DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB03/10/2021CYCLE 9C UNSAFE REPORT FILED
DOB10/25/2019V-DOB VIOLATION - ACTIVE
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB06/30/2015V-DOB VIOLATION - ACTIVE
DOB06/30/2015V-DOB VIOLATION - ACTIVE
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C, 8C, AND 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #904138. AGG1: PRIOR NOV 37026218ZHearing held — result not yet published$3K proposed
ECB12/02/2024FAILURE TO MAINTAIN EXTERIOR FACADE AMD APPURTENANCES. NOTES: CRACKED/SPALLING BRICK MASONRY AT EXPOSURE #1 NORTH ELEVATION AT 10TH STORY. RMEDY: MAINTAIN EXTERIOR FACADE TAKE SAFETY MEASURES REPAIR DAMAGED FACNothing owed — awaiting certificate of correction
ECB02/08/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C,8C & 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #904138.REMEDY:FILE ACCEPTABLE REPORTNothing owed — awaiting certificate of correction
ECB04/21/2023A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100' OR MORE IN HENothing owed — awaiting certificate of correction
ECB03/25/2022FAILURE TO MAINTAIN EXTERIOR BLDG FACADE & APPURENANCES. AT NORTH ELEVATION EXP#1 OBSERVED: 1)BROKEN WINDOW GLASS AT 13TH FL 2)SPALLED STONES AT FACADE CORNICE AT 10TH FL 3)INADEQUATE SUPPORTS FOR A/C WINDOW ATNothing owed — awaiting certificate of correction
ECB04/22/2021A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HEIGNothing owed — awaiting certificate of correction
ECB04/21/2020SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDGNothing owed — awaiting certificate of correction
ECB02/14/2020FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE:EXPOSURES 1 AND 3,NORTH&SOUTH ELEVATIONS DISPLAY MULTIPLE EXHAUST AND/OR VENTILATION DUCTS W/O GRILLES. ALSO A/CS INSTALLATION W/ IMPROPER SUNothing owed — awaiting certificate of correction
ECB11/15/2019AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEENothing owed — awaiting certificate of correction
ECB01/04/2017FAILURE TO FILE ACCEPTABLE AMENDED REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT. REMEDY: FILE ACCEPTABLE AMENDED REPORT.Nothing owed — awaiting certificate of correction
ECB01/11/2008FAILURE TO MAINTAIN PLUMBING AND/OR APPURTENANCES. UPON PHYSICAL INSPECTION FOUND THAT IN ROOM 809 SPRINKLER HEAD PAINTED, REPLACE SPRINKLERHEAD THRU OUT ROOM 809. REMEDY: MAINTAIN PLUMBING AND/OR APPURTENANCESNothing owed — awaiting certificate of correction
Office with commercial, 7-19 stories · 8,033 sf lot · 12.17 FAR built · Flood zone X