← Back
BuildNYC
Two stories - detached, small or mid-size
36 SOUTH AVENUE
STATEN ISLAND · BIN 5028399
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3XZoning
1,176 sfGross Floor Area
1Units
3 Active Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 36 South Ave · 7,500 sf lot · 0.16 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 2 filings · 20 docs
Floor 1Utility pole and sign installationUnder Construction10p · 4 filings · 20 docs
CellarUnder Construction9p · 2 filings · 20 docs
Site & exteriorConstruction fence signage2p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Deruvo & Associates Architects1009/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Michael Deruvo & Associates Architects1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Four Bridges ConstructionGeneral Contractor711/08/2026
Four Bridges ConstructionScaffold407/08/2026
K.M.D. Mechanical 1443Plumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738309/28/2026
Building Lifecycle
11/04/2026
Permit renewed — General Construction
Renewed without changes
S01046525-I1-GC
09/28/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT ONE FAMILY RESIDENCE WITH CELLAR TO A TWO FAMILY RESIDENCE. PARTIAL FOUNDATION TO REMAIN, HORIZONTAL AND VERTICAL ADDITION AS PER PLANS.
S01046525-P2
07/14/2026
Illegal use in a residential district. Noted at rear of driveway: (1) bobcat heavy construction equipment vehicle & (1) black dumpster stored with…
ECB violation · open
07/14/2026
Fence exceeds permitted height. Noted at driveway: fence is approx 6' in height in violation of the 4' max height requirement., conform fence to…
ECB violation · open
06/05/2026
Permit renewed — General Construction
Renewed without changes
S01046525-I1-GC
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFour Bridges Construction11/04/2026
DOB NOWGeneral ConstructionPermit IssuedFour Bridges Construction06/05/2026
DOB NOWGeneral ConstructionPermit IssuedFour Bridges Construction12/19/2025
DOB NOWConstruction FenceSigned-offFour Bridges Construction05/07/2025
DOB NOWPlumbingPermit IssuedK.M.D. Mechanical 144302/28/2025
DOB NOWGeneral ConstructionPermit IssuedFour Bridges Construction12/20/2024
DOB NOWConstruction FenceSigned-offFour Bridges Construction12/04/2024
DOB NOWEarth WorkPermit IssuedFour Bridges Construction12/04/2024
1 project · most recent 07/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/10/2025Permit IssuedK.M.D. Mechanical 1443Gas, Water/Sanitary
2 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026CompleteAll Pro Electric of N.YGeneral Wiring
03/08/2025Permit IssuedLaser Lite Elect'lGeneral Wiring
1 project · most recent 04/24/2024
FiledStatusContractorScope
04/24/2024Permit IssuedFour Bridges Construction—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/20/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
03/04/2026Maintenance informationMICHAEL DERUVOenergy_progress
03/04/2026Permanent certificateMICHAEL DERUVOenergy_progress
03/04/2026Air barrier - visual inspectionMICHAEL DERUVOenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsMICHAEL DERUVOenergy_progress
03/04/2026Electric vehicle service equipment requirementsMICHAEL DERUVOenergy_progress
03/04/2026Air barrier — testing MICHAEL DERUVOenergy_progress
03/04/2026Fenestration air leakageMICHAEL DERUVOenergy_progress
03/04/2026MeteringMICHAEL DERUVOenergy_progress
03/04/2026Fenestration areasMICHAEL DERUVOenergy_progress
03/04/2026Insulation placement and R valuesMICHAEL DERUVOenergy_progress
03/04/2026Interior lighting powerMICHAEL DERUVOenergy_progress
03/04/2026PreliminaryMICHAEL DERUVOprogress
03/04/2026Fire-Resistance Rated ConstructionMICHAEL DERUVOprogress
03/04/2026Subsurface Investigations (Borings/Test Pits)MICHAEL DERUVOspecial
03/04/2026Subgrade Inspectionsanthony santorospecial
03/04/2026Structural Stability – Alterations of existing buildingsanthony santorospecial
03/04/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
08/19/2025Fenestration areasMICHAEL DERUVOenergy_progress
08/19/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
08/19/2025Subsurface Investigations (Borings/Test Pits)MICHAEL DERUVOspecial
08/19/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
08/19/2025Subgrade Inspectionsanthony santorospecial
08/19/2025Fire-Resistance Rated ConstructionMICHAEL DERUVOprogress
08/19/2025PreliminaryMICHAEL DERUVOprogress
08/19/2025Insulation placement and R valuesMICHAEL DERUVOenergy_progress
Latest 25 of 53.
99 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account