← Back
Multi-story retail building (2+)
36-41 MAIN STREET
QUEENS · BIN 4112334
💬 Discuss this project
1940Year Built
2Stories
K2Building Class
C4-3Zoning
18,768 sfGross Floor Area
4Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: MEHRAN REALTY CORP · 11,106 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
StructuralMechanicalOther
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 41p · 1 filing · 3 docs
Floor 3
Floor 23p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEHRAN PROPERTY MGT1907/08/2026
MEHRAN REALTY4203/22/2026
MEHRAN REATLY CORP103/22/2026
MEHRAM REALTY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2L LLC1303/13/2025
ENTHINK ENGINEERS LLC206/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H2L LLCGeneral Contractor1207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
SERRAS CONTRACTING CORPGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.591404/23/2024
Building Lifecycle
All (79)Filed (14)Permit Issued (9)Signed Off (7)Violation (19)Inspection (5)Special Inspection (25)
06/18/2026
Violation issued (ECB, open)
Unknown
03/13/2025
Filed — No Work
Q01148871-P1
12/02/2024
Filed — No Work
Q01148871-I1
05/21/2024
Signed off — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-S2
05/20/2024
Permit issued — Foundation
Q08049558-S2-EA
05/08/2024
Signed off — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-S1
05/03/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE MAXIMUM 3 FEET FROM LOT LINE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00831771-I1
05/03/2024
Signed off — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-I1
04/24/2024
Special inspection requirement — Maintenance information
BRANDON LIU
04/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
BRANDON LIU
04/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRANDON LIU
04/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRANDON LIU
04/24/2024
Special inspection requirement — Air barrier - visual inspection
BRANDON LIU
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
04/24/2024
Special inspection requirement — Mechanical Systems
Fei Zeng
04/24/2024
Special inspection requirement — Final
Fei Zeng
04/24/2024
Special inspection requirement — Air barrier — testing
BRANDON LIU
04/24/2024
Special inspection requirement — Interior lighting power
BRANDON LIU
04/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRANDON LIU
04/23/2024
Filed — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-P1
04/12/2024
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES & GAS EQUIPMENTS ASSOCIATED WITH RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENTS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00812712-I1
03/26/2024
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES & GAS EQUIPMENTS ASSOCIATED WITH RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENTS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00812712-P3
12/27/2023
Permit issued — Mechanical Systems
Q08049558-I1-GC-CX
10/05/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES & GAS EQUIPMENTS ASSOCIATED WITH RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENTS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00812712-P2
09/29/2023
Signed off — Alteration
Q00875764-I1
09/14/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES & GAS EQUIPMENTS ASSOCIATED WITH RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENTS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00812712-P1
08/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/22/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2023
Filed — Alteration
Q00875764-P1
05/18/2023
Filed — Alteration
Q00875764-I1
05/18/2023
Permit issued — Sidewalk Shed
Q00875764-I1-SH
02/22/2023
Permit issued — Construction Fence
Q00831771-I1-FN
02/20/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE MAXIMUM 3 FEET FROM LOT LINE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00831771-I1
02/03/2023
Permit issued — Structural
Q08049558-S1-ST
01/25/2023
Filed — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-S1
01/25/2023
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
01/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
01/18/2023
Permit issued — Plumbing
Q00812712-I1-PL
01/13/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES & GAS EQUIPMENTS ASSOCIATED WITH RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENTS ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00812712-I1
01/05/2023
Permit issued — Foundation
Q08049558-S2-FO
12/27/2022
Signed off — Alteration
Q08035440-I1
12/22/2022
Permit issued — General Construction
Q08049558-I1-GC-CX
12/19/2022
Filed — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-S2
12/19/2022
Special inspection requirement — Masonry
Fei Zeng
12/16/2022
Special inspection requirement — Structural Wood Frame
Fei Zeng
12/16/2022
Special inspection requirement — Masonry
Fei Zeng
12/16/2022
Special inspection requirement — Structural Steel - Details
Fei Zeng
12/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
12/16/2022
Special inspection requirement — Concrete - Cast-In-Place
Fei Zeng
12/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Fei Zeng
12/16/2022
Special inspection requirement — Structural Steel - Welding
Fei Zeng
12/13/2022
Special inspection requirement — Final
Fei Zeng
12/13/2022
Special inspection requirement — Final
Fei Zeng
12/13/2022
Special inspection requirement — Footing and Foundation
Fei Zeng
12/09/2022
Filed — Alteration
GENERAL CONSTRUCTION AND MECH WORK OF INTERIOR RENOVATION OF EXISTING EASTING & DRINKING ESTABLISHMENT ON 2ND FLOOR. NEW PARTIITONS, DOORS AND HVAC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NEW ALUMN CLADDING ON EXSTING FACDE AND NEW 1ST FLOOR STOREFRONT.
