← Back
Office only, 2-6 stories
36 TAAFFE PLACE
BROOKLYN · BIN 3054187
💬 Discuss this project
1930Year Built
5Stories
O2Building Class
M1-2Zoning
29,982 sfGross Floor Area
10Units
0 Open ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: VEE HOLDING LLC · 5,666 sf lot · 5.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof44p · 1 filing · 20 docs
Floor 448p · 1 filing · 20 docs
Floor 346p · 1 filing · 20 docs
Floor 248p · 1 filing · 20 docs
Floor 148p · 1 filing · 20 docs
Mezzanine45p · 1 filing · 20 docs
Cellar48p · 1 filing · 20 docs
1 job · most recent 10/09/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/09/2024Signed-offCDF CUSTOM BUILDERS INCAir Conditioning Systems, Heating Systems
Cooling
Daikin DAIKIN- REYQ120AATJA 120,000 BTU · Vrf Outdoor ×4
DAIKIN - REYG144AATJA 144,000 BTU · Vrf Outdoor ×3
DAIKIN - REYQ168AATJA- REYQ168XATJB 168,000 BTU · Vrf Outdoor ×2
DAIKIN-RKS12LVJU DAIKIN - RK12AXVJU DAIKIN - RXSQ24TBVJUA DAKIN- RXTQ36TBVJUA 12,000 BTU · Heat Pump Outdoor ×1
Heating
Daikin DAIKIN- REYQ120AATJA 135,000 BTU · Vrf Outdoor ×4
DAIKIN - REYG144AATJA 160,000 BTU · Vrf Outdoor ×3
DAIKIN - REYQ168AATJA- REYQ168XATJB 188,000 BTU · Vrf Outdoor ×2
1 job · most recent 10/09/2024
Sprinkler System
FiledStatusContractorScope
10/09/2024Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 job · most recent 10/09/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/09/2024Signed-offHORBRIDGE PLUMBING & HEATGas, Storm, Water/Sanitary
4 jobs · most recent 03/26/2024
General Wiring
FiledStatusContractorScope
03/26/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/28/2023CompleteCAPUTEK ELEC'L SERVICES,—
03/03/2023CompleteRICHARD NEU—
01/05/2023CompletePOWER DIRECT ELECTRIC INC—
1 job · most recent 10/09/2024
Steel Concrete
FiledStatusContractorScope
10/09/2024Signed-offCDF CUSTOM BUILDERS INCSteel, Concrete
1 job · most recent 10/09/2024
Earthwork
FiledStatusContractorScope
10/09/2024Signed-offCDF CUSTOM BUILDERS INCEarthwork
Building Lifecycle
All (151)Filed (22)Permit Issued (13)Signed Off (7)Violation (3)Inspection (13)Objection (63)Special Inspection (30)
10/17/2024
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/17/2024
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/17/2024
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
10/17/2024
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/17/2024
Special inspection requirement — Seismic Isolation Systems
Shahrish Shuvo
10/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
10/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
10/17/2024
Special inspection requirement — Vestibules
Shahrish Shuvo
10/17/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/17/2024
Special inspection requirement — Luminous Exit Path Markings
Shahrish Shuvo
10/17/2024
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/17/2024
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
10/17/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Shahrish Shuvo
10/17/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/17/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/17/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/17/2024
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/11/2024
Objection raised — Other
10/11/2024
Objection resolved — Addressed
10/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Filed — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-A4
10/08/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Shahrish Shuvo
10/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/08/2024
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
10/08/2024
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
10/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
10/08/2024
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/08/2024
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
09/19/2024
Filed — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-A2
07/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2024
Signed off — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-S2
04/17/2024
Objection raised — Scope
04/17/2024
Objection resolved — Addressed
04/09/2024
Filed — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-A1
04/01/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/01/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2024
Signed off — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-S1
12/14/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/22/2023
Signed off — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-S5
11/22/2023
Signed off — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-S4
11/15/2023
Filed — Alteration CO
PLUMBING / SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO ALT 1 # B00502755-I1.
