← Back
Elevator apt, semi-fireproof with stores
36-22 31 STREET
QUEENS · BIN 4625161
💬 Discuss this project
2022Year Built
5Stories
D7Building Class
M1-2/R6AZoning
9,244 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: SOCRATES SERVICES INTERNATIONAL, LLC · 2,250 sf lot · 4.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction70p · 1 filing · 20 docs
Floor 5Under Construction64p · 1 filing · 20 docs
Floor 4Under Construction65p · 1 filing · 20 docs
Floor 3Under Construction59p · 1 filing · 20 docs
Floor 2Under Construction59p · 1 filing · 20 docs
Floor 1Under Construction62p · 1 filing · 20 docs
CellarUnder Construction66p · 1 filing · 20 docs
BasementUnder Construction66p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES404/09/2026
PLATINUM SERVICES NY1204/09/2026
SANO DEMOLITION CORP.503/22/2026
TRIERA CONTRACTING INC503/22/2026
SOCRATES SERVICES INTERNATIONAL803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/22/2018$1.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANGELO NG & ANTHONY NG ARCHITECTS S1605/11/2026
HRM ENGINEERING SERVICES, PC902/15/2024
ASHRAF CORP212/06/2023
ENTHINK ENGINEERS LLC112/23/2022
H & O ENGINEERING, DPC107/19/2021
GREEN DESIGN103/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PLATINUM SERVICES NY403/21/2026
ANGELO NG + ANTHONY NG ARCHITECTS3903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ODYSSIA GLOBAL COMM. CORPGeneral Contractor1507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1004/09/2026
SANO DEMOLITION CORPGeneral Contractor303/21/2026
TRIERA CONTRACTING INCGeneral Contractor303/21/2026
AURA PLUMBING INCPlumbing307/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/09/2026
AIR ZONE HVAC INCGeneral Contractor107/08/2026
AURA PLUMBING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI10082205/11/2026
Building Lifecycle
All (174)Filed (30)Permit Issued (27)Signed Off (12)Violation (12)Inspection (8)Objection (55)Special Inspection (30)
06/01/2026
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-I1
05/14/2026
Special inspection requirement — Air barrier — testing
GLEN LANGER
05/14/2026
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
05/14/2026
Special inspection requirement — Fenestration air leakage
GLEN LANGER
05/14/2026
Special inspection requirement — Electrical motors and elevators
GLEN LANGER
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
05/14/2026
Special inspection requirement — Lighting controls
GLEN LANGER
05/14/2026
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
05/14/2026
Special inspection requirement — Metering
GLEN LANGER
05/14/2026
Special inspection requirement — Insulation placement and R values
GLEN LANGER
05/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GLEN LANGER
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
05/14/2026
Special inspection requirement — Masonry
GLEN LANGER
05/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
05/14/2026
Special inspection requirement — Exterior lighting power
GLEN LANGER
05/14/2026
Special inspection requirement — Fenestration areas
GLEN LANGER
05/14/2026
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
05/14/2026
Special inspection requirement — Vestibules
GLEN LANGER
05/14/2026
Special inspection requirement — Maintenance information
GLEN LANGER
05/14/2026
Special inspection requirement — Interior lighting power
GLEN LANGER
05/14/2026
Special inspection requirement — Lighting in dwelling units
GLEN LANGER
05/11/2026
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-B4
05/11/2026
Violation issued (HPD, open)
A
05/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GLEN LANGER
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
05/11/2026
Special inspection requirement — Masonry
GLEN LANGER
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
05/11/2026
Special inspection requirement — Air barrier — testing
GLEN LANGER
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/13/2026
Permit issued — General Construction
Q00627251-I1-GC
12/05/2025
Objection resolved — Addressed
12/04/2025
Objection raised — Energy
12/02/2025
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-B3
11/14/2025
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-B2
09/03/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Scope
07/14/2025
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-B1
02/20/2025
Objection resolved — Addressed
02/13/2025
Objection raised — Energy
02/04/2025
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-A9
10/31/2024
Filed — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-A8
10/23/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S3
10/23/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S4
10/22/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S8
09/30/2024
Signed off — Alteration
Q00479422-I1
09/26/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S9
09/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/21/2024
Signed off — Alteration
Q00803320-I1
08/12/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S6
08/12/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S2
07/12/2024