Q08049558-I1
11/18/2022
Permit issued — General Construction
Q08035440-I1-GC
11/07/2022
Filed — Alteration
Q08035440-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offH2L LLC05/20/2024
DOB NOWMechanical SystemsSigned-offH2L LLC12/27/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/18/2023
DOB NOWConstruction FenceSigned-offH2L LLC02/22/2023
DOB NOWStructuralSigned-offH2L LLC02/03/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC01/18/2023
DOB NOWFoundationSigned-offH2L LLC01/05/2023
DOB NOWGeneral ConstructionSigned-offH2L LLC12/22/2022
DOB NOWGeneral ConstructionSigned-offSERRAS CONTRACTING CORP11/18/2022
BISOTISSUEDTGC CONSTRUCTION INC10/23/2019
BIS—ISSUEDH2L, LLC03/02/2015
BISOTISSUEDH2L LLC01/05/2015
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC08/20/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC08/20/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC08/12/2014
BISOTISSUEDH2L LLC04/18/2014
BISEQISSUEDH2L LLC04/18/2014
BISPLISSUEDQMB PLUMBING & HEATING INC04/21/2009
BISFPISSUEDSENTINEL FIRE CONTROL INC04/15/2009
BISMHISSUEDH2L LLC03/19/2009
BISMHISSUEDH2L MILLWORK CONSTRUCTION INC10/18/2005
BISMHISSUEDLOCO AIR CONDITION06/28/2005
BISPLISSUEDC.R.U. MECHAN & HEAT INC04/15/2005
BISOTISSUEDH2L MILLWORK CONSTRUCTION INC04/08/2005
BISMHISSUEDBALAJI CONSTRUCTION01/26/2004
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO08/06/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO08/06/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO08/05/2003
BISMHISSUEDPETERROCK CONSTRUCTION04/12/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC03/20/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC03/20/2000
BIS—ISSUEDGOING SIGN & SVCNG CO,INC03/20/2000
BISPLISSUEDCROSSFIELD PLBG.&HTG09/23/1999
BISOTISSUEDPETROCK CONSTRUCTION08/05/1999
BISSPISSUEDC.R.U. MECHAN & HEAT INC11/27/1995
BISPLISSUEDC.R.U. MECHAN & HEAT INC10/23/1995
BIS—ISSUEDEAST SUN CORP08/28/1995
BISPLISSUEDZARA PLUMBING CORP02/10/1995
BISOTISSUEDED BROIDY CONTRACTORS02/08/1995
BISMHISSUEDED BROIDY CONTRACTORS02/08/1995
+ 3 more permits on file
4 projects · most recent 01/23/2024
General Wiring
FiledStatusContractorScope
01/23/2024CompletePOWERONE ELECT'L CONTRGGeneral Wiring
05/11/2023CompleteELPO ELECTRICAL CONTG INC—
11/02/2022CompleteTITAN ELEC'L & ELEV CONTR—
11/07/2019CompleteR & T ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
04/24/2024Maintenance informationBRANDON LIUenergy_progress
04/24/2024Duct leakage testing, insulation and designBRANDON LIUenergy_progress
04/24/2024HVAC-R and service water heating equipmentBRANDON LIUenergy_progress
04/24/2024HVAC-R and service water heating system controlsBRANDON LIUenergy_progress
04/24/2024Air barrier - visual inspectionBRANDON LIUenergy_progress
04/24/2024Fire-Resistant Penetrations and JointsFei Zengspecial
04/24/2024Mechanical SystemsFei Zengspecial
04/24/2024FinalFei Zengprogress
04/24/2024Air barrier — testing BRANDON LIUenergy_progress
04/24/2024Interior lighting powerBRANDON LIUenergy_progress
04/24/2024HVAC-R and service water piping design and insulationBRANDON LIUenergy_progress
01/25/2023Concrete - Cast-In-PlaceFei Zengspecial
01/25/2023Structural Stability – Alterations of existing buildingsFei Zengspecial
12/19/2022MasonryFei Zengspecial
12/16/2022Structural Wood FrameFei Zengprogress
12/16/2022MasonryFei Zengspecial
12/16/2022Structural Steel - DetailsFei Zengspecial
12/16/2022Structural Stability – Alterations of existing buildingsFei Zengspecial
12/16/2022Concrete - Cast-In-PlaceFei Zengspecial
12/16/2022Structural Steel - High Strength BoltingFei Zengspecial
12/16/2022Structural Steel - WeldingFei Zengspecial
12/13/2022FinalFei Zengprogress
12/13/2022FinalFei Zengprogress
12/13/2022Footing and FoundationFei Zengprogress
11/07/2022FinalBRANDON LIUprogress
▾Documents — 278 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/25/2026Q08035440-I1Request digital key ↗
