← Back
BuildNYC
Miscellaneous religious facility
36-49 11TH STREET
QUEENS · BIN 4439169
💬 Discuss this project
1950Year Built
3Stories
M9Building Class
R5DZoning
46,963 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: St Rita's Roman Catholic Church · 81,200 sf lot · 0.58 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSt. Rita's Roman Catholic Church29p · 3 filings · 18 docs
BulkheadSt. Rita's Roman Catholic Church1p · 1 filing · 6 docs
Floor 1St. Rita's Roman Catholic Church, Voice Charter School20p · 4 filings · 18 docs
CellarSt. Rita's Roman Catholic Church5p · 1 filing · 16 docs
Site & exteriorSt. Rita's Roman Catholic Church28p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Rita Roman Catholic Church3607/08/2026
Rocklyn Asset1307/08/2026
St Rita's R.C. Church203/21/2026
Wesbuilt Construction103/22/2026
NYC Admin Child Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering201/15/2026
JWM Group203/03/2025
Siri + Marsik Architects210/25/2024
MSM Engineering Services104/04/2024
MJ Engineering & Design403/06/2024
Larson Architecture Works208/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec203/21/2026
Archetype Consultants803/21/2026
MJ Engineering & Design803/21/2026
Rybak Development403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jab IndustriesGeneral Contractor1007/08/2026
Victoria Restorationspecialty_contractor407/08/2026
Idl Contracting ServicesGeneral Contractor303/21/2026
Jab IndustriesScaffold303/21/2026
Accurate Electrical ContractorsElectrical103/22/2026
Wesbuilt Construction ManGeneral Contractor104/09/2026
LemxScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983201/15/2026
Certified Testing Laborat396303/06/2024
Building Lifecycle
All (82)Filed (13)Permit Issued (11)Signed Off (9)Violation (17)Objection (2)Special Inspection (30)
01/27/2026
Signed off — Alteration
Replacement of 2 indoor vertical ACs. No change in egress, use or occupancy.
Q01225818-I1
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
01/26/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
01/15/2026
Filed — Alteration
Replacement of 2 indoor vertical ACs. No change in egress, use or occupancy.
Q01225818-P1
12/19/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
11/17/2025
Permit issued — Mechanical Systems
Q01225818-I1-MS
11/15/2025
Violation issued (FDNY_NOV, closed)
10/27/2025
Violation issued (FDNY_NOV, closed)
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_NOV, closed)
07/01/2025
Violation issued (FDNY_NOV, closed)
06/27/2025
Filed — Alteration
Replacement of 2 indoor vertical ACs. No change in egress, use or occupancy.
Q01225818-I1
03/27/2025
Signed off — Alteration
Q01015188-I1
03/27/2025
Signed off — Alteration
Facade and roof restoration as indicated on drawings.
Q01015178-I1
03/26/2025
Permit issued — Structural
Q01015188-I1-ST
03/17/2025
Signed off — Alteration
CONCRETE FOUNDATION FOR PROPOSED NEW WALKWAY WITH NO CHANGE TO THE BUILDING AREA LOT COVERAGE, EGRESS PATHS, STAIRS AND PARKING.
Q00854760-S1
03/04/2025
Special inspection requirement — Final
JERRY MISIEWICZ
03/03/2025
Filed — Alteration
Q01015188-P1
03/03/2025
Special inspection requirement — Final
JERRY MISIEWICZ
02/18/2025
Permit issued — Structural
Q01015188-I1-ST
10/25/2024
Filed — Alteration
Facade and roof restoration as indicated on drawings.
Q01015178-P1
10/25/2024
Special inspection requirement — Final
JIRI MARSIK
09/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01026307-I1
07/29/2024
Violation issued (FDNY_NOV, closed)
07/12/2024
Signed off — Alteration
Q00914849-I1
07/08/2024
Signed off — Alteration
CONCRETE FOUNDATION FOR PROPOSED NEW WALKWAY WITH NO CHANGE TO THE BUILDING AREA LOT COVERAGE, EGRESS PATHS, STAIRS AND PARKING.
