ECB06/12/2026Failure to maintain building in code-compliant manner.no gas vents in gas meter room.rem:comply with code.Nothing owed — awaiting certificate of correction
ECB06/12/2026Failure to maintain building in code-compliant manner.3RD floor corridor doors at stair c dont close properly.stair a,gym and cafe doors,B2 exit.rem:comply with code.Nothing owed — awaiting certificate of correction
ECB06/12/2026Reissue#35657947R failure to maintain building in code-compliant manner.at cellar level a steel corridor beam is showing signs of decay.rem:comply with code.Nothing owed — awaiting certificate of correction
ECB06/27/2025Failure to maintain building in code-compiant manner. Noted: water damage to walls and around rms b-9, B10AND B12, B13. Damage caused by regular back ups of sewer and storm water from pipes at the pipe chase beNothing owed — awaiting certificate of correction
ECB06/27/2025Re-issue #35689078K. Failure to maintain building in code-compliant manner. Noted: in the boiler rm at cellar level, a steel girder beam is showing signs of decay. The concrete encasement is cracked and deterioNothing owed — awaiting certificate of correction
ECB09/03/2024Reissued ECB #3567947R. Failure to maintain building in code-compliantmanner. Noted: cellr boiler room a metal beam incased in concrete has cracks and spalling and is in danger of peeling off and failing and isNothing owed — awaiting certificate of correction
ECB06/05/2023Reissue #3567947R. Failure to maintain building in code-compliant manner. At cellar level beam with running cracks and spalling masonry across a 3FT area above boiler area. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB05/28/2021REISSUE35490783H failure to maintain bldg in codecompliant manner.atoinoted@cellar boilerrm masonry beam@ceiling APPROX7'X13' masonry cracked&delamanting.comply w/code.Nothing owed — awaiting certificate of correction
ECB05/22/2020Reissued#35447785H(8/22/19)failure to maintain bldg in code compliant manner @ boiler room cellar level horizontal cracks approx 7'& 3' longon concrete beams. Remedy: repair &/or replace.Nothing owed — awaiting certificate of correction
ECB08/22/2019Failure to maintain building in code complaint manner noted at boiler room concrete beam with horizontal cracks approx 7 ft long and 3FT long repair and/or replaceNothing owed — awaiting certificate of correction
ECB09/27/2018Failure to maintain building in code compliant manner noted: at boiler room, horizontal cracks apprx 7'length and 3'length at center concrete beam was observed. Rmdy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB10/05/200550A. 50A-install a permanent stairway or inclined ladder to permit safe access to the top of the boiler as per NY state code (R4-4.6C) 50B-insulate boiler. 50C-pipe down safety valve discharge to a safe point.Nothing owed — awaiting certificate of correction
ECB10/05/200550A/50B/50C. 50A-install a permanent stairway or inclined ladder to permit safe access to the top of the boiler as per NY state code (4-6.6C) 50B-insulate boiler. 50C-pipe down safety valve to a safe point of dNothing owed — awaiting certificate of correction