Condo, residential tower (mixed-use, multi-family elevator) [derived]
Leighton House Condominium
360 EAST 88 STREET · Upper East Side-Yorkville · BIN 1050054
💬 Discuss this project
1988Year Built
46Stories
RMBuilding Class
R10Zoning
212,760 sfGross Floor Area
163Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: LEIGHTON HOUSE CONDOMINIUM · 10,953 sf lot · 19.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 3 filings
Floor 421 filing
Floor 41
Floor 40
Floor 392 filings
Floor 382p · 1 filing
Floor 37Under Construction1 filing
Floor 36
Floor 35
Floor 34
Floor 333p · 1 filing
Floor 322p · 1 filing
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25Under Construction1 filing
Floor 241 filing
Floor 231 filing
Floor 223p · 1 filing
Floor 21
Floor 201 filing
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 121 filing
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41 filing
Floor 3Under Construction3p · 1 filing
Floor 2Under Construction2p · 1 filing
Floor 12 filings
Site & exteriorUnder Construction3 filings · 6 docs
Filed — no permit issued1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHARLES H GREENTHAL MANAGEMENT COR3208/13/2026
COOPER SQUARE REALTY2303/21/2026
NOUVEAU PROPERTY MANAGEMENT909/15/2026
PYRAMID RESTORATION NY709/13/2026
CEPRINE CONSTRUCTION603/22/2026
HALSTEAD MANAGEMENT303/21/2026
PRIME CONTRACTORS203/21/2026
ROMANOV103/22/2026
PARK AVE COURT CONDOMINIUM103/21/2026
QUANTUM DESIGN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINA VEDMED ARCHITECT103/21/2026
CHARLES H GREENTHAL MANAGEMENT COR403/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
FIRST SERVICE RESIDENTIAL403/21/2026
GANCI LOGOZZO403/21/2026
MESZAROS ENGINEERING PLLC1003/21/2026
WLA ENGINEERING P C403/21/2026
CODE603/21/2026
CYPHER DESIGN203/21/2026
STONECORE LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMANOV INCGeneral Contractor404/09/2026
CC CONTROLLED PLBG CO.,INPlumbing408/13/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor408/25/2026
C C CONTROLLED COMBUSTIONGeneral Contractor407/25/2026
WILLIAM HERMANElectrical303/21/2026
HERMAN WILLIAMElectrical303/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor303/21/2026
ZONE PLUMBING & HEATING CPlumbing207/08/2026
GLENDALE ELECTL CONTNG INElectrical203/22/2026
A. TOBIN INTERIORS INCGeneral Contractor204/09/2026
EAST SIDE INTERIORS INCGeneral Contractor203/21/2026
EDR CONST & MGMT INCGeneral Contractor203/21/2026
GARADICE BUILDERS INCGeneral Contractor203/21/2026
PYRAMID RESTORATION NY LLGeneral Contractor204/09/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ZFM INCPlumbing207/08/2026
AXON ELEC'L CONTRG CORPElectrical103/22/2026
P.S.I. MECHANICALPlumbing107/08/2026
H & D MAINTENANCE CO INCGeneral Contractor107/08/2026
KEL-MAR INTERIORS INCGeneral Contractor107/08/2026
LINKED MECHANICAL LLCGeneral Contractor107/29/2026
SCHIMENTI CONSTRUCTION COPlumbing107/08/2026
RENOVATION WITH PASSION IGeneral Contractor107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
TRANSITION MANAGEMENT CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239309/02/2026
MESZAROS ENGINEERING PLLC963707/15/2026
OBAID MIAN849107/13/2026
CTHREE ARCHITECTURE + DES1124101/12/2026
RYAN SPECIAL ENGINEERING2018412/24/2024
SOCOTEC ENGINEERING4983108/12/2024
STANDING ARCHITECTURE LLC2722108/22/2023
H. A. BADER CONSULTANTS2332209/15/2022
FEINGOLD & GREGORY ARCHIT979105/05/2022
MICHAEL ZENREICH ARCHITEC1724104/29/2022
Building Lifecycle
All (249)Filed (45)Permit Issued (42)Signed Off (14)Facade (FISP) (12)Violation (60)Inspection (24)Objection (22)Special Inspection (30)
09/02/2026
Filed — Alteration
INTERIOR ALTERATION AT APARTMENT 34A. REMOVE EXISTING KITCHEN. RELOCATE FIXTURES WITH NEW. NO CHANGE TO USE, OCCUPANCY, EGRESS OR ZONING
M01447954-S1
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER CARSON
