← Back
Two family brick
36 BANK STREET
MANHATTAN · West Village · BIN 1010952
💬 Discuss this project
1851Year Built
3Stories
B1Building Class
R6Zoning
4,320 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: LITTLE LEE LLC · 1,800 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof71p · 4 filings · 20 docs
Floor 375p · 5 filings · 20 docs
Floor 273p · 5 filings · 20 docs
Floor 174p · 5 filings · 20 docs
CellarUnder Construction85p · 6 filings · 20 docs
Sub-Basement71p · 5 filings · 20 docs
Site & exterior12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADE1007/08/2026
BANK STREET TRUST303/21/2026
BANK STRET TRUST C O SAM HAUPT303/21/2026
LITTLE LEE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2023$11.0M—TOWNHOUSE NO. 36 LLC → LITTLE LEE LLC$2,546/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SILMAN309/18/2025
CHEN ENGINEERING SERVICES, P.C.112/10/2024
ABS ENGINEERING, PLLC310/28/2024
GEODESIGN INC. PC209/13/2024
MSM ENGINEERING SERVICES, PLLC204/12/2024
MADE ARCHITECTURE PLLC312/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADE LLCGeneral Contractor1507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor607/08/2026
SUPER CHARGED ELEC. INC.Electrical203/22/2026
S&H PLUMBING,INCPlumbing207/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247409/18/2025
BIG APPLE GROUP NY A RMA9168312/10/2024
ABS ENGINEERING, PLLC4835310/28/2024
BIG APPLE GROUP NY, LLC1258109/13/2024
Building Lifecycle
All (93)Filed (14)Permit Issued (20)Signed Off (8)Violation (2)Inspection (7)Objection (12)Special Inspection (30)
05/29/2026
Signed off — Alteration
M00970411-I1
05/21/2026
Permit issued — Mechanical Systems
M00970411-I1-MS
02/05/2026
Permit issued — Support of Excavation
M01103910-I1-SE
12/17/2025
Signed off — Alteration
Underpinning work, WHICH IS PART OF THE PROPOSED RENOVATION OF THE EXISTING BUILDING. SUPPORT OFEXCAVATION WILL CONSIST OF:1. INSTALLING UNDERPINNING OF THE EXISTING FOUNDATIONS.2. INSTALLING TIMBERSHORED PITS FOR NEW FOOTINGS.3. PERFORrmi
M01103910-S2
12/17/2025
Signed off — Alteration
Townhouse renovation includes: lowering cellar slab, modifications to interior bearing walls, incorporation of (2) rear moment frames, mechanical accommodation at roof.
M00970328-S1
12/10/2025
Signed off — Alteration
M01146057-I1
10/28/2025
Signed off — Alteration
Townhouse renovation includes: lowering cellar slab, modifications to interior bearing walls, incorporation of (2) rear moment frames, mechanical accommodation at roof.
M00970328-I1
09/18/2025
Filed — Alteration
Townhouse renovation includes: lowering cellar slab, modifications to interior bearing walls, incorporation of (2) rear moment frames, mechanical accommodation at roof.