Q00854760-S2
06/06/2024
Signed off — Alteration
CONCRETE FOUNDATION FOR PROPOSED NEW WALKWAY WITH NO CHANGE TO THE BUILDING AREA LOT COVERAGE, EGRESS PATHS, STAIRS AND PARKING.
Q00854760-I1
06/06/2024
Permit issued — General Construction
Q01015178-I1-GC
04/16/2024
Violation issued (FDNY_ORDER, closed)
04/05/2024
Permit issued — Sidewalk Shed
Q01026307-I1-SH
04/04/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01026307-I1
03/27/2024
Filed — Alteration
Q01015188-I1
03/26/2024
Filed — Alteration
Facade and roof restoration as indicated on drawings.
Q01015178-I1
03/12/2024
Violation issued (FDNY_NOV, closed)
03/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KIRT DOBBINS
03/07/2024
Special inspection requirement — Concrete - Cast-In-Place
KIRT DOBBINS
03/07/2024
Special inspection requirement — Footing and Foundation
KIRT DOBBINS
03/07/2024
Special inspection requirement — Final
KIRT DOBBINS
03/06/2024
Filed — Alteration
CONCRETE FOUNDATION FOR PROPOSED NEW WALKWAY WITH NO CHANGE TO THE BUILDING AREA LOT COVERAGE, EGRESS PATHS, STAIRS AND PARKING.
Q00854760-P3
03/06/2024
Special inspection requirement — Footing and Foundation
KIRT DOBBINS
03/06/2024
Special inspection requirement — Concrete - Cast-In-Place
KIRT DOBBINS
03/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KIRT DOBBINS
03/06/2024
Special inspection requirement — Final
KIRT DOBBINS
02/21/2024
Violation issued (FDNY_NOV, closed)
01/16/2024
Signed off — Alteration
EXCAVATE AND REMOVE SOIL FROM THE SIDE OPEN YARD TO INSTALL NEW WALKWAY.
Q00914887-I1
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWesbuilt Construction Man11/17/2025
DOB NOWStructuralSigned-offWauldwell Wingate Co03/26/2025
DOB NOWStructuralSigned-offWauldwell Wingate Co02/18/2025
DOB NOWGeneral ConstructionSigned-offWauldwell Wingate Co06/06/2024
DOB NOWSidewalk ShedSigned-offLemx04/05/2024
DOB NOWEarth WorkSigned-offJab Industries09/11/2023
DOB NOWSupport of ExcavationSigned-offJab Industries09/08/2023
DOB NOWGeneral ConstructionSigned-offJab Industries09/07/2023
DOB NOWFoundationSigned-offJab Industries09/07/2023
DOB NOWConstruction FenceSigned-offJab Industries08/23/2023
DOB NOWGeneral ConstructionSigned-offIdl Contracting Services07/18/2023
BISSPISSUEDOrion Plumbing & Heating03/30/2017
BISMHISSUEDDJM NYC07/13/2016
BISOTISSUEDDJM NYC07/13/2016
BISSPISSUEDOrion Plumbing & Heating08/26/2015
BISPLISSUEDOrion Plumbing & Heating08/21/2015
BISOTISSUEDDJM NYC08/19/2015
BISMHISSUEDDJM NYC08/19/2015
BISOTISSUEDBayside Contracting05/22/2015
BISOTISSUEDBayside Contracting12/17/2014
BISPLISSUEDRRP Plumbing10/30/2007
BISFPISSUEDChief Fire Prevention & Mechanical07/19/2007
BISPLISSUEDC S Plumbing06/14/2000
BISOTISSUEDMonterey Construction01/18/2000
BISOTISSUEDMonterey Construction05/03/1999
4 projects · most recent 08/27/2026
General Wiring
FiledStatusContractorScope
08/27/2026Permit IssuedElectric EssentialsGeneral Wiring
11/14/2025Permit IssuedAccurate Electrical ContractorsGeneral Wiring
04/04/2024CompleteRichard Neu—
07/19/2023CompleteW & M ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/26/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
01/26/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
01/26/2026Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
01/26/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
01/26/2026Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
01/26/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
01/26/2026FinalALEXIS SCHLESSINGERMANprogress
01/26/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
01/26/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
12/19/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
12/19/2025Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
12/19/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/19/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/19/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/19/2025Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
12/19/2025FinalALEXIS SCHLESSINGERMANprogress
12/19/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
12/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
03/04/2025FinalJERRY MISIEWICZprogress
03/03/2025FinalJERRY MISIEWICZprogress
10/25/2024FinalJIRI MARSIKprogress
03/07/2024Structural Stability – Alterations of existing buildingsKIRT DOBBINSspecial
03/07/2024Concrete - Cast-In-PlaceKIRT DOBBINSspecial
03/07/2024Footing and FoundationKIRT DOBBINSprogress
03/07/2024FinalKIRT DOBBINSprogress
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. Rita's Roman Catholic ChurchReligiousCellar, Floor 1, Roof
Project Q01225818 Alteration · LOC Issued · 06/27/2025
Project Q01026307 Alteration · LOC Issued · 04/04/2024
Project Q01015188 Alteration · LOC Issued · 03/27/2024
Project Q01015178 Alteration · LOC Issued · 03/26/2024
Project Q00854760 Alteration · LOC Issued · 05/18/2023
Voice Charter SchoolEducationFloor 1
Project Q00914887 Alteration · LOC Issued · 08/15/2023
Project Q00914849 Alteration · LOC Issued · 08/14/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026Q00914849-I1Request digital key ↗
08/24/2026Q00914887-I1Request digital key ↗
08/23/2026Q00854760-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION10
10/25/2017420346860Open ↗
09/26/2016421180331Open ↗
08/30/2016421180331Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
09/10/2015421180331Open ↗
08/31/2015421180340Open ↗
08/24/2015421180331Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY3
07/28/2011420346860Open ↗
07/02/2011420346860Open ↗
04/27/2011420346860Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026Q01225818-I1Open ↗
09/23/2026Q01225818-I1Open ↗
09/01/2026Q01015188-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
05/19/2017421180331Open ↗
05/19/2017421180331Open ↗
03/31/2017421180340Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026Q00914849-I1Open ↗
08/23/2026Q00854760-S1Open ↗
08/23/2026Q00854760-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01225818-I1Open ↗
08/31/2026Q00854760-S1Open ↗
08/31/2026Q00854760-S1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
08/25/2016421180331Open ↗
08/25/2016421180340Open ↗
07/24/2015421180331Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
11/04/2015421180340Open ↗
10/26/2015421180331Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/27/2011420346860Open ↗
▸Environmental & Asbestos26
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026Q00854760-S1Open ↗
08/13/2026Q00854760-S2Open ↗
08/13/2026Q01015178-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026Q01225818-I1Open ↗
08/13/2026Q01015188-I1Open ↗
08/13/2026Q01015188-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026Q00854760-S1Open ↗
08/23/2026Q00854760-I1Open ↗
08/23/2026Q01015188-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/25/2015421180340Open ↗
07/24/2015421180331Open ↗
09/25/2014421027560Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00854760-S2Open ↗
08/17/2026Q01225818-I1Open ↗
08/17/2026Q01225818-P1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/09/2014421027560Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/18/2015421180331Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form1
08/13/2026Q01015178-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/19/2017421180331Open ↗
08/24/2015421180331Open ↗
08/24/2015421180331Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/19/2017421180331Open ↗
05/19/2015421027560Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/24/2026Q00914849-I1Open ↗
08/23/2026Q01015188-I1Open ↗
08/23/2026Q01015188-P1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/29/2018421180340Open ↗
05/30/2017421180331Open ↗
07/22/2015421027560Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/25/2015421180340Open ↗
08/18/2015421180331Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/25/2014421027560Open ↗
04/25/2011420346860Open ↗
▸BISIntent to Rescind Letter1
04/18/2018421180340Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
01/12/2018421180340Open ↗
09/26/2016421180331Open ↗
09/23/2016421180340Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
04/18/2018421180340Open ↗
10/28/2016421180331Open ↗
10/28/2016421180331Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
07/24/2015421180331Open ↗
07/21/2015421180331Open ↗
06/29/2015421180340Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
01/29/2018421180340Open ↗
10/25/2017420346860Open ↗
▸Other Documents2
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026Q01015178-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00914887-I1Open ↗