← Back
BuildNYC
Multi-story retail building (2+)
36-49 BELL BOULEVARD
QUEENS · Bayside · BIN 4136569
💬 Discuss this project
1962Year Built
2Stories
K2Building Class
R4Zoning
12,250 sfGross Floor Area
12Units
0 Active ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: Gnva Realty · 13,200 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVirgilio Associates, LLC1p · 1 filing · 12 docs
Floor 2Gnva Realty LLC2 filings · 6 docs
Floor 1Virgilio Associates LLC17p · 3 filings · 20 docs
CellarVirgilio Associates LLC6p · 3 filings · 20 docs
Filed — no permit issuedNVA-Bayside Animal Clinic4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Virgilio Associates2407/08/2026
Gnva Realty2307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2024$7.2M—— → —$584/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE112/15/2025
Flushing510/25/2024
Gerald Caliendo Architects206/21/2024
Bernard Ocasio Architect403/04/2024
BKH Architect108/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J Caliendo Architect403/21/2026
New York Signs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Deco HomeGeneral Contractor407/08/2026
Omada ConstructionGeneral Contractor207/08/2026
J-J PlumbingPlumbing207/08/2026
Lintech ElectricElectrical103/22/2026
Dual PurposeGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Flushing Engineering Service4373510/25/2024
BKH Architect6255108/25/2020
Building Lifecycle
All (91)Filed (13)Permit Issued (8)Signed Off (8)Violation (4)Inspection (8)Objection (24)Special Inspection (26)
12/15/2025
Filed — Alteration
Q01328382-I1
02/03/2025
Signed off — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-I1
01/30/2025
Signed off — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-S1
11/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2024
Signed off — Alteration
INSTALL PLUMBING FIXTURES AT FIRST AND PARTIAL CELLAR AS PER PLANS FILED.
Q01012775-I1
11/14/2024
Signed off — Alteration
INSTALL PLUMBING FIXTURES AT FIRST AND PARTIAL CELLAR AS PER PLANS FILED.
Q01012775-S1
11/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2024
Signed off — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-S2
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
KY FU
11/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
11/01/2024
Permit issued — General Construction
Q01012775-I1-GC
10/29/2024
Permit issued — Mechanical Systems
Q01062070-S2-MS
10/25/2024
Filed — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-P2
10/25/2024
Filed — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-P1
10/16/2024
Objection resolved — Addressed
10/15/2024
Objection resolved — Addressed
10/08/2024
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTRUES IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK AT FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01009111-I1
10/08/2024
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTRUES IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK AT FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01009111-S1
10/01/2024
Special inspection requirement — Energy Code Compliance Inspections
KY FU
10/01/2024
Special inspection requirement — Final
KY FU
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
10/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
09/30/2024
Objection resolved — Addressed
09/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2024
Permit issued — Plumbing
Q01012775-S1-PL
07/26/2024
Permit issued — Plumbing
Q01009111-S1-PL
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2024
Permit issued — Plumbing
Q01062070-S1-PL
07/03/2024
Permit issued — General Construction
Q01062070-I1-GC
07/03/2024
Permit issued — General Construction
Q01009111-I1-GC
07/02/2024
Filed — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-S2
06/25/2024
Objection resolved — Addressed
06/25/2024
Objection resolved — Addressed
06/25/2024
Objection resolved — Addressed
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
KY FU
06/21/2024
Filed — Alteration
Q01070500-I1
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/20/2024
Objection raised — Scope
06/20/2024
Objection raised — Other
06/20/2024
Objection raised — Other
06/17/2024
Special inspection requirement — Mechanical Systems
KY FU
06/17/2024
Special inspection requirement — Final
KY FU
06/13/2024
Filed — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-I1
06/13/2024
Filed — Alteration
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB # Q01062070, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Q01062070-S1
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection resolved — Addressed
06/06/2024
Objection raised — Inspections
06/06/2024
Objection raised — Scope
06/06/2024
Objection raised — Other
06/06/2024
Objection raised — Structural
05/28/2024
Filed — Alteration
HEREWITH FILING ALTERATION TYPE 2 FOR THE INTERIOR MODIFICATION AND RENOVATION OF THE EXISTING BATHROOMS AND ENCLOSE THE MECHANICAL ROOM IN THE CELLAR AND OBTAIN THE LETTER OF COMPLETION FOR SAME.
