Elevator apt, luxury type
36 UNION SQUARE
MANHATTAN · BIN 1017819
💬 Discuss this project
1963Year Built
7Stories
D8Building Class
C6-4Zoning
65,430 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, luxury type · Owner of record: 101 EAST 16TH REALTYLLC · 15,625 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 11p · 1 filing · 5 docs
Cellar3p · 2 filings · 14 docs
Sub-CellarUnder Construction3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROTNER MANAGEMENT1107/08/2026
SHAH GROUP ENTERPRISES IN303/22/2026
101 EAST 16TH REALTYLLC103/22/2026
101 EAST 16TH STREET REALTY1503/22/2026
TO THE OWNER OF 38 UNION103/22/2026
101 EAST 16 REALTY LLC203/21/2026
101 E 16TH REALTY503/21/2026
CHAMPION PARKING203/21/2026
101 E. 16TH STREET REALTY, LLC1303/21/2026
101 EAST 1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM PROFESSIONALS203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
WEST AZE203/21/2026
THE GREEN STUDIO103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
W J PROFESSIONAL EXPEDITING COMPANY203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RESTORATION CORPGeneral Contractor704/09/2026
SHAH GROUP ENTERPRISES INGeneral Contractor303/21/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
ACE CHIMNEY & FIREPLACEGeneral Contractor203/21/2026
RADOSLAW KUCHARSKIElectrical103/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
THOMAS JOCELYN IIIElectrical103/21/2026
VITALE ERICElectrical103/21/2026
ERIC VITALEElectrical103/21/2026
N Y SIGN ARTScaffold107/08/2026
HOWARD ZAMKOFFElectrical103/21/2026
LACOR MECHANICAL SYSTEMSElectrical103/21/2026
MARCELLE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE ORDERING FORCE9406210/15/2025
GEIGER ENGINEERING. PC689203/31/2025
BAZINI ENGINEERING, P.C.1808107/25/2023
PCMARCHITECTS PLLC2812110/10/2019
Building Lifecycle
All (86)Filed (9)Permit Issued (8)Signed Off (4)Facade (FISP) (12)Violation (35)Inspection (5)Special Inspection (13)
08/12/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/31/2026
Signed off — Alteration
LIMITED GARAGE REPAIRS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY
M01202195-I1
01/29/2026
Permit issued — Plumbing
M00753144-I1-PL
10/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Khaled Mohamed
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
10/16/2025
Special inspection requirement — Post-installed Anchors
Khaled Mohamed
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
ELISHA GEIGER
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Khaled Mohamed
10/16/2025
Special inspection requirement — Final
Khaled Mohamed
10/15/2025
Filed — Alteration
LIMITED GARAGE REPAIRS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY
M01202195-P1
10/07/2025
Special inspection requirement — Final
Khaled Mohamed
10/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/07/2025
Special inspection requirement — Concrete - Cast-In-Place
Khaled Mohamed
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Khaled Mohamed
10/07/2025
Special inspection requirement — Post-installed Anchors
Khaled Mohamed
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Khaled Mohamed
06/12/2025
Violation issued (HPD, closed)
A
04/04/2025
Permit issued — General Construction
M01202195-I1-GC
03/31/2025
Filed — Alteration
LIMITED GARAGE REPAIRS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY
M01202195-I1
01/24/2025
Signed off — Alteration
M01030482-I1
09/24/2024
Violation issued (ECB, open)
Construction
08/30/2024
Cycle 9 facade report submitted
08/23/2024
Cycle 9 facade inspection completed
07/31/2024
Cycle 9 facade report signed — SWARMP
04/19/2024
Permit issued — General Construction
M01030482-I1-GC
04/11/2024
Filed — Alteration
M01030482-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/06/2024
Permit issued — Sidewalk Shed
M01000952-I1-SH
02/05/2024
Filed — Alteration
M01000952-I1
11/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/08/2023
Signed off — Alteration
M00905324-I1
07/31/2023
Permit issued — Mechanical Systems
M00905324-I1-MS
07/25/2023
Filed — Alteration
M00905324-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SING WORDING: PETITE OPTIQUE
M00808530-I1
01/11/2023
Permit issued — Sign
M00808530-I1-SG
01/09/2023
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SING WORDING: PETITE OPTIQUE
M00808530-I1
01/06/2023
Special inspection requirement — Final
DAMIR RAHMAN
10/07/2022
Permit issued — Plumbing
M00753144-I1-PL
08/25/2022
Filed — Alteration
M00753144-I1
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2019
Filed — Alteration
PLUMBING WORK FIELD IN CONJUNCTION WITH INTERIOR RENOVATION #1017819. NO CHANGES TO USE, EGRESS AND OCCUPANCY.
M00225341-I1
12/18/2018
Cycle 8 facade report submitted
12/17/2018
Cycle 8 facade report signed — SWARMP
10/31/2018
Cycle 8 facade inspection completed
10/03/2018
Permit issued — Sidewalk Shed
M00083777-I1-SH
10/01/2018
Filed — Alteration
M00083777-I1
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/16/2015
Violation issued (HPD, closed)
I
08/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2015
Violation issued (HPD, closed)
B
01/06/2015
Violation issued (HPD, closed)
B
01/06/2015
Violation issued (HPD, closed)
A
01/06/2015
Violation issued (HPD, closed)
B
12/13/2014
Violation issued (ECB, closed)
Unknown
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH01/29/2026
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP04/04/2025
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP04/19/2024
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP02/06/2024
DOB NOWMechanical SystemsSigned-offACE CHIMNEY FIREPLACE07/31/2023
DOB NOWSignSigned-offSKANSKA BUILDING INC01/11/2023
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH10/07/2022
DOB NOWSidewalk ShedPermit IssuedSHAH GROUP ENTERPRISES IN10/03/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC07/22/2020
BISOTISSUEDLIME-LIGHT CONSTRUCTION C08/07/2018
BISEQISSUEDALL-SAFE LLC04/14/2017
BISOTISSUEDPRO-REMODELING NYC INC10/06/2016
BISOTISSUEDPRO-REMODELING NYC INC09/26/2016
BISEQISSUEDPRO-REMODELING NYC INC09/26/2016
BISFPISSUEDMEGA FIRE PROTECTION INC10/29/2014
BISPLISSUEDDOVAL PLBG & HTG CORP10/03/2014
BISPLISSUEDFLYTIGER P & H LTD09/22/2014
BISMHISSUEDSIA INTERNATIONAL CORP08/15/2014
BISEQISSUEDSIA INTERNATIONAL CORP08/15/2014
BISOTISSUEDSIA INTERNATIONAL CORP07/22/2014
BISOTISSUEDVLAD RESTORATION LTD06/19/2012
BISEQISSUEDVLAD RESTORATION LTD06/19/2012
BISOTISSUEDPARK PLUS, INC09/07/2011
BISPLISSUEDL & N PLUMBING, INC12/09/2009
BIS—ISSUEDNEW YORK SIGN CONTRACTOR12/01/2009
BISOTISSUEDNEW YORK SIGN CONTRACTORS12/01/2009
BISFPISSUEDUNIQUE FIRE SYSTEMS INC10/23/2009
BISMHISSUEDBF CONSTRUCTION SRV.GROUP08/12/2009
BISPLISSUEDWASOFF PLBG & UTILITY CO07/29/2009
BISMHISSUEDBF CONSTRUCTION SRV.GROUP07/27/2009
BISEQISSUEDBF CONSTRUCTION SRV.GROUP07/27/2009
BISOTISSUEDBF CONSTRUCTION SRV.GROUP07/27/2009
BISOTISSUEDSTYLES CONSTRUCTION CORP07/22/2009
BISOTISSUEDMICHELLE KUO CORP07/02/2009
BISEQISSUEDMICHELLE KUO CORP07/02/2009
BIS—ISSUEDNEW YORK SIGN CONTRACTOR02/09/2007
BISFPISSUEDRELIABLE FIRE PROTECTION01/05/2007
BISPLISSUEDL & N PLUMBING, INC11/29/2006
BISMHISSUEDD & B CONTRACTOR CORP11/29/2006
BISOTISSUEDD & B CONTRACTOR CORP11/28/2006
+ 15 more permits on file
4 projects · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteRAAM ELECTRICAL LLCGeneral Wiring
01/06/2023Permit IssuedALL PRO ELEC. OF N.Y. INC—
09/29/2018Permit IssuedRICHARD NEU—
08/17/2018CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/12/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/16/2025Concrete - Cast-In-PlaceKhaled Mohamedspecial
10/16/2025Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
10/16/2025Post-installed AnchorsKhaled Mohamedspecial
10/16/2025Tenant Protection Plan ComplianceELISHA GEIGERspecial
10/16/2025Structural Stability – Alterations of existing buildingsKhaled Mohamedspecial
10/16/2025FinalKhaled Mohamedprogress
10/07/2025FinalKhaled Mohamedprogress
10/07/2025Tenant Protection Plan Compliance—special
10/07/2025Concrete - Cast-In-PlaceKhaled Mohamedspecial
10/07/2025Fire-Resistant Penetrations and JointsKhaled Mohamedspecial
10/07/2025Post-installed AnchorsKhaled Mohamedspecial
10/07/2025Structural Stability – Alterations of existing buildingsKhaled Mohamedspecial
01/06/2023FinalDAMIR RAHMANprogress
▾Documents — 232 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/06/2026M00083777-I1Request digital key ↗
09/01/2026M00753144-I1Request digital key ↗
09/01/2026M00808530-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00225341-I1Request digital key ↗
▸Applications & Permits53
▸BISWORK PERMIT APPLICATION32
07/22/2020140926078Open ↗
08/07/2018123580909Open ↗
04/13/2017140629933Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
07/21/2020140926078Open ↗
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
09/11/2019123537271Open ↗
11/20/2018123580909Open ↗
06/28/2018123580909Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
10/22/2014122169857Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
10/22/2014122169857Open ↗
08/08/2011120758974Open ↗
12/01/2009120213535Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00225341-I1Open ↗
09/01/2026M00753144-I1Open ↗
08/29/2026M00905324-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
07/21/2020140926078Open ↗
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/21/2020140926078Open ↗
04/13/2017140629933Open ↗
09/23/2016140552756Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/21/2020140926078Open ↗
04/13/2017140629933Open ↗
09/23/2016140552756Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026M01202195-P1Open ↗
08/25/2026M00808530-I1Open ↗
08/23/2026M01202195-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M01202195-P1Open ↗
08/23/2026M01202195-I1Open ↗
08/23/2026M01202195-I1Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE7
01/06/2015122072112Open ↗
12/11/2014122072112Open ↗
10/30/2014122072112Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/16/2009120138582Open ↗
11/13/2009120138582Open ↗
08/25/2009120138582Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/31/2014122072112Open ↗
10/22/2014122169857Open ↗
08/21/2014122072112Open ↗
▸BISSIGN HANGER CERTIFICATE1
12/01/2009120213526Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/28/2010120183906Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/25/2009120083943Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
09/11/2019123537271Open ↗
07/21/2020140926078Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00225341-I1Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
08/08/2011120758974Open ↗
12/01/2009120213535Open ↗
12/01/2009120213526Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00225341-I1Open ↗
09/01/2026M00753144-I1Open ↗
08/29/2026M00905324-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
08/21/2014122072112Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
07/22/2009120105484Open ↗
06/25/2009120083943Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
10/22/2014122169857Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/20/2018123580909Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2016140552756Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/23/2016140552756Open ↗
▸BISTECHNICAL REPORT: ENERGY1
08/08/2011120758974Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/22/2020140926078Open ↗
07/21/2020140926078Open ↗
04/13/2017140629933Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/28/2018123580909Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS8
08/08/2011120758974Open ↗
12/01/2009120213535Open ↗
12/01/2009120213526Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/20/2018123580909Open ↗
11/10/2010120105484Open ↗
07/28/2010120183906Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/07/2014122072112Open ↗
07/28/2010120183906Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
09/11/2019123537271Open ↗
11/20/2018123580909Open ↗
06/28/2018123580909Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET13
09/11/2019123537271Open ↗
06/28/2018123580909Open ↗
10/22/2014122169857Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/21/2020140926078Open ↗
04/13/2017140629933Open ↗
09/23/2016140552756Open ↗
▸BISADDITIONAL INFORMATION2
10/30/2014122072112Open ↗
10/28/2014122072112Open ↗
▸BISBOROUGH INTAKE FORM1
11/20/2018123580909Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/10/2010120105484Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00225341-I1Open ↗