08/25/2026Q00812712-P2Request digital key ↗
08/25/2026Q00812712-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026Q01148871-P1Request digital key ↗
08/21/2026Q01148871-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION17
09/24/2019421914414Open ↗
12/08/2017400997980Open ↗
02/22/2017400997980Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
10/31/2019421914414Open ↗
03/21/2015421047218Open ↗
01/22/2015421047986Open ↗
Showing 3 of 12 on file for this type
▸BISPLACE OF ASSEMBLY4
11/10/2018420039675Open ↗
04/17/2015420039675Open ↗
08/03/2012420039675Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
04/02/2011420039675Open ↗
05/07/2010420039675Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
11/28/2017400997980Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/16/2015421047218Open ↗
▸Seals & Professional Certifications86
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
02/18/2020421914414Open ↗
10/31/2019421914414Open ↗
08/18/2016421047986Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026Q00812712-P3Open ↗
08/25/2026Q00812712-I1Open ↗
08/25/2026Q00812712-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
09/24/2019421914414Open ↗
12/11/2014421047218Open ↗
12/10/2014421047986Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q08049558-I1Open ↗
09/02/2026Q08049558-I1Open ↗
08/27/2026Q08049558-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q08049558-I1Open ↗
09/02/2026Q08049558-I1Open ↗
09/01/2026Q08035440-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
09/24/2019421914414Open ↗
12/11/2014421047218Open ↗
12/10/2014421047986Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
04/01/2013420826413Open ↗
07/08/2010420212585Open ↗
06/30/2010420206244Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
08/11/2017421047218Open ↗
04/03/2013420826413Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/10/2014421047986Open ↗
12/10/2014421047986Open ↗
09/02/2014421013995Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/08/2010420212585Open ↗
06/30/2010420206244Open ↗
Showing 2 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/02/2014421013744Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
02/18/2020421914414Open ↗
10/31/2019421914414Open ↗
08/18/2016420966869Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/18/2020421914414Open ↗
02/29/2016420966869Open ↗
02/29/2016421047986Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/18/2020421914414Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
02/18/2020421914414Open ↗
08/28/2017421047218Open ↗
08/11/2017421047218Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
12/08/2017400997980Open ↗
08/28/2017421047218Open ↗
08/28/2017421047218Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
08/26/2014421013575Open ↗
08/22/2014421013744Open ↗
08/22/2014421013995Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/30/2015421047218Open ↗
12/11/2014421047218Open ↗
04/01/2013420826413Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT20
02/18/2020421914414Open ↗
09/24/2019421914414Open ↗
08/18/2016421047986Open ↗
Showing 3 of 20 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
10/22/2015421047218Open ↗
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET11
09/24/2019421914414Open ↗
12/11/2014421047218Open ↗
12/10/2014421047986Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION7
02/10/2020421914414Open ↗
02/06/2020421914414Open ↗
01/30/2020421914414Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
11/10/2018420039675Open ↗
12/08/2017400997980Open ↗
12/08/2017400997980Open ↗
Showing 3 of 5 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM3
12/11/2014421047218Open ↗
04/03/2013420826413Open ↗
12/11/2014421047218Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08049558-S2Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q08049558-S1Open ↗