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08054291-I1
06/19/2024
Signed off — New Building
SUPPORT OF EXCAVATION ASSOCIATED WITH NB Q00627251-I1
Q00627251-S5
05/07/2024
Permit issued — Mechanical Systems
Q00627251-S3-MS
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedODYSSIA GLOBAL COMM. CORP03/13/2026
DOB NOWMechanical SystemsSigned-offODYSSIA GLOBAL COMM. CORP05/07/2024
DOB NOWConstruction FenceSigned-offODYSSIA GLOBAL COMM. CORP05/01/2024
DOB NOWPlumbingSigned-offAURA PLUMBING INC05/01/2024
DOB NOWGeneral ConstructionPermit IssuedODYSSIA GLOBAL COMM. CORP02/12/2024
DOB NOWEarth WorkSigned-offODYSSIA GLOBAL COMM. CORP01/24/2024
DOB NOWSupport of ExcavationSigned-offODYSSIA GLOBAL COMM. CORP01/24/2024
DOB NOWStructuralSigned-offODYSSIA GLOBAL COMM. CORP01/24/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/06/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/04/2023
DOB NOWSprinklersSigned-offAURA PLUMBING INC11/13/2023
DOB NOWMechanical SystemsSigned-offAIR ZONE HVAC INC05/01/2023
DOB NOWGeneral ConstructionPermit IssuedODYSSIA GLOBAL COMM. CORP02/17/2023
DOB NOWConstruction FenceSigned-offODYSSIA GLOBAL COMM. CORP01/27/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC12/29/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC12/29/2022
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/23/2022
DOB NOWStructuralSigned-offODYSSIA GLOBAL COMM. CORP12/21/2022
DOB NOWSupport of ExcavationSigned-offODYSSIA GLOBAL COMM. CORP12/21/2022
DOB NOWMechanical SystemsSigned-offODYSSIA GLOBAL COMM. CORP12/21/2022
DOB NOWSprinklersSigned-offAURA PLUMBING INC12/09/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC12/09/2022
DOB NOWFoundationSigned-offODYSSIA GLOBAL COMM. CORP06/07/2022
DOB NOWConstruction FenceSigned-offODYSSIA GLOBAL COMM. CORP02/02/2022
DOB NOWConstruction FenceSigned-offODYSSIA GLOBAL COMM. CORP01/11/2022
DOB NOWConstruction FenceSigned-offSANO DEMOLITION CORP07/20/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC03/08/2021
BIS—ISSUEDSANO DEMOLITION CORP08/05/2021
1 project · most recent 05/11/2026
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Permit IssuedODYSSIA GLOBAL COMM. CORPAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Daikin RXTQ36TBVJUA 34,200 BTU · Vrf Outdoor ×6
RXSQ24TBVJUA 24,000 BTU · Vrf Outdoor ×5
RK24AXVJU 24,000 BTU · Heat Pump Outdoor ×1
RXSQ24BAVJUA 24,000 BTU · Vrf Outdoor ×1
RXSQ24BVJUA, RXSQ24BVJUA 45,500 BTU · Vrf Outdoor ×1
RXSQ24TBJUA 24,000 BTU · Vrf Outdoor ×1
RXYQ72XATJA 72,000 BTU · Vrf Outdoor ×1
RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×13
RXTQ36TAVJU 34,200 BTU · Vrf Outdoor ×12
RXTQ48TAVJU 45,500 BTU · Vrf Outdoor ×2
RXYQ72TATJU 72,000 BTU · Vrf Outdoor ×2
Ventilation
Fantech FG 4XL EC 50 CFM · Exhaust Fan ×21
FG 6M EC 115 CFM · Exhaust Fan ×6
Greenheck CSP-B110 70 CFM · Exhaust Fan ×9
G-097-VG 150 CFM · Exhaust Fan ×6
USF-06-B3 350 CFM · Exhaust Fan ×6
Ducts & Piping
Greenheck CUE-100HP-VG 300 CFM · Kitchen Exhaust ×3
1 project · most recent 05/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/11/2026Signed-offAURA PLUMBING INCStorm, Water/Sanitary
4 projects · most recent 08/13/2024
General Wiring
FiledStatusContractorScope
08/13/2024CompleteTRIZA ELECTRICAL CORPGeneral Wiring
02/24/2023CompleteKJK ELECTRIC INC—
12/13/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
03/02/2021CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 05/11/2026
FiledStatusContractorScope
05/11/2026Permit IssuedODYSSIA GLOBAL COMM. CORP2 scope_items
1 project · most recent 05/11/2026
Earthwork
FiledStatusContractorScope
05/11/2026Permit IssuedODYSSIA GLOBAL COMM. CORPEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/14/2026Fire-Resistant Penetrations and JointsGLEN LANGERspecial
05/14/2026Air barrier — testing GLEN LANGERenergy_progress
05/14/2026Electrical motors and elevatorsGLEN LANGERenergy_progress
05/14/2026Insulation placement and R valuesGLEN LANGERenergy_progress
05/14/2026Lighting in dwelling unitsGLEN LANGERenergy_progress
05/14/2026Interior lighting powerGLEN LANGERenergy_progress
05/14/2026MeteringGLEN LANGERenergy_progress
05/14/2026Maintenance informationGLEN LANGERenergy_progress
05/14/2026VestibulesGLEN LANGERenergy_progress
05/14/2026Fenestration air leakageGLEN LANGERenergy_progress
05/14/2026Concrete - Cast-In-PlaceGLEN LANGERspecial
05/14/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/14/2026MasonryGLEN LANGERspecial
05/14/2026Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
05/14/2026Exterior lighting powerGLEN LANGERenergy_progress
05/14/2026Lighting controlsGLEN LANGERenergy_progress
05/14/2026Protection of exposed foundation insulationGLEN LANGERenergy_progress
05/14/2026Fenestration areasGLEN LANGERenergy_progress
05/14/2026Air barrier - visual inspectionGLEN LANGERenergy_progress
05/14/2026Energy Code Compliance InspectionsGLEN LANGERprogress
05/14/2026Fire-Resistance Rated ConstructionGLEN LANGERprogress
05/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGLEN LANGERspecial
05/11/2026Energy Code Compliance InspectionsGLEN LANGERprogress
05/11/2026Electrical motors and elevatorsGLEN LANGERenergy_progress
