36 WEST 34 STREET
MANHATTAN · BIN 1086750
💬 Discuss this project
1906Year Built
5Stories
K4Building Class
C5-3Zoning
19,268 sfGross Floor Area
7Units
0 Open Violations
Predominantly retail with other uses · Owner of record: ISTA HOLDING CO INC · 4,550 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 14 docs
Floor 42p · 1 filing · 10 docs
Floor 31p · 1 filing · 14 docs
Floor 2
Floor 15p · 3 filings · 20 docs
1 job · most recent 06/23/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2025Signed-offL&L CONSTRUCTION DEVELOPAir Conditioning Systems
Cooling
Oxbox J4AC5048E1000AA 48,000 BTU · Condensing Unit ×2
J4AH4P48A1C00AA 48,000 BTU · Fan Coil Indoor ×2
Lambro Industries N/A 1 BTU · Ductwork ×2
2 jobs · most recent 06/23/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/23/2025Permit IssuedWASOFF PLBG & UTILITY COWater/Sanitary
06/22/2021Permit IssuedCATMAN PLUMBING INCGas, Water/Sanitary
2 jobs · most recent 09/17/2025
General Wiring
FiledStatusContractorScope
09/17/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/15/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
Building Lifecycle
All (65)Filed (12)Permit Issued (9)Signed Off (5)Violation (5)Inspection (6)Special Inspection (28)
04/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/10/2025
Signed off — Alteration
NSTALLATION OF HVAC SYSTEM ON 4TH FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01234054-I1
09/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/27/2025
Signed off — Alteration
NSTALLATION OF HVAC SYSTEM ON 4TH FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01234054-S1
08/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/06/2025
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC HANDLE UNIT ON THIRD FLOOR, TO INSTALL AC CONDENSATE UNIT ON SECOND FLOOR ROOF AS PER PLAN FILED HEREWITH.
M01222581-I1
07/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Permit issued — Mechanical Systems
M01234054-S1-MS
07/02/2025
Filed — Alteration
NSTALLATION OF HVAC SYSTEM ON 4TH FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01234054-S1
06/23/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC HANDLE UNIT ON THIRD FLOOR, TO INSTALL AC CONDENSATE UNIT ON SECOND FLOOR ROOF AS PER PLAN FILED HEREWITH.
M01222581-P1
06/19/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
06/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
06/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
06/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
06/19/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
06/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/19/2025
Special inspection requirement — Final
MEHDI GHAZI
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2025
Permit issued — General Construction
M01234054-I1-GC
06/04/2025
Violation issued (ECB, closed)
Construction
06/04/2025
Violation issued (ECB, closed)
Construction
06/02/2025
Filed — Alteration
NSTALLATION OF HVAC SYSTEM ON 4TH FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01234054-I1
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/29/2025
Special inspection requirement — Final
ZHENHUAN XU
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
05/29/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
05/29/2025
Special inspection requirement — Duct leakage testing, insulation and design
ZHENHUAN XU
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
05/29/2025
Special inspection requirement — Lighting controls
ZHENHUAN XU
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
05/29/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
05/16/2025
Permit issued — Plumbing
M01222581-S1-PL
05/14/2025
Permit issued — Mechanical Systems
M01222581-I1-MS
05/14/2025
Permit issued — General Construction
M01222581-I1-GC
05/09/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC HANDLE UNIT ON THIRD FLOOR, TO INSTALL AC CONDENSATE UNIT ON SECOND FLOOR ROOF AS PER PLAN FILED HEREWITH.
M01222581-I1
05/09/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC HANDLE UNIT ON THIRD FLOOR, TO INSTALL AC CONDENSATE UNIT ON SECOND FLOOR ROOF AS PER PLAN FILED HEREWITH.
