← Back
Three families
36-31 171ST STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4624770
💬 Discuss this project
2024Year Built
3.25Stories
C0Building Class
R5BZoning
3,217 sfGross Floor Area
3Units
0 Open Violations
Three families · Owner of record: LCRZ LLC · 2,200 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 36p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYNASTY CONTRACTING1907/08/2026
19649 45 AVE LLC1303/22/2026
L2 CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2025$2.0M—— → —$620/sf building
07/28/2022$1.2M—Private party → 19649 45 AVE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC304/22/2025
MEHDI GHAZI, P.E., P.C.309/19/2024
AMERILAND BROOK LLC608/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L2 CONSTRUCTION INCGeneral Contractor403/21/2026
DYNASTY CONTRACTING LLCGeneral Contractor303/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129604/22/2025
BUILDING CONSULTING ENGIN1034209/19/2024
AMERILAND BROOK LLC1506408/19/2023
Building Lifecycle
All (102)Filed (11)Permit Issued (5)Signed Off (3)Violation (2)Inspection (9)Objection (42)Special Inspection (30)
07/21/2025
Signed off — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-I1
04/22/2025
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-P3
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/22/2025
Special inspection requirement — Metering
MEHDI GHAZI
04/22/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
04/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
04/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
04/22/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
04/22/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
04/22/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
04/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/22/2025
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
04/22/2025
Special inspection requirement — Final
MEHDI GHAZI
04/22/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
04/22/2025
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
04/22/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
04/22/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
04/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
04/22/2025
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
04/22/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
04/22/2025
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
04/22/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
04/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
04/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
04/03/2025
Signed off — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-S1
03/31/2025
Signed off — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-S2
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2025
Objection raised — Other
02/03/2025
Objection resolved — Addressed
02/03/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Other
01/28/2025
Objection raised — Other
01/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/18/2025
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-P2
01/16/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/16/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
01/16/2025
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
01/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
10/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/18/2024
Violation issued (ECB, closed)
Construction
09/23/2024
Permit issued — Plumbing
Q00965970-S2-EW-SP
09/19/2024
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-P1
09/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2024
Permit issued — Plumbing
Q00965970-S2-PL
06/28/2024
Violation issued (ECB, closed)
Unknown
06/04/2024
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00965970-S2
05/10/2024
Permit issued — Foundation
Q00965970-S1-GC-CX
05/10/2024
Permit issued — Mechanical Systems
Q00965970-I1-GC-CX
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC09/23/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO07/23/2024
DOB NOWFoundationSigned-offL2 CONSTRUCTION INC05/10/2024
DOB NOWMechanical SystemsPermit IssuedL2 CONSTRUCTION INC05/10/2024
DOB NOWFoundationPermit IssuedDYNASTY CONTRACTING LLC08/10/2023
2 projects · most recent 04/22/2025
Heating Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/22/2025Signed-offL2 CONSTRUCTION INCAir Conditioning Systems, Heating Systems
Cooling
Gree MULTI36HP230V1EO 36,000 BTU · Heat Pump Outdoor ×9
Heating
Williamson GWA-067 67,000 BTU · Boiler ×9
08/19/2023Permit IssuedDYNASTY CONTRACTING LLCAssociated Ducts and Piping, Heating Systems
Heating
Navien NCB-240 120,000 BTU · Boiler ×3
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×8
Air King EB30BL 130 CFM · Kitchen Exhaust ×3
2 projects · most recent 04/22/2025
Sprinkler System
FiledStatusContractorScope
04/22/2025Signed-offPARAMOUNT SERVICES, LLCSprinkler System
08/19/2023——Sprinkler System
2 projects · most recent 04/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/22/2025Signed-offWASOFF PLBG & UTILITY COGas, Storm, Water/Sanitary
08/19/2023——Gas, Storm, Water/Sanitary
1 project · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/19/2023
Steel Concrete Masonry
FiledStatusContractorScope
08/19/2023Permit IssuedDYNASTY CONTRACTING LLCSteel, Concrete, Masonry
1 project · most recent 08/19/2023
Earthwork
FiledStatusContractorScope
08/19/2023Permit IssuedDYNASTY CONTRACTING LLCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
04/22/2025Chimneys and ventsMEHDI GHAZIspecial
04/22/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/22/2025Heating SystemsMEHDI GHAZIspecial
04/22/2025Mechanical SystemsMEHDI GHAZIspecial
04/22/2025Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
04/22/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/22/2025FinalMEHDI GHAZIprogress
04/22/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
04/22/2025Interior lighting powerMEHDI GHAZIenergy_progress
04/22/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
04/22/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
04/22/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
04/22/2025MeteringMEHDI GHAZIenergy_progress
04/22/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
04/22/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
04/22/2025Ventilation and air distribution systemMEHDI GHAZIenergy_progress
04/22/2025Fenestration areasMEHDI GHAZIenergy_progress
04/22/2025Maintenance informationMEHDI GHAZIenergy_progress
04/22/2025Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
04/22/2025Air barrier — testing MEHDI GHAZIenergy_progress
04/22/2025Fenestration air leakageMEHDI GHAZIenergy_progress
04/22/2025Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
04/22/2025Permanent certificateMEHDI GHAZIenergy_progress
04/22/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
01/16/2025Ventilation and air distribution systemMEHDI GHAZIenergy_progress
Latest 25 of 91.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026Q00909366-S1Request digital key ↗
08/24/2026Q00909366-P1Request digital key ↗
08/24/2026Q00909366-S3Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZoning Exhibit form (1-5)4
08/22/2026Q00965970-I1Open ↗
08/22/2026Q00965970-P2Open ↗
08/13/2026Q00965970-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/22/2026Q00965970-I1Open ↗
08/22/2026Q00965970-P2Open ↗
08/13/2026Q00965970-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 12
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q00909366-I1Open ↗
08/13/2026Q00965970-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-P3Open ↗
▸DOB NOWRestrictive Declaration/Easement 32
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-P3Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026Q00909366-S1Open ↗
08/24/2026Q00909366-I1Open ↗
08/24/2026Q00909366-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/27/2026Q00965970-P3Open ↗
08/27/2026Q00965970-P3Open ↗
08/27/2026Q00965970-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q00965970-P3Open ↗
08/27/2026Q00965970-P3Open ↗
08/27/2026Q00965970-P3Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/22/2026Q00965970-P2Open ↗
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00909366-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/22/2026Q00965970-P2Open ↗
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00965970-I1Open ↗
08/13/2026Q00965970-S1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026Q00965970-S1Open ↗
08/13/2026Q00965970-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00965970-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/22/2026Q00965970-P2Open ↗
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00965970-S1Open ↗
08/13/2026Q00965970-I1Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial5
08/22/2026Q00965970-P2Open ↗
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/22/2026Q00965970-P2Open ↗
08/22/2026Q00965970-I1Open ↗
08/13/2026Q00965970-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/22/2026Q00965970-I1Open ↗
08/22/2026Q00965970-P2Open ↗
08/15/2026Q00909366-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00909366-S1Open ↗
08/13/2026Q00965970-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00965970-I1Open ↗