DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB11/28/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB05/29/1996VWH-VIOLATION WORK W/OUT PMT HAZARDOUS - ACTIVE
DOB05/29/1996V-DOB VIOLATION - ACTIVE
ECB08/30/2018WORK WITHOUT A PERMIT.WORK NOTED: AT 1ST FLOOR ( )ERECTED FULL HEIGHT PARTITIONS TO CREATE 4 MASSAGE ROOMS SUSPENDED CEILING.(METAL WIRING)IN ( )FACADE.PREMISES ERECTING AWNING SIGN "AAA MILAN LLC"Nothing owed — awaiting certificate of correction
ECB08/30/2018OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPARTMENT OF BUILDINGS RECORDS. I CARD DATED 2/5/08 NOW FIRST FLOOR OCCUPYING AS AN ADULT PHYSICAL ( )ESTABLISHMENT AND PHYSICAL ( ) .Nothing owed — awaiting certificate of correction
ECB08/30/201873-36 1ST FLOOR OCCUPYING AS AN ADULT PHYSICAL ( )ESTABLISHMENT AND PHYSICAL ( ) ESTABLISHMENT "AAA MILAN LLC" MASSAGE PARLOR. WITHOUT BSA APPROVAL AS PER ZR12-10.NOTED: HAVING CREATED 4 MASSAGENothing owed — awaiting certificate of correction
Primarily 3 family with 1 store or office · 2,562 sf lot · 1.37 FAR built · Flood zone X