One family attached or semi-detached
36 BEEKMAN CIRCLE
STATEN ISLAND · Arden Heights-Rossville · BIN 5078266
💬 Discuss this project
1975Year Built
2Stories
A5Building Class
R3-2Zoning
1,740 sfGross Floor Area
1Units
One family attached or semi-detached · 4,262 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/12/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/20/2025
Permit issued — Solar
S01263218-I1-SL
08/12/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01263218-I1
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/29/2025
Special inspection requirement — Final
Walid Abdulla
07/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/20/2025
BISOTISSUEDSUNRUN INSTALLATION SVC04/02/2018
2 projects · most recent 08/12/2025
FiledStatusContractorScope
08/12/2025CompleteSUNRUN SOLAR ELECTL CORP—
05/02/2018CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/12/2025
FiledStatusContractorScope
08/12/2025Signed-offSUNRUN INSTALLATION SVC20 panels, 8.1 kw, 210 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/29/2025Energy Code Compliance InspectionsWalid Abdullaprogress
07/29/2025FinalWalid Abdullaprogress
07/29/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01263218-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/30/2018540145662Open ↗
▸BISWORK PERMIT APPLICATION1
03/30/2018540145662Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01263218-I1Open ↗
09/01/2026S01263218-I1Open ↗
09/01/2026S01263218-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01263218-I1Open ↗
09/01/2026S01263218-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/30/2018540145662Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/30/2018540145662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/30/2018540145662Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01263218-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
03/30/2018540145662Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/30/2018540145662Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01263218-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/30/2018540145662Open ↗
03/30/2018540145662Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/30/2018540145662Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
08/30/2018540145662Open ↗
▸BISNYCECC ANALYSIS1
03/30/2018540145662Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/30/2018540145662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/30/2018540145662Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/30/2018540145662Open ↗
03/30/2018540145662Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/30/2018540145662Open ↗
03/30/2018540145662Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
08/30/2018540145662Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/30/2018540145662Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01263218-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/30/2018540145662Open ↗
03/30/2018540145662Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/30/2018540145662Open ↗