M01222581-S1
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/11/2023
Signed off — Alteration
INSTALL KITCHEN EXHAUST HOOD, BLOWER AND RELATED DUCT WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00868833-I1
06/13/2023
Special inspection requirement — Mechanical Systems
XIONGCAI GU
06/13/2023
Special inspection requirement — Final
XIONGCAI GU
06/12/2023
Filed — Alteration
INSTALL KITCHEN EXHAUST HOOD, BLOWER AND RELATED DUCT WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00868833-P1
06/01/2023
Special inspection requirement — Mechanical Systems
XIONGCAI GU
06/01/2023
Special inspection requirement — Final
XIONGCAI GU
05/04/2023
Permit issued — Mechanical Systems
M00868833-I1-MS
05/03/2023
Filed — Alteration
INSTALL KITCHEN EXHAUST HOOD, BLOWER AND RELATED DUCT WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00868833-I1
09/28/2021
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL STORE AS PER PLAN. NEW PARTITIONS,DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00475538-I1
07/26/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL STORE AS PER PLAN. NEW PARTITIONS,DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00475538-P2
07/22/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
07/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
07/22/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
06/22/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL STORE WITH PLUMBING WORK AS PER PLAN;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00475548-P1
05/03/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL STORE AS PER PLAN. NEW PARTITIONS,DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00475538-P1
04/09/2021
Permit issued — General Construction
M00475538-I1-GC
03/04/2021
Permit issued — General Construction
M00475538-I1-GC
03/03/2021
Permit issued — Plumbing
M00475548-I1-PL
Latest 60 of 65 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLDG MANAGEMENT2507/08/2026
ISTA HOLDING103/22/2026
L&L CONSTRUCTION DEVELOP103/22/2026
ALGM LEASE HOLD LLC203/22/2026
ISTA HOLDING LO FAL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.207/02/2025
HUAN DESIGN INC.306/23/2025
G ENGINEERING PC206/12/2023
BILLAH ENGINEERING PLLC507/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
ALPHA HOME DESIGN LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor903/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
PRIMROSE SERVICE INCGeneral Contractor107/08/2026
YILIN CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
WASOFF PLBG & UTILITY COPlumbing106/28/2026
HAIAN HONEST RENOVATIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129207/02/2025
HUAN DESIGN INC7669306/23/2025
G ENGINEERING PC7778206/12/2023
BILLAH ENGINEERING5838307/26/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offL&L CONSTRUCTION DEVELOP07/03/2025
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC06/04/2025
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO05/16/2025
DOB NOWMechanical SystemsSigned-offL&L CONSTRUCTION DEVELOP05/14/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP05/14/2025
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC05/04/2023
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION04/09/2021
DOB NOWGeneral ConstructionSigned-offYILIN CONSTRUCTION INC03/04/2021
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC03/03/2021
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/19/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/19/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/19/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/19/2025Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
06/19/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/19/2025Mechanical SystemsMEHDI GHAZIspecial
06/19/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/19/2025FinalMEHDI GHAZIprogress
06/02/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
05/29/2025FinalZHENHUAN XUprogress
05/29/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
05/29/2025Interior lighting powerZHENHUAN XUenergy_progress
05/29/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
05/29/2025Duct leakage testing, insulation and designZHENHUAN XUenergy_progress
05/29/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
05/29/2025Lighting controlsZHENHUAN XUenergy_progress
05/29/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
05/29/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
05/29/2025Mechanical SystemsZHENHUAN XUspecial
05/09/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
05/09/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
06/13/2023Mechanical SystemsXIONGCAI GUspecial
06/13/2023FinalXIONGCAI GUprogress
06/01/2023Mechanical SystemsXIONGCAI GUspecial
06/01/2023FinalXIONGCAI GUprogress
Latest 25 of 28.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch12
09/03/2026M00475548-P1Request digital key ↗
09/03/2026M00475548-I1Request digital key ↗
09/03/2026M00475538-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00475538-P1Request digital key ↗
09/03/2026M00475538-P2Request digital key ↗
09/03/2026M00475538-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00475548-I1Request digital key ↗
08/15/2026M00475548-P1Request digital key ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026M00868833-I1Open ↗
08/31/2026M00868833-P1Open ↗
08/23/2026M01222581-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00475538-P2Open ↗
09/01/2026M00475538-P2Open ↗
08/30/2026M01234054-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00475538-P2Open ↗
08/30/2026M01234054-S1Open ↗
08/24/2026M01234054-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026M01222581-P1Open ↗
08/23/2026M01222581-S1Open ↗
08/23/2026M01222581-I1Open ↗
Showing 3 of 5 on file for this type