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AHMAD KHANZADA
08/24/2026
Permit issued — Sidewalk Shed
M01407203-I1-SH
08/12/2026
Permit issued — Plumbing
M00991060-S1-PL
08/11/2026
Permit issued — Mechanical Systems
M01410547-I1-MS
08/10/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/28/2026
Permit issued — Mechanical Systems
M01414333-I1-GC-CX
07/23/2026
Permit issued — General Construction
M00991060-I1-GC
07/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
07/16/2026
Special inspection requirement — Maintenance information
Christian Meszaros
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
07/16/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
07/15/2026
Filed — Alteration
INSTALLATION OF NEW GAS FIRED WATER HEATERS, STORAGE TANKS, AND BOOSTER PUMPS. INSTALLATION OF NEW DOMESTIC WATER LINES FROM CELLAR TO ROOF. NO CHANGE IN EGRESS OR OCCUPANCY.
M00991060-P4
07/13/2026
Filed — Alteration
Rooftop air conditioning unit replacement on existing roof curb. All existing duct work to remain. No change in use egress and occupancy.
M01410547-I1
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Obaid Mian
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
07/08/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
07/08/2026
Special inspection requirement — Maintenance information
Christian Meszaros
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
06/30/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2026
Filed — Alteration
INSTALLATION OF NEW SPLIT-SYSTEM HEAT PUMP FOR TENANT GYM. NO CHANGE IN EGRESS OR OCCUPANCY.
M01414333-I1
06/05/2026
Permit issued — General Construction
M01384724-I1-GC
06/03/2026
Permit issued — Plumbing
M01384724-S1-PL
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
06/02/2026
Special inspection requirement — Final
Obaid Mian
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
06/02/2026
Special inspection requirement — Maintenance information
Obaid Mian
06/02/2026
Special inspection requirement — Mechanical Systems
Obaid Mian
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01362556-I1
05/28/2026
Permit issued — Suspended Scaffold
M01391846-I1-SC
05/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01407203-I1
05/26/2026
Permit issued — Sidewalk Shed
M01407203-I1-SH
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTOPHER CARSON
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTOPHER CARSON
05/04/2026
Objection raised — Inspections
05/04/2026
Objection raised — Scope
05/04/2026
Objection raised — Other
05/01/2026
Filed — Alteration
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
M01391846-I1
04/27/2026
Filed — Alteration
REMOVE & REPLACE PLUMBING FIXTURES AT (2) ATHROOMS & (1) POWDER ROOM. REMOVE, RELOCATE AND ADD PLUMBING FIXTURES AT (1) BATHROOM. NO CHANGE TO USE, EGRESS, ZONING OR OCCUPANCY
M01384724-I1
04/27/2026
Filed — Alteration
REMOVE & REPLACE PLUMBING FIXTURES AT (2) ATHROOMS & (1) POWDER ROOM. REMOVE, RELOCATE AND ADD PLUMBING FIXTURES AT (1) BATHROOM. NO CHANGE TO USE, EGRESS, ZONING OR OCCUPANCY
M01384724-S1
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AHMAD KHANZADA
04/23/2026
Special inspection requirement — Post-installed Anchors
AHMAD KHANZADA
04/23/2026
Special inspection requirement — Final
CHRISTOPHER CARSON
04/23/2026
Special inspection requirement — Lighting in dwelling units
CHRISTOPHER CARSON
02/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01362556-I1
02/25/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01362557-I1
02/25/2026
Permit issued — Supported Scaffold
M01362557-I1-SF
02/25/2026
Permit issued — Sidewalk Shed
M01362556-I1-SH
02/19/2026
Special inspection requirement — Final
William Lau
02/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/24/2026
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN08/12/2026