B00502755-P9
11/09/2023
Signed off — Alteration
B00542270-I1
10/31/2023
Signed off — Alteration
B00831658-I1
10/25/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00866098-I1
10/24/2023
Permit issued — Mechanical Systems
B00502755-S1-MS
09/20/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00866098-P2
09/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/14/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Permit issued — General Construction
B00502755-I1-GC
Latest 60 of 151 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS1303/22/2026
VEE HOLDING LLC103/22/2026
CDF CUSTOM BUILDERS303/22/2026
JLS HOLDINGS603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.1310/09/2024
CHOSEN MEP, CORP.404/09/2024
ASHRAF CORP409/20/2023
WALTER HOLLIEN ARCHITECT106/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1003/21/2026
ELLIPSES DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDF CUSTOM BUILDERS INCGeneral Contractor2207/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor603/21/2026
GLADMORE MWANDIAMBIRAElectrical403/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
CAPUTEK ELEC'L SERVICES,Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681610/09/2024
SHAHRISH SHUVO ENGINEERIN8524510/09/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCDF CUSTOM BUILDERS INC10/24/2023
DOB NOWGeneral ConstructionPermit IssuedCDF CUSTOM BUILDERS INC08/29/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP08/28/2023
DOB NOWSprinklersSigned-offHORBRIDGE PLUMBING & HEAT04/26/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/02/2023
DOB NOWConstruction FenceSigned-offCDF CUSTOM BUILDERS INC11/23/2022
DOB NOWStructuralSigned-offCDF CUSTOM BUILDERS INC10/31/2022
DOB NOWFoundationSigned-offCDF CUSTOM BUILDERS INC10/31/2022
DOB NOWGeneral ConstructionPermit IssuedCDF CUSTOM BUILDERS INC09/01/2022
DOB NOWGeneral ConstructionPermit IssuedCDF CUSTOM BUILDERS INC08/22/2022
DOB NOWEarth WorkSigned-offCDF CUSTOM BUILDERS INC01/06/2022
DOB NOWStructuralSigned-offCDF CUSTOM BUILDERS INC01/06/2022
DOB NOWGeneral ConstructionPermit IssuedCDF CUSTOM BUILDERS INC01/05/2022
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/17/2024Concrete - Cast-In-PlaceShahrish Shuvospecial
10/17/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/17/2024Maintenance informationShahrish Shuvoenergy_progress
10/17/2024Exterior lighting powerShahrish Shuvoenergy_progress
10/17/2024Fenestration air leakageShahrish Shuvoenergy_progress
10/17/2024Interior lighting powerShahrish Shuvoenergy_progress
10/17/2024Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/17/2024VestibulesShahrish Shuvoenergy_progress
10/17/2024Insulation placement and R valuesShahrish Shuvoenergy_progress
10/17/2024Protection of exposed foundation insulationShahrish Shuvoenergy_progress
10/17/2024HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
10/17/2024Lighting controlsShahrish Shuvoenergy_progress
10/17/2024Fenestration areasShahrish Shuvoenergy_progress
10/17/2024Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/17/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
10/17/2024Seismic Isolation SystemsShahrish Shuvospecial
10/17/2024Sprayed fire-resistant materialsShahrish Shuvospecial
10/17/2024Luminous Exit Path MarkingsShahrish Shuvospecial
10/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
10/17/2024Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
10/17/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/08/2024Fenestration areasShahrish Shuvoenergy_progress
10/08/2024Concrete - Cast-In-PlaceShahrish Shuvospecial
10/08/2024Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
10/08/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
Latest 25 of 150.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00542270-I1Request digital key ↗
08/27/2026B00831658-I1Request digital key ↗
08/27/2026B00866098-P2Request digital key ↗
Showing 3 of 22 on file for this type
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00502755-A2Open ↗
08/13/2026B00502755-A4Open ↗
08/13/2026B00502755-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00502755-I1Open ↗
08/13/2026B00502755-A4Open ↗
08/13/2026B00502755-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00502755-A2Open ↗
08/13/2026B00502755-I1Open ↗
08/13/2026B00502755-A4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00502755-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026B00502755-S2Open ↗
09/23/2026B00502755-S2Open ↗
09/01/2026B00502755-P7Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00542270-I1Open ↗
08/27/2026B00831658-I1Open ↗
08/27/2026B00866098-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00502755-S2Open ↗
09/23/2026B00502755-S2Open ↗
09/01/2026B00502755-P7Open ↗
Showing 3 of 22 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00502755-A2Open ↗
08/13/2026B00502755-A4Open ↗
08/13/2026B00502755-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/13/2026B00502755-A4Open ↗
08/13/2026B00502755-P7Open ↗
08/13/2026B00502755-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00502755-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00502755-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00502755-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/13/2026B00502755-P7Open ↗
08/13/2026B00502755-P4Open ↗
08/13/2026B00502755-S4Open ↗
Showing 3 of 17 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00502755-S2Open ↗
08/13/2026B00502755-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00502755-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00502755-I1Open ↗
▸Other Documents29
▸DOB NOWPlot Diagram11
08/13/2026B00502755-S4Open ↗
08/13/2026B00502755-P8Open ↗
08/13/2026B00502755-A2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00502755-A4Open ↗
08/13/2026B00502755-I1Open ↗
08/13/2026B00502755-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00502755-P8Open ↗
08/13/2026B00502755-A2Open ↗
08/13/2026B00502755-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026B00502755-P4Open ↗
08/13/2026B00502755-P5Open ↗
08/13/2026B00502755-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00502755-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00502755-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00502755-S4Open ↗