← Back
STATEN ISLAND
36 DIXON AVENUE
STATEN ISLAND · Port Richmond · BIN 5175788
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
StructuralPlumbing
Floor 21p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AGP ENTERPRISES2207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT405/31/2023
A TECH ENGINEERING NYC, PLLC.111/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIP EXPEDITING403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AGP ENTERPRISES INCGeneral Contractor903/21/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324107/27/2022
Building Lifecycle
All (52)Filed (5)Permit Issued (6)Signed Off (3)Inspection (10)Objection (2)Special Inspection (26)
06/12/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S08015401-I1
06/07/2023
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-S1
06/06/2023
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-S2
06/05/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-P1
05/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/26/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
05/03/2023
Permit issued — Curb Cut
S00765879-S2-CC
05/02/2023
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-S2
04/17/2023
Permit issued — Plumbing
S08015401-I1-PL
04/11/2023
Permit issued — Structural
S00765879-I1-GC-CX
02/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/14/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/04/2022
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S08015401-I1
10/28/2022
Permit issued — Plumbing
S99093758-S1-PL
10/24/2022
Permit issued — Plumbing
S00765879-S1-PL
10/07/2022
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-S1
09/28/2022
Permit issued — Structural
S00765879-I1-GC-CX
08/30/2022
Objection raised — Scope
08/30/2022
Objection resolved — Addressed
07/27/2022
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR NEW DETATCHED ONE FAMILY RESIDENCE.
S00765879-I1
07/27/2022
Special inspection requirement — Fenestration areas
Richard Dailey
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
07/27/2022
Special inspection requirement — Subgrade Inspections
Richard Dailey
07/27/2022
Special inspection requirement — Electric vehicle service equipment requirements
Richard Dailey
07/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
07/27/2022
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
07/27/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
07/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
07/27/2022
Special inspection requirement — Structural Wood Frame
Richard Dailey
07/27/2022
Special inspection requirement — Maintenance information
Richard Dailey
07/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Richard Dailey
07/27/2022
Special inspection requirement — Air barrier — testing
Richard Dailey
07/27/2022
Special inspection requirement — Permanent certificate
Richard Dailey
07/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
07/27/2022
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
07/27/2022
Special inspection requirement — Insulation placement and R values
Richard Dailey
07/27/2022
Special inspection requirement — Protection of exposed foundation insulation
Richard Dailey
07/27/2022
Special inspection requirement — Fenestration air leakage
Richard Dailey
07/27/2022
Special inspection requirement — Ventilation and air distribution system
Richard Dailey
07/27/2022
Special inspection requirement — Interior lighting power
Richard Dailey
07/27/2022
Special inspection requirement — Duct leakage testing, insulation and design
Richard Dailey
07/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
06/28/2022
Special inspection requirement — Mechanical Systems
Richard Dailey
06/28/2022
Special inspection requirement — Footing and Foundation
Richard Dailey
06/28/2022
Special inspection requirement — Final
Richard Dailey
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAGP ENTERPRISES INC05/03/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.04/17/2023
DOB NOWStructuralPermit IssuedAGP ENTERPRISES INC04/11/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC10/28/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/24/2022
DOB NOWStructuralPermit IssuedAGP ENTERPRISES INC09/28/2022
1 project · most recent 05/31/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/31/2023Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 01/17/2023
General Wiring
FiledStatusContractorScope
01/17/2023CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 05/31/2023
Concrete Wood
FiledStatusContractorScope
05/31/2023Signed-offAGP ENTERPRISES INCConcrete, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/26/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/14/2022Pass-Final PL - UndergroundPassView ↗
11/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/27/2022Fenestration areasRichard Daileyenergy_progress
07/27/2022Fire-Resistant Penetrations and JointsRichard Daileyspecial
07/27/2022Subgrade InspectionsRichard Daileyspecial
07/27/2022Electric vehicle service equipment requirementsRichard Daileyenergy_progress
07/27/2022Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
07/27/2022Concrete - Cast-In-PlaceRichard Daileyspecial
07/27/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/27/2022Energy Code Compliance InspectionsRichard Daileyprogress
07/27/2022Fire-Resistance Rated ConstructionRichard Daileyprogress
07/27/2022Structural Wood FrameRichard Daileyprogress
07/27/2022Maintenance informationRichard Daileyenergy_progress
07/27/2022HVAC-R and service water heating system controlsRichard Daileyenergy_progress
07/27/2022Air barrier — testing Richard Daileyenergy_progress
07/27/2022Permanent certificateRichard Daileyenergy_progress
07/27/2022HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
07/27/2022Air barrier - visual inspectionRichard Daileyenergy_progress
07/27/2022Insulation placement and R valuesRichard Daileyenergy_progress
07/27/2022Protection of exposed foundation insulationRichard Daileyenergy_progress
07/27/2022Fenestration air leakageRichard Daileyenergy_progress
07/27/2022Ventilation and air distribution systemRichard Daileyenergy_progress
07/27/2022Interior lighting powerRichard Daileyenergy_progress
07/27/2022Duct leakage testing, insulation and designRichard Daileyenergy_progress
07/27/2022HVAC-R and service water heating equipmentRichard Daileyenergy_progress
06/28/2022Mechanical SystemsRichard Daileyspecial
06/28/2022Footing and FoundationRichard Daileyprogress
Latest 25 of 26.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S08015401-I1Request digital key ↗
08/23/2026S00765879-P1Request digital key ↗
08/23/2026S00765879-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
09/16/2022540233086Open ↗
07/28/2022540233086Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/28/2022540233086Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/16/2022540233086Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00765879-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00765879-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00765879-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00765879-S1Open ↗
08/13/2026S00765879-P1Open ↗
08/13/2026S00765879-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00765879-I1Open ↗
08/28/2026S00765879-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00765879-I1Open ↗
08/28/2026S00765879-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/28/2022540233086Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/28/2022540233086Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00765879-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00765879-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00765879-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00765879-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00765879-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00765879-I1Open ↗
▸Inspections & Test Reports5
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/28/2022540233086Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/28/2022540233086Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00765879-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00765879-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00765879-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/16/2022540233086Open ↗
07/28/2022540233086Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/28/2022540233086Open ↗
▸Other Documents9
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/28/2022540233086Open ↗
▸BISWAIVER OF 7FT CLEARANCE TO POLE AND TREE1
09/16/2022540233086Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
09/16/2022540233086Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/28/2022540233086Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00765879-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00765879-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00765879-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00765879-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00765879-I1Open ↗