ECB07/16/2026FACADE IN DISREPAIR, WITH HORIZONTAL AND VERTICAL CRACKS THROUGHOUT. AT TOP OF WINDOW AND AT COLUMN BUMP OUTS STUCCO IS SPALLING AND DELAMINATING. THIS CAUSES A SEVERE FALL HAZARD THAT CAN RESULT WITH INJURY OR$6K due
DOB04/27/2026REMEDY: SEAL BUILDING
DOB04/24/2026STRUCTRUE RENDERED NON COMPLIANT DE TO LARFE CRACK IN PAPARPET IN EXPO SURE # 1 WHICH IS IN DANGER OF FALLING IN ADJACENT PROPERTY THE OWNER TO HIRE A LICENSE NYSPE TO SUBMIT A REPORT WITH PLANS TO ERTINSPECTIONS@BUILDINGS.NYC.GOV STATING TIME FRAME OF REPAIRS TIME LINE TO BE COMPLETED
ECB04/24/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED LARGE CRACKS IN FACADE ON EXP #ONE PARAPET ROOF IN A STATE OF REPAIR. REMEDY: REPAIR AND REPLACE.$2K due
Contractors warehouse · 1.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.