← Back
Two family brick
36-19 21 AVENUE
QUEENS · Astoria (North)-Ditmars-Steinway · BIN 4016673
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
2,160 sfGross Floor Area
2Units
Two family brick · 2,500 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 5 docs
Floor 22p · 1 filing · 5 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EK ENGINEERING, P.C.307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.108/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GO PRO RESTORATION & MAINGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781108/28/2023
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (4)
03/28/2024
Signed off — Alteration
INTERIOR RENOVATION OF KITCHEN & RELOCATION OF BEDROOM ONLY. NO CHANGE IN USE GROUP, OCCUPANCY, EGRESS OR BULK UNDER THIS APPLICATION.
Q00923758-I1
03/27/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/29/2023
Permit issued — General Construction
Q00923758-I1-GC
08/28/2023
Filed — Alteration
INTERIOR RENOVATION OF KITCHEN & RELOCATION OF BEDROOM ONLY. NO CHANGE IN USE GROUP, OCCUPANCY, EGRESS OR BULK UNDER THIS APPLICATION.
Q00923758-I1
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGO PRO RESTORATION & MAIN08/29/2023
1 project · most recent 01/18/2024
General Wiring
FiledStatusContractorScope
01/18/2024CompleteTOWER ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/25/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/25/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/25/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/25/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00923758-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00923758-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026Q00923758-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00923758-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00923758-I1Open ↗