← Back
Primarily 4 family with 1 store or office
36 VAN DYKE STREET
💬 Discuss this project
1925Year Built
3Stories
S4Building Class
M1-1Zoning
3,750 sfGross Floor Area
5Units
Rent Stabilized0 Open Violations
Primarily 4 family with 1 store or office · Owner of record: JKD & ESD LLC · 2,000 sf lot · 1.88 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof2p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 2
Floor 13p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JDK & ESD LLC103/22/2026
JKD & ESP LLC103/22/2026
BAB HOLDINGS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP903/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARHICTECTS1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEVO CONSTRUCTION INCGeneral Contractor903/21/2026
COBOT PLUMBING AND HEATING INCPlumbing707/08/2026
PETER LIElectrical303/21/2026
P L ELECL CONTRG CORP 003654General Contractor303/22/2026
P.L. ELEC'L CONTR'G CORPElectrical103/22/2026
GODFREY'S REFRIGERATIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957503/18/2025
Building Lifecycle
All (67)Filed (9)Permit Issued (9)Signed Off (5)Violation (12)Inspection (5)Special Inspection (27)
03/24/2025
Signed off — Alteration
Installation of new HVAC equipment, toilet exhaust
B00330100-I1
03/21/2025
Special inspection requirement — Final
Joseph Smerina
03/21/2025
Special inspection requirement — HVAC and service water heating equipment
Joseph Smerina
03/21/2025
Special inspection requirement — HVAC insulation and sealing
Joseph Smerina
03/21/2025
Special inspection requirement — HVAC and service water heating system controls
Joseph Smerina
03/21/2025
Special inspection requirement — Maintenance information
Joseph Smerina
03/21/2025
Special inspection requirement — Duct leakage testing
Joseph Smerina
03/21/2025
Special inspection requirement — Mechanical Systems
Joseph Smerina
03/18/2025
Filed — Alteration
Installation of new HVAC equipment, toilet exhaust
B00330100-P1
01/19/2023
Signed off — Alteration
RENOVATION OF APARTMENTS AND REMOVAL OF SWO #3697119. NO CHANGE TO USE, EGRESS, OR OCCUPANCY..
B00466287-I1
01/04/2023
Signed off — Alteration
B00330097-I1
01/04/2023
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND ANSWER SWO # 3697119.
B00466307-I1
01/03/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/29/2022
Signed off — Alteration
B00587738-I1
12/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/07/2022
Permit issued — Boiler Equipment
B00587738-I1-BE
11/09/2022
Permit issued — Plumbing
B00330097-I1-PL
08/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2022
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND ANSWER SWO # 3697119.
B00466307-P2
06/09/2022
Permit issued — Plumbing
B00466307-I1-PL
04/14/2022
Permit issued — General Construction
B00466287-I1-GC-CX
11/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
11/04/2021
Special inspection requirement — Mechanical Systems
Joseph Smerina
11/04/2021
Special inspection requirement — Insulation placement and R values
Joseph Smerina
11/04/2021
Special inspection requirement — Permanent certificate
Joseph Smerina
11/04/2021
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Smerina
11/04/2021
Special inspection requirement — Energy Code Compliance
Joseph Smerina
11/04/2021
Special inspection requirement — Final
Joseph Smerina
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
11/03/2021
Filed — Alteration
B00587738-I1
11/03/2021
Filed — Alteration
RENOVATION OF APARTMENTS AND REMOVAL OF SWO #3697119. NO CHANGE TO USE, EGRESS, OR OCCUPANCY..
B00466287-P1
11/03/2021
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND ANSWER SWO # 3697119.
B00466307-P1
09/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Smerina
09/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
09/28/2021
Special inspection requirement — Heating Systems
Joseph Smerina
09/28/2021
Special inspection requirement — Maintenance information
Joseph Smerina
09/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Smerina
09/24/2021
Permit issued — General Construction
B00466287-I1-GC-CX
05/20/2021
Permit issued — Mechanical Systems
B00466287-I1-GC-CX
05/19/2021
Permit issued — Plumbing
B00466307-I1-PL
03/30/2021
Special inspection requirement — Duct leakage testing
Joseph Smerina
03/30/2021
Special inspection requirement — Final
Joseph Smerina
03/30/2021
Special inspection requirement — Mechanical Systems
Joseph Smerina
03/30/2021
Special inspection requirement — Maintenance information
Joseph Smerina
03/30/2021
Special inspection requirement — HVAC insulation and sealing
Joseph Smerina
03/30/2021
Special inspection requirement — HVAC and service water heating system controls
Joseph Smerina
03/30/2021
Special inspection requirement — HVAC and service water heating equipment
Joseph Smerina
03/23/2021
Filed — Alteration
RENOVATION OF APARTMENTS AND REMOVAL OF SWO #3697119. NO CHANGE TO USE, EGRESS, OR OCCUPANCY..
B00466287-I1
03/23/2021
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AND ANSWER SWO # 3697119.
B00466307-I1
01/04/2021
Violation issued (ECB, closed)
Construction
11/18/2020
Permit issued — Plumbing
B00330097-I1-PL
11/16/2020
Permit issued — Mechanical Systems
B00330100-I1-MS
09/23/2020
Violation issued (ECB, closed)
Construction
04/22/2020
Filed — Alteration
Installation of new HVAC equipment, toilet exhaust
B00330100-I1
04/20/2020
Filed — Alteration
B00330097-I1
03/23/2020
Violation issued (ECB, closed)
Construction
12/31/2019
Violation issued (ECB, closed)
Construction
11/15/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCOBOT PLUMBING AND HEATIN12/07/2022
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN11/09/2022
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN06/09/2022
DOB NOWGeneral ConstructionSigned-offKEVO CONSTRUCTION INC04/14/2022
DOB NOWGeneral ConstructionSigned-offKEVO CONSTRUCTION INC09/24/2021
DOB NOWMechanical SystemsSigned-offKEVO CONSTRUCTION INC05/20/2021
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN05/19/2021
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN11/18/2020
DOB NOWMechanical SystemsSigned-offGODFREYS REFRIGERATION11/16/2020
BISOTISSUEDKEVO CONSTRUCTION INC04/22/2021
BISOTISSUEDKEVO CONSTRUCTION INC10/06/2020
BISOTISSUEDFAST TRACK ELECTRIC CORP10/06/2015
BISOTISSUEDFAST TRACK ELECTRIC CORP07/09/2015
BISPLISSUEDD & D PLUMBING INC08/08/2011
BISPLISSUEDD & D PLUMBING & HEATING INC.01/19/2007
BISOTISSUEDSTEPHEN W DEPTULA11/06/2006
BISOTISSUEDTARGET INDUSTRIES, INC.07/18/2001
2 projects · most recent 05/26/2021
General Wiring
FiledStatusContractorScope
05/26/2021CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
03/29/2021CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/03/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/21/2025FinalJoseph Smerinaprogress
03/21/2025HVAC and service water heating equipment Joseph Smerinaenergy_progress
03/21/2025HVAC insulation and sealing Joseph Smerinaenergy_progress
03/21/2025HVAC and service water heating system controls Joseph Smerinaenergy_progress
03/21/2025Maintenance informationJoseph Smerinaenergy_progress
03/21/2025Duct leakage testing Joseph Smerinaenergy_progress
03/21/2025Mechanical SystemsJoseph Smerinaspecial
11/04/2021Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
11/04/2021Mechanical SystemsJoseph Smerinaspecial
11/04/2021Insulation placement and R valuesJoseph Smerinaenergy_progress
11/04/2021Permanent certificateJoseph Smerinaenergy_progress
11/04/2021Fire-Resistance Rated ConstructionJoseph Smerinaprogress
11/04/2021Energy Code ComplianceJoseph Smerinaprogress
11/04/2021FinalJoseph Smerinaprogress
11/04/2021Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
09/28/2021HVAC-R and service water heating system controlsJoseph Smerinaenergy_progress
09/28/2021Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
09/28/2021Heating SystemsJoseph Smerinaspecial
09/28/2021Maintenance informationJoseph Smerinaenergy_progress
09/28/2021HVAC-R and service water heating equipmentJoseph Smerinaenergy_progress
03/30/2021Duct leakage testing Joseph Smerinaenergy_progress
03/30/2021FinalJoseph Smerinaprogress
03/30/2021Mechanical SystemsJoseph Smerinaspecial
03/30/2021Maintenance informationJoseph Smerinaenergy_progress
03/30/2021HVAC insulation and sealing Joseph Smerinaenergy_progress
Latest 25 of 27.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00330100-I1Request digital key ↗
09/01/2026B00466287-I1Request digital key ↗
08/15/2026B00466287-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00330097-I1Request digital key ↗
09/01/2026B00466307-P2Request digital key ↗
09/01/2026B00466307-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00466287-I1Request digital key ↗
09/01/2026B00466287-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/31/2026B00587738-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
10/06/2020322088245Open ↗
11/03/2015321122744Open ↗
07/14/2015321122744Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/27/2020322088245Open ↗
05/08/2015321122744Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026B00587738-I1Open ↗
09/01/2026B00330100-P1Open ↗
09/01/2026B00330100-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00466287-P1Open ↗
09/01/2026B00466287-I1Open ↗
09/01/2026B00466307-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00587738-I1Open ↗
09/01/2026B00330100-P1Open ↗
08/24/2026B00466287-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/27/2020322088245Open ↗
08/17/2016321122744Open ↗
05/08/2015321122744Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/27/2020322088245Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/27/2020322088245Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026B00466287-P1Open ↗
09/01/2026B00466287-I1Open ↗
09/01/2026B00466307-P1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/27/2020322088245Open ↗
05/08/2015321122744Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/27/2020322088245Open ↗
04/27/2020322088245Open ↗
08/17/2016321122744Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/05/2023322088245Open ↗
01/05/2023322088245Open ↗
06/17/2020322088245Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00587738-I1Open ↗
08/13/2026B00466287-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/05/2023322088245Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/17/2016321122744Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/05/2023322088245Open ↗
01/05/2023322088245Open ↗
01/05/2023322088245Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/06/2023322088245Open ↗
08/17/2016321122744Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
04/27/2020322088245Open ↗
08/17/2016321122744Open ↗
05/08/2015321122744Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/05/2023322088245Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/27/2020322088245Open ↗
05/08/2015321122744Open ↗