M00970328-P2
09/18/2025
Special inspection requirement — Structural Steel - Welding
Sunil Saigal
09/18/2025
Special inspection requirement — Subgrade Inspections
Sunil Saigal
09/18/2025
Special inspection requirement — Structural Cold-Formed Steel
Sunil Saigal
09/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Sunil Saigal
09/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Sunil Saigal
09/18/2025
Special inspection requirement — Footing and Foundation
Sunil Saigal
09/18/2025
Special inspection requirement — Final
Sunil Saigal
09/18/2025
Special inspection requirement — Structural Steel - Details
Sunil Saigal
09/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
09/18/2025
Special inspection requirement — Masonry
Sunil Saigal
09/18/2025
Special inspection requirement — Post-installed Anchors
Sunil Saigal
09/18/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Sunil Saigal
09/18/2025
Special inspection requirement — Demolition
Sunil Saigal
09/11/2025
Special inspection requirement — Footing and Foundation
Sunil Saigal
09/11/2025
Special inspection requirement — Final
Sunil Saigal
09/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Sunil Saigal
09/11/2025
Special inspection requirement — Structural Steel - Welding
Sunil Saigal
09/11/2025
Special inspection requirement — Subgrade Inspections
Sunil Saigal
09/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Sunil Saigal
09/11/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Sunil Saigal
09/11/2025
Special inspection requirement — Demolition
Sunil Saigal
09/11/2025
Special inspection requirement — Masonry
Sunil Saigal
09/11/2025
Special inspection requirement — Post-installed Anchors
Sunil Saigal
09/11/2025
Special inspection requirement — Structural Cold-Formed Steel
Sunil Saigal
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
09/11/2025
Special inspection requirement — Structural Steel - Details
Sunil Saigal
09/09/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01034452-I1
09/09/2025
Signed off — Alteration
M01034447-I1
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2025
Permit issued — Plumbing
M00970370-I1-PL
04/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2025
Permit issued — Sidewalk Shed
M01034447-I1-SH
04/07/2025
Permit issued — Supported Scaffold
M01034452-I1-SF
03/27/2025
Signed off — Alteration
Renovation of existing single family dwelling.
M00878561-I1
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/21/2025
Permit issued — General Construction
M00970328-S1-GC-CX
02/05/2025
Permit issued — Foundation
M01103910-S2-FO
02/05/2025
Permit issued — Structural
M01146057-I1-ST
02/05/2025
Permit issued — General Construction
M00970328-I1-GC
02/05/2025
Permit issued — Support of Excavation
M01103910-I1-SE
12/27/2024
Permit issued — Foundation
M01103910-S2-FO
12/23/2024
Permit issued — Support of Excavation
M01103910-I1-SE
12/23/2024
Permit issued — Structural
M01146057-I1-ST
12/10/2024
Filed — Alteration
M01146057-I1
12/04/2024
Filed — Alteration
Townhouse renovation includes: lowering cellar slab, modifications to interior bearing walls, incorporation of (2) rear moment frames, mechanical accommodation at roof.
M00970328-P1
11/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Sunil Saigal
11/26/2024
Special inspection requirement — Concrete - Cast-In-Place
Sunil Saigal
11/26/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Sunil Saigal
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMADE LLC05/21/2026
DOB NOWSupport of ExcavationPermit IssuedBARTONI CAPENTRY CORP02/05/2026
DOB NOWPlumbingPermit IssuedS&H PLUMBING,INC04/24/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC04/07/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC04/07/2025
DOB NOWGeneral ConstructionSigned-offBARTONI CAPENTRY CORP02/21/2025
DOB NOWFoundationSigned-offBARTONI CAPENTRY CORP02/05/2025
DOB NOWStructuralSigned-offBARTONI CAPENTRY CORP02/05/2025
DOB NOWGeneral ConstructionSigned-offBARTONI CAPENTRY CORP02/05/2025
DOB NOWSupport of ExcavationPermit IssuedBARTONI CAPENTRY CORP02/05/2025
