RenovationsGeneral Contractor307/08/2026
Ariana ContractingPlumbing207/08/2026
MNK Enterprises NYScaffold107/08/2026
Doug's Plumbing & Heating Service CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P Georgopoulos Architect889512/03/2024
MJ Engineering & Design5546112/12/2022
Building Lifecycle
All (115)Filed (13)Permit Issued (12)Signed Off (2)Violation (2)Inspection (3)Objection (53)Special Inspection (30)
01/21/2026
Signed off — Alteration
FILING PLUMBING WORK UNDER ALTERATION #Q00466392. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
Q00600769-I1
04/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/16/2025
Filed — Alteration
FILING PLUMBING WORK UNDER ALTERATION #Q00466392. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
Q00600769-P5
02/12/2025
Permit issued — Plumbing
Q00600769-I1-PL
12/04/2024
Permit issued — General Construction
Q00466392-I1-GC
12/03/2024
Filed — Alteration
INTERIOR RENOVATIONS IN EXISTING 2-FAMILY BUILDING, REPLACE WINDOWS, AND NEW FACADE . PLUMBING AND STRUCTURAL WORK TO BE FILED SEPARATELY. WITHDRAW ALTERATION CO Q00605122-I1 SINCE ADDITION IS NO LONGER PROPOSED. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q00466392-P1
12/02/2024
Special inspection requirement — Fenestration air leakage
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Permanent certificate
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Maintenance information
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Insulation placement and R values
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Lighting controls
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Fenestration areas
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Exterior lighting power
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/02/2024
Special inspection requirement — Air barrier - visual inspection
Vasilios Georgopoulos
12/02/2024
Special inspection requirement — Interior lighting power
Vasilios Georgopoulos
11/15/2024
Signed off — Alteration
Q01005602-I1
10/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2024
Filed — Alteration
FILING PLUMBING WORK UNDER ALTERATION #Q00466392. NO CHANGE TO USE, EGRESS AND OCCUPANCY.
Q00600769-P4
10/21/2024
Special inspection requirement — Lighting in dwelling units
Vasilios Georgopoulos
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vasilios Georgopoulos
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Vasilios Georgopoulos
09/09/2024
Objection resolved — Resolved
08/25/2024
Objection resolved — Resolved
08/25/2024
Objection resolved — Resolved
08/25/2024
Objection resolved — Resolved
08/25/2024
Objection resolved — Resolved
07/11/2024
Objection raised — Zoning
07/11/2024
Objection raised — Other
07/11/2024
Objection raised — Scope
06/29/2024
Objection resolved — Addressed
06/29/2024
Objection resolved — Addressed
05/29/2024
Special inspection requirement — Final
Vasilios Georgopoulos
05/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vasilios Georgopoulos
05/29/2024
Special inspection requirement — Concrete - Cast-In-Place
Vasilios Georgopoulos
05/29/2024
Special inspection requirement — Structural Cold-Formed Steel
Vasilios Georgopoulos
05/29/2024
Special inspection requirement — Subgrade Inspections
Vasilios Georgopoulos
05/24/2024
Filed — Alteration
STRUCTURAL FRAMING FOR THE 3RD FLOOR EXTENSION AND ROOF. LEGALIZATION OF SLAB REPLACEMENT AT CELLAR, AND SISTERING OF WOOD JOISTS. IN CONJUNCTION WITH GC APPLICATION #Q00605122.
