← Back
One family attached or semi-detached
36 MOUNTVIEW AVENUE
STATEN ISLAND · BIN 5175744
💬 Discuss this project
2021Year Built
2Stories
A5Building Class
R3-1Zoning
1,160 sfGross Floor Area
1Units
One family attached or semi-detached · 2,177 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Floor 21p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
34 MOUNTAINVIEW1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS602/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P DESIGN CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAE DEVELOPMENT CORPGeneral Contractor307/08/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
M. EARLY PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324502/06/2023
A TECH ENGINEERING NYC, P6738201/27/2023
Building Lifecycle
All (46)Filed (6)Permit Issued (3)Signed Off (2)Inspection (5)Special Inspection (30)
12/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/08/2023
Signed off — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743069-I1
S00743087-I1
03/08/2023
Signed off — Alteration
S00743099-I1
03/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/09/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
02/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/09/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
02/09/2023
Special inspection requirement — Heating Systems
Richard Dailey
02/09/2023
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
02/09/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
02/09/2023
Special inspection requirement — Mechanical Systems
Richard Dailey
02/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
02/09/2023
Special inspection requirement — Final
Richard Dailey
02/09/2023
Special inspection requirement — Footing and Foundation
Richard Dailey
02/09/2023
Special inspection requirement — Structural Wood Frame
Richard Dailey
02/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
02/09/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
02/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Richard Dailey
02/09/2023
Special inspection requirement — Maintenance information
Richard Dailey
02/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
02/09/2023
Special inspection requirement — Fenestration areas
Richard Dailey
02/09/2023
Special inspection requirement — Lighting in dwelling units
Richard Dailey
02/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
02/09/2023
Special inspection requirement — Permanent certificate
Richard Dailey
02/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
02/09/2023
Special inspection requirement — Air barrier — testing
Richard Dailey
02/09/2023
Special inspection requirement — Fenestration air leakage
Richard Dailey
02/09/2023
Special inspection requirement — Shutoff dampers
Richard Dailey
02/06/2023
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story building total )- one (1) family - semi-attached home with two (2) on-site parking spaces
S00743069-P3
02/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
02/02/2023
Special inspection requirement — Shutoff dampers
Richard Dailey
02/02/2023
Special inspection requirement — Lighting in dwelling units
Richard Dailey
02/02/2023
Special inspection requirement — Fenestration areas
Richard Dailey
02/02/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
01/27/2023
Filed — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743069-I1
S00743087-P1
01/03/2023
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story building total )- one (1) family - semi-attached home with two (2) on-site parking spaces
S00743069-P1
12/05/2022
Permit issued — Curb Cut
S00743099-I1-CC
11/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/19/2022
Permit issued — Foundation
S00743069-I1-GC-CX
07/19/2022
Permit issued — Plumbing
S00743087-I1-PL
07/07/2022
Filed — New Building
application filed to construct a basement and two (2) story frame ( 3 story building total )- one (1) family - semi-attached home with two (2) on-site parking spaces
S00743069-I1
07/05/2022
Filed — Alteration
application filed to install plumbing / gas fired fixtures and sprinklers in conjunction with new building application # S00743069-I1
S00743087-I1
06/02/2022
Filed — Alteration
S00743099-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDAE DEVELOPMENT CORP12/05/2022
DOB NOWFoundationPermit IssuedDAE DEVELOPMENT CORP08/19/2022
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP07/19/2022
BISOTISSUEDSUNRUN INSTALLATION SVC11/13/2023
1 job · most recent 02/06/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/06/2023Permit IssuedDAE DEVELOPMENT CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem GSX130481BH / Rheem RCF4821STAMCA 58,000 BTU · Condensing Unit ×1
- - / Rheem RCF4821STAMCA 58,000 BTU · Condensing Unit ×1
Heating
Rheem R802TA100521MSA 64,000 BTU · Condensing Unit ×1
Model No. R802TA100521MSA 64,000 BTU · Condensing Unit ×1
Ventilation
Broan B130E65RT 115 CFM · Erv ×1
Renewaire EV PREMIUM S 115 CFM · Erv ×1
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×2
2 jobs · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023CompleteSUNRUN SOLAR ELECTL CORP—
09/23/2022CompleteMANGI ELECTRICAL CORPGeneral Wiring
1 job · most recent 02/06/2023
Wood
FiledStatusContractorScope
02/06/2023Permit IssuedDAE DEVELOPMENT CORPWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
02/09/2023Air barrier - visual inspectionRichard Daileyenergy_progress
02/09/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
02/09/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/09/2023Subgrade InspectionsRichard Daileyspecial
02/09/2023Heating SystemsRichard Daileyspecial
02/09/2023Concrete - Cast-In-PlaceRichard Daileyspecial
02/09/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
02/09/2023Mechanical SystemsRichard Daileyspecial
02/09/2023Energy Code Compliance InspectionsRichard Daileyprogress
02/09/2023FinalRichard Daileyprogress
02/09/2023Footing and FoundationRichard Daileyprogress
02/09/2023Structural Wood FrameRichard Daileyprogress
02/09/2023Fire-Resistance Rated ConstructionRichard Daileyprogress
02/09/2023Insulation placement and R valuesRichard Daileyenergy_progress
02/09/2023HVAC-R and service water heating system controlsRichard Daileyenergy_progress
02/09/2023Maintenance informationRichard Daileyenergy_progress
02/09/2023HVAC-R and service water heating equipmentRichard Daileyenergy_progress
02/09/2023Fenestration areasRichard Daileyenergy_progress
02/09/2023Lighting in dwelling unitsRichard Daileyenergy_progress
02/09/2023Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
02/09/2023Permanent certificateRichard Daileyenergy_progress
02/09/2023HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
02/09/2023Air barrier — testing Richard Daileyenergy_progress
02/09/2023Fenestration air leakageRichard Daileyenergy_progress
02/09/2023Shutoff dampersRichard Daileyenergy_progress
Latest 25 of 56.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00743099-I1Request digital key ↗
08/23/2026S00743087-I1Request digital key ↗
08/23/2026S00743087-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/10/2023540261740Open ↗
▸BISWORK PERMIT APPLICATION1
11/13/2023540261740Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00743069-P1Open ↗
08/13/2026S00743069-I1Open ↗
08/13/2026S00743069-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00743069-P3Open ↗
08/13/2026S00743069-P1Open ↗
08/13/2026S00743069-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00743069-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026S00743069-P3Open ↗
09/02/2026S00743069-P3Open ↗
09/02/2026S00743069-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00743099-I1Open ↗
08/23/2026S00743087-P1Open ↗
08/23/2026S00743087-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S00743069-P3Open ↗
09/02/2026S00743069-P3Open ↗
09/02/2026S00743069-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/10/2023540261740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/10/2023540261740Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/10/2023540261740Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00743069-I1Open ↗
08/13/2026S00743069-P3Open ↗
08/13/2026S00743069-P1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/13/2026S00743069-P1Open ↗
08/13/2026S00743069-P3Open ↗
08/13/2026S00743069-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/13/2023540261740Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00743069-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00743069-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00743069-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/22/2024540261740Open ↗
11/10/2023540261740Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/27/2024540261740Open ↗
▸BISNYCECC ANALYSIS1
11/10/2023540261740Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/10/2023540261740Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/22/2024540261740Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/10/2023540261740Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00743069-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT5
08/13/2026S00743069-I1Open ↗
08/13/2026S00743069-P1Open ↗
08/13/2026S00743087-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/22/2024540261740Open ↗
11/10/2023540261740Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00743069-I1Open ↗
08/13/2026S00743087-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00743069-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/27/2024540261740Open ↗
02/27/2024540261740Open ↗
11/10/2023540261740Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/27/2024540261740Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/22/2024540261740Open ↗
11/10/2023540261740Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/10/2023540261740Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2023540261740Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00743069-P3Open ↗
08/13/2026S00743069-P1Open ↗
08/13/2026S00743069-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00743069-I1Open ↗
08/13/2026S00743069-P1Open ↗
08/13/2026S00743069-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026S00743069-P3Open ↗
08/23/2026S00743069-I1Open ↗
08/23/2026S00743069-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00743069-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00743069-I1Open ↗