DOB NOWFoundationSigned-offBARTONI CAPENTRY CORP12/27/2024
DOB NOWSupport of ExcavationPermit IssuedBARTONI CAPENTRY CORP12/23/2024
DOB NOWStructuralSigned-offBARTONI CAPENTRY CORP12/23/2024
DOB NOWFoundationSigned-offBARTONI CAPENTRY CORP11/13/2024
DOB NOWPlumbingPermit IssuedS&H PLUMBING,INC04/12/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC04/12/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC04/12/2024
DOB NOWGeneral ConstructionSigned-offBARTONI CAPENTRY CORP04/04/2024
DOB NOWGeneral ConstructionSigned-offBARTONI CAPENTRY CORP02/06/2024
DOB NOWGeneral ConstructionSigned-offBARTONI CAPENTRY CORP10/03/2023
BISOTISSUEDUPGRADE CONTR. CO. INC03/23/2007
BISEQISSUEDEVEREST SCAFFOLDING INC01/22/2007
BISOTISSUEDUPGRADE CONTR. CO. INC01/09/2007
BISEQISSUEDEVEREST SCAFFOLDING INC08/16/2006
BISEQISSUEDEVEREST SCAFFOLDING INC08/16/2006
1 project · most recent 10/28/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/28/2024Permit IssuedS&H PLUMBING,INCGas, Storm, Water/Sanitary
4 projects · most recent 04/24/2024
General Wiring
FiledStatusContractorScope
04/24/2024CompleteBOROWIDE ELECT'L CONTR'S—
01/30/2024CompleteSUPER CHARGED ELEC. INC.General Wiring
12/05/2023CompleteSUPER CHARGED ELEC. INC.—
10/16/2023CompleteSUPER CHARGED ELEC. INC.—
1 project · most recent 09/13/2024
FiledStatusContractorScope
09/13/2024Permit IssuedMADE LLC1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/18/2025Structural Steel - WeldingSunil Saigalspecial
09/18/2025Subgrade InspectionsSunil Saigalspecial
09/18/2025Structural Cold-Formed SteelSunil Saigalspecial
09/18/2025Structural Steel - High Strength BoltingSunil Saigalspecial
09/18/2025Concrete - Cast-In-PlaceSunil Saigalspecial
09/18/2025Footing and FoundationSunil Saigalprogress
09/18/2025FinalSunil Saigalprogress
09/18/2025Structural Steel - DetailsSunil Saigalspecial
09/18/2025Structural Stability – Alterations of existing buildingsSunil Saigalspecial
09/18/2025MasonrySunil Saigalspecial
09/18/2025Post-installed AnchorsSunil Saigalspecial
09/18/2025Construction Operations Influencing Adjacent StructuresSunil Saigalspecial
09/18/2025DemolitionSunil Saigalspecial
09/11/2025Footing and FoundationSunil Saigalprogress
09/11/2025FinalSunil Saigalprogress
09/11/2025Structural Steel - High Strength BoltingSunil Saigalspecial
09/11/2025Structural Steel - WeldingSunil Saigalspecial
09/11/2025Subgrade InspectionsSunil Saigalspecial
09/11/2025Concrete - Cast-In-PlaceSunil Saigalspecial
09/11/2025Construction Operations Influencing Adjacent StructuresSunil Saigalspecial
09/11/2025DemolitionSunil Saigalspecial
09/11/2025MasonrySunil Saigalspecial
09/11/2025Post-installed AnchorsSunil Saigalspecial
09/11/2025Structural Cold-Formed SteelSunil Saigalspecial
09/11/2025Structural Stability – Alterations of existing buildingsSunil Saigalspecial
Latest 25 of 50.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/30/2026M00878561-P1Request digital key ↗
08/30/2026M00878561-I1Request digital key ↗
08/28/2026M00970411-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit12
08/15/2026M00970370-I1Open ↗
08/13/2026M01103910-S2Open ↗
08/13/2026M00970370-P1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/30/2026M00878561-P1Open ↗
08/30/2026M00878561-I1Open ↗
08/28/2026M00970411-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/29/2026M00970328-S1Open ↗
09/29/2026M00970328-S1Open ↗
09/15/2026M00970370-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026M00970328-S1Open ↗
08/29/2026M01103910-S2Open ↗
08/28/2026M00970328-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/30/2026M00878561-I1Open ↗
08/28/2026M00970411-I1Open ↗
08/26/2026M01103910-S2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026M01103910-S2Open ↗
08/13/2026M01103910-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00878561-P1Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building6
08/15/2026M00970370-I1Open ↗
08/13/2026M00970370-P1Open ↗
08/13/2026M00878561-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01103910-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026M00878561-I1Open ↗