Q00669334-P1
05/22/2024
Permit issued — Structural
Q00669334-I1-ST
02/16/2024
Permit issued — Sidewalk Shed
Q01005602-I1-SH
02/15/2024
Filed — Alteration
Q01005602-I1
02/14/2024
Permit issued — General Construction
Q00605122-I1-GC
12/26/2023
Permit issued — Plumbing
Q00600769-I1-PL
12/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/30/2023
Permit issued — General Construction
Q00466392-I1-GC
05/03/2023
Objection resolved — Resolved
04/11/2023
Objection raised — Zoning
04/03/2023
Objection resolved — Addressed
04/03/2023
Objection resolved — Addressed
03/15/2023
Objection raised — Zoning
03/15/2023
Objection raised — Other
03/15/2023
Objection raised — Zoning
03/09/2023
Objection resolved — Addressed
12/22/2022
Objection raised — Zoning
12/22/2022
Objection raised — Fire_Protection
12/22/2022
Objection raised — Other
12/22/2022
Objection raised — Fire_Protection
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAriana Contracting02/12/2025
DOB NOWGeneral ConstructionSigned-offAlpha Tech Renovations12/04/2024
DOB NOWStructuralPermit IssuedAlpha Tech Renovations05/22/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY02/16/2024
DOB NOWGeneral ConstructionPermit IssuedAlpha Tech Renovations02/14/2024
DOB NOWPlumbingSigned-offAriana Contracting12/26/2023
DOB NOWGeneral ConstructionSigned-offAlpha Tech Renovations11/30/2023
DOB NOWGeneral ConstructionPermit IssuedKMN Builders02/15/2022
DOB NOWStructuralPermit IssuedKMN Builders02/01/2022
DOB NOWPlumbingSigned-offDoug's Plumbing & Heating Service Co12/02/2021
DOB NOWGeneral ConstructionSigned-offTri-State Renovations10/12/2021
DOB NOWGeneral ConstructionSigned-offTri-State Renovations09/21/2021
2 projects · most recent 02/15/2024
General Wiring
FiledStatusContractorScope
02/15/2024Permit IssuedRichard Neu—
12/26/2023Permit IssuedElmac ElectricGeneral Wiring
1 project · most recent 05/24/2024
Steel Concrete Wood
FiledStatusContractorScope
05/24/2024Permit IssuedAlpha Tech RenovationsSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
12/02/2024Fenestration air leakageVasilios Georgopoulosenergy_progress
12/02/2024Permanent certificateVasilios Georgopoulosenergy_progress
12/02/2024Maintenance informationVasilios Georgopoulosenergy_progress
12/02/2024Insulation placement and R valuesVasilios Georgopoulosenergy_progress
12/02/2024Lighting controlsVasilios Georgopoulosenergy_progress
12/02/2024Fenestration and door U-factor and product ratingsVasilios Georgopoulosenergy_progress
12/02/2024Fenestration areasVasilios Georgopoulosenergy_progress
12/02/2024Exterior lighting powerVasilios Georgopoulosenergy_progress
12/02/2024Fire-Resistance Rated Construction—progress
12/02/2024Air barrier - visual inspectionVasilios Georgopoulosenergy_progress
12/02/2024Interior lighting powerVasilios Georgopoulosenergy_progress
10/21/2024Lighting in dwelling unitsVasilios Georgopoulosenergy_progress
10/21/2024Fire-Resistant Penetrations and JointsVasilios Georgopoulosspecial
10/21/2024Energy Code Compliance InspectionsVasilios Georgopoulosprogress
05/29/2024FinalVasilios Georgopoulosprogress
05/29/2024Structural Stability – Alterations of existing buildingsVasilios Georgopoulosspecial
05/29/2024Concrete - Cast-In-PlaceVasilios Georgopoulosspecial
05/29/2024Structural Cold-Formed SteelVasilios Georgopoulosspecial
05/29/2024Subgrade InspectionsVasilios Georgopoulosspecial
07/07/2022Energy Code Compliance InspectionsHany Demetryprogress
02/04/2022Energy Code Compliance InspectionsHany Demetryprogress
11/10/2021Insulation placement and R valuesVasilios Georgopoulosenergy_progress
11/10/2021Fenestration areasVasilios Georgopoulosenergy_progress
11/10/2021Fenestration and door U-factor and product ratingsVasilios Georgopoulosenergy_progress
11/10/2021Fenestration air leakageVasilios Georgopoulosenergy_progress
Latest 25 of 30.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/26/2026Q00600769-I1Request digital key ↗
08/26/2026Q00600769-P1Request digital key ↗
08/26/2026Q00600769-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00466392-I1Request digital key ↗
08/27/2026Q00466392-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWRestrictive Declaration/Easement 110
08/13/2026Q00600769-P3Open ↗
08/13/2026Q00600769-P5Open ↗
08/13/2026Q00466392-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00605122-P1Open ↗
08/13/2026Q00605122-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00605122-P1Open ↗
08/13/2026Q00605122-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00605122-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00466392-P1Open ↗
08/27/2026Q00466392-I1Open ↗
08/26/2026Q00600769-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q00669334-P2Open ↗
09/01/2026Q00605122-I1Open ↗
09/01/2026Q00605122-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00669334-P2Open ↗
09/02/2026Q00669334-P2Open ↗
09/02/2026Q00669334-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00605122-I1Open ↗
08/13/2026Q00605122-P1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026Q00466392-P1Open ↗
08/27/2026Q00466392-I1Open ↗
08/26/2026Q00600769-P5Open ↗
Showing 3 of 13 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00605122-P1Open ↗
08/13/2026Q00605122-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00605122-I1Open ↗
08/13/2026Q00605122-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/25/2026Q00605122-P1Open ↗
08/15/2026Q00605122-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00605122-P1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00605122-I1Open ↗