DOB NOWMechanical SystemsPermit IssuedARISTA AIR CONDITIONING CORP08/11/2026
DOB NOWMechanical SystemsPermit IssuedLINKED MECHANICAL LLC07/28/2026
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION07/23/2026
DOB NOWGeneral ConstructionPermit IssuedRENOVATION WITH PASSION I06/05/2026
DOB NOWPlumbingPermit IssuedPIPEWORKS NYC INC06/03/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY05/28/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC05/26/2026
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC02/25/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/25/2026
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL02/09/2026
DOB NOWGeneral ConstructionPermit IssuedA. TOBIN INTERIORS INC02/06/2026
DOB NOWGeneral ConstructionPermit IssuedA. TOBIN INTERIORS INC01/28/2026
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL01/28/2026
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION11/17/2025
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C08/18/2025
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN08/15/2025
DOB NOWGeneral ConstructionPermit IssuedROMANOV INC07/22/2025
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION03/12/2025
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL11/04/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C08/07/2024
DOB NOWGeneral ConstructionPermit IssuedROMANOV INC07/30/2024
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN07/24/2024
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION03/04/2024
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN03/01/2024
DOB NOWGeneral ConstructionSigned-offCR SAFETY GROUP09/28/2023
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST09/28/2023
DOB NOWGeneral ConstructionSigned-offEDR CONST MGMT05/17/2023
DOB NOWGeneral ConstructionSigned-offBHD GROUP LLC07/07/2022
DOB NOWGeneral ConstructionSigned-offTRANSITION MANAGEMENT COR06/02/2022
DOB NOWGeneral ConstructionSigned-offEAST SIDE INTERIORS07/26/2021
DOB NOWPlumbingSigned-offFRED SMITH P&H CO INC07/09/2021
DOB NOWGeneral ConstructionSigned-offH & D MAINTENANCE CO INC07/09/2021
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC06/07/2021
DOB NOWGeneral ConstructionPermit IssuedKEL-MAR INTERIORS INC05/28/2021
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC03/12/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/31/2020
DOB NOWPlumbingPermit IssuedDEMAR PLUMBING CORP02/27/2020
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC01/07/2020
+ 52 more permits on file
2 projects · most recent 07/13/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026Permit IssuedARISTA AIR CONDITIONING CAir Conditioning Systems
Cooling
Carrier 50FE-M07A2A5-0A0A0 72,000 BTU · Rooftop Unit ×1
06/17/2026Permit IssuedLINKED MECHANICAL LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-FX18NL 23,600 BTU · Fan Coil Indoor ×2
MSZ-FX06NL 9,000 BTU · Fan Coil Indoor ×1
MXZ-SM42NLHZ 48,000 BTU · Condensing Unit ×1
6 projects · most recent 09/02/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/02/2026——Gas, Water/Sanitary
07/15/2026Permit IssuedCC CONTROLLED PLBG CO.,INGas, Water/Sanitary
04/27/2026Permit IssuedPIPEWORKS NYC INCWater/Sanitary
01/23/2026Signed-offP.S.I. MECHANICALGas, Water/Sanitary
12/24/2024Signed-off5 BORO'S PLUMBING INCGas, Water/Sanitary
02/18/2020Permit IssuedDEMAR PLUMBING CORPGas, Water/Sanitary
20 projects · most recent 02/18/2026
General Wiring Lighting
FiledStatusContractorScope
02/18/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
02/02/2026CompleteDCE CORPORATIONGeneral Wiring
12/04/2025CompleteELECTRIC A/C INCGeneral Wiring
10/24/2025CompleteGRX EURO ELECTRIC CORPGeneral Wiring
09/02/2025CompleteALL PURPOSE ELECTRIC CORP—
06/11/2024CompleteT. MCCAFFREY-T. MCGOVERNGeneral Wiring
07/20/2023Permit IssuedERRIGAL ELECTRICAL CORPGