HPD08/11/2020§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON SOUTH ALL APPROXIMATELY 10 SQ FT ON EAST WALL APPROXIMATELY 10 SQ FT IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/11/2020§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ON CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD08/11/2020§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD08/11/2020§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
ECB04/30/2019FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35344508H ISSUED ON 9/25/18 AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSION$2K due
ECB03/07/2019FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35344508H ISSUED ON 09/25/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NO PERMIT OR APPLICATION FILED TO CORRECT VIOLATING CONDITION.$6K due
DOB01/09/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/06/2018FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER. NOTED: AT TIME OF INSPECTION OBSERVED THE MAIN STAIR IS MADE OF COMBUSTIBLE MATERIALS/WOOD CONTRARY TO BLDG CODES. REMEDY: COMPLY W/THE CODES.$3K due
ECB10/06/2018SEC. 801.1.1.1 RESPONSIBILITY OF OWNER OF THE TALLER BLDG ERECTED,ENLARGEMENT IN HEIGHT TO CARRY UP THE PREVIOUSLY CONSTRUCTED CHIMNEYS. NOTED: BLDG HAS BEEN CONSTRUCTED & EXPANDED HOWEVER AT EXP#2 OBSERVED AN$6K due
ECB09/29/2018WORK WITHOUT A PERMIT.NOTED NEW CONST.WORK DONE TO CONVERT AN EXISTING BUILDING INTO 3 FAMILY.WORK AS (1)NEW STRUCTURE WORK/NEW BRICK WALLS WERE CONSTRUCTED TO CREATE EXTRA SPACE ON 2ND & 3RD FLOOR "VERTICAL EN$2K due