DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/29/2021UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER(FAILURETO COMPLY WITH SWO-COMP#518713)NOTE AT THE TIME OF INSPECTION,I OBSERVED THAT CONSTRUCTION WORK WAS CONTINUED WHILE A NOTICE OF A STOP WORK$25K due
Two stories - detached, small or mid-size · 2,912 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.