DOB09/14/2026CORRECTIVE ACTION PLAN REQ'D-OBSVD ON EXP1 MULT VER MASONRY HAIRLINE CRACKING IN VARIOUS LOCATIONS AROUND WINDOW OPENINGS. SPALLING STUCCO ABOVE BSMT WINDOW OPENINGS. THE TOP LANDING/STEP ABOVE BSMT ENTRANCE EXHIBITS CRACKING. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG SUBMIT A CORRECTIVE ACTION PLAN
Three families · 2,500 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.