Q01056276-I1
04/25/2024
Objection raised — Other
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOmada Construction11/01/2024
DOB NOWMechanical SystemsSigned-offDeco Home10/29/2024
DOB NOWPlumbingSigned-offJ-J Plumbing07/26/2024
DOB NOWPlumbingSigned-offJ-J Plumbing07/26/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp07/11/2024
DOB NOWGeneral ConstructionSigned-offDeco Home07/03/2024
DOB NOWGeneral ConstructionSigned-offOmada Construction07/03/2024
DOB NOWMechanical SystemsSigned-offDual Purpose09/01/2020
BISOTISSUEDArtisan Services01/24/2017
BISOTISSUEDArtisan Services05/17/2016
BISOTISSUEDBuild-EZ10/26/2012
BISPLISSUEDUnlimited PLG Solutions04/21/2011
BISOTISSUEDG.C. Home Improvement04/21/2011
BISMHISSUEDDual Purpose04/08/1996
1 project · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025CompleteLintech ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/04/2024Energy Code Compliance InspectionsKY FUprogress
11/04/2024HVAC-R and service water piping design and insulationKY FUenergy_progress
11/04/2024Fire-Resistant Penetrations and JointsKY FUspecial
10/01/2024Energy Code Compliance InspectionsKY FUprogress
10/01/2024FinalKY FUprogress
10/01/2024Fire-Resistant Penetrations and JointsKY FUspecial
10/01/2024HVAC-R and service water piping design and insulationKY FUenergy_progress
10/01/2024Fire-Resistant Penetrations and JointsKY FUspecial
06/24/2024Energy Code Compliance InspectionsKY FUprogress
06/21/2024Fire-Resistant Penetrations and Joints—special
06/17/2024Mechanical SystemsKY FUspecial
06/17/2024FinalKY FUprogress
02/29/2024Lighting controlsMehmet Gunalenergy_progress
02/29/2024Energy Code Compliance InspectionsMehmet Gunalprogress
02/29/2024FinalMehmet Gunalprogress
02/29/2024Interior lighting powerMehmet Gunalenergy_progress
08/21/2020HVAC insulation and sealing Brandon Hamchukenergy_progress
08/21/2020Shutoff dampersBrandon Hamchukenergy_progress
08/21/2020HVAC and service water heating system controls Brandon Hamchukenergy_progress
08/21/2020Energy Code Compliance InspectionsBrandon Hamchukprogress
08/21/2020Maintenance informationBrandon Hamchukenergy_progress
08/21/2020Permanent certificateBrandon Hamchukenergy_progress
08/21/2020Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
08/21/2020HVAC and service water heating equipment Brandon Hamchukenergy_progress
08/14/2020FinalBrandon Hamchukprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NVA-Bayside Animal ClinicMedical / Healthcare—
Project Q01328382 Alteration · Approved · 12/15/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/23/2026Q01009111-I1Request digital key ↗
08/23/2026Q01009111-S1Request digital key ↗
08/23/2026Q01012775-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00385536-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
04/25/2025420332553Open ↗
12/05/2024420781693Open ↗
11/25/2024420781693Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION5
01/25/2017421320975Open ↗
05/19/2016421320975Open ↗
11/07/2012420781693Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026Q01062070-P2Open ↗
09/01/2026Q01062070-P2Open ↗
08/28/2026Q01062070-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00385536-I1Open ↗
08/23/2026Q01012775-I1Open ↗
08/23/2026Q01012775-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01062070-P2Open ↗
08/28/2026Q01062070-P1Open ↗
08/25/2026Q01062070-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/07/2012420781693Open ↗
04/21/2011420332553Open ↗
04/02/2011420332553Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/09/2016421320975Open ↗
11/07/2012420781693Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/01/2012420781693Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/09/2016421320975Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
11/01/2012420781693Open ↗
04/21/2011420332553Open ↗
04/02/2011420332553Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
05/26/2011420332553Open ↗
04/29/2011420332553Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/09/2016421320975Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/02/2011420332553Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026Q01012775-I1Open ↗
08/23/2026Q01012775-S1Open ↗
08/22/2026Q01070500-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/09/2016421320975Open ↗
11/07/2012420781693Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/07/2012420781693Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/02/2011420332553Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/09/2016421320975Open ↗
▸Inspections & Test Reports3
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
01/24/2024420332553Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/24/2024420332553Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/24/2024420332553Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
05/09/2016421320975Open ↗
11/07/2012420781693Open ↗
03/25/2011420332553Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/25/2024420332553Open ↗
▸BISFINAL1
01/24/2024420332553Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/09/2016421320975Open ↗
11/07/2012420781693Open ↗
04/02/2011420332553Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/24/2024420332553Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/06/2016421320975Open ↗
11/01/2012420781693Open ↗