05/11/2026Air barrier — testing GLEN LANGERenergy_progress
Latest 25 of 150.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
08/27/2026Q00479422-I1Request digital key ↗
08/27/2026Q00553718-I1Request digital key ↗
08/25/2026Q00803320-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
12/26/2025421690986Open ↗
11/08/2024421690986Open ↗
09/23/2024421918535Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
09/27/2024440709459Open ↗
▸BISWORK PERMIT APPLICATION1
09/07/2021421786124Open ↗
▸Zoning, Tax Lot & Property Records21
▸DOB NOWZD1: DOB Zoning Diagram10
08/16/2026Q00627251-B4Open ↗
08/13/2026Q00627251-P4Open ↗
08/13/2026Q00627251-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/16/2026Q00627251-B4Open ↗
08/13/2026Q00627251-P4Open ↗
08/13/2026Q00627251-A8Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications117
▸DOB NOWProgress Inspector Seal & Signature53
09/17/2026Q00627251-P7Open ↗
09/17/2026Q00627251-P7Open ↗
09/17/2026Q00627251-P7Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/23/2026Q00627251-S5Open ↗
09/23/2026Q00627251-S5Open ↗
09/17/2026Q00627251-P7Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/27/2026Q00479422-I1Open ↗
08/27/2026Q00553718-I1Open ↗
08/23/2026Q08054291-P1Open ↗
Showing 3 of 30 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/31/2022440709459Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/31/2022440709459Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/17/2019421918535Open ↗
▸Trade Schedules & Equipment12
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISGAS CUT-OFF1
09/07/2021421786124Open ↗
▸BISSEWER CUT-OFF1
09/07/2021421786124Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/17/2019421918535Open ↗
▸Safety & Tenant Protection19
▸DOB NOWStreet Tree Checklist10
08/16/2026Q00627251-B4Open ↗
08/13/2026Q00627251-B3Open ↗
08/13/2026Q00627251-P3Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREES SITE PLAN1
09/26/2024440709459Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/07/2021421786124Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/07/2021421786124Open ↗
▸BISSTREET TREE CHECKLIST1
03/31/2022440709459Open ↗
▸BISSTREET TREE SIGNOFF1
09/26/2024440709459Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/07/2021421786124Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00627251-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00627251-I1Open ↗
▸Environmental & Asbestos38
▸DOB NOWOER: Notice to Proceed24
08/16/2026Q00627251-B4Open ↗
08/14/2026Q00627251-I1Open ↗
Showing 2 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/14/2026Q00627251-I1Open ↗
Showing 1 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
09/27/2024440709459Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/07/2021421786124Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/17/2019421918535Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT12
08/16/2026Q00627251-B4Open ↗
08/13/2026Q00627251-A9Open ↗
08/13/2026Q00627251-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/13/2026Q00627251-I1Open ↗
08/13/2026Q00627251-S8Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00627251-S8Open ↗
08/13/2026Q00627251-I1Open ↗
▸BISBPP: FIELD INSPECTION1
09/27/2024440709459Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/07/2021421786124Open ↗
09/07/2021421786124Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/27/2024440709459Open ↗
03/31/2022440709459Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
09/07/2021421786124Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
07/31/2019421918535Open ↗
▸BISLANDMARKS APPROVAL1
09/07/2021421786124Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
09/26/2024440709459Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/07/2021421786124Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
09/27/2024440709459Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM3
12/26/2025421690986Open ↗
09/07/2021421786124Open ↗
07/22/2021421786124Open ↗
▸BISEFILING COVER SHEET3
07/22/2021421786124Open ↗
06/17/2019421918535Open ↗
01/03/2019421690986Open ↗
▸BISADDITIONAL INFORMATION1
09/27/2024440709459Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/31/2022440709459Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/31/2022440709459Open ↗
▸Other Documents41
▸DOB NOWProperty Ownership Certification12
08/16/2026Q00627251-B2Open ↗
08/16/2026Q00627251-B4Open ↗
08/16/2026Q00627251-A8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSite Survey: Initial10
08/16/2026Q00627251-B4Open ↗
08/13/2026Q00627251-P4Open ↗
08/13/2026Q00627251-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
08/16/2026Q00627251-B4Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00627251-S2Open ↗
08/13/2026Q00627251-S8Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
09/27/2024440709459Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/27/2024440709459Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
09/27/2024440709459Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/31/2022440709459Open ↗
▸BISNYCT WRITTEN PREMISSION FOR BPP WORK1
09/27/2024440709459Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00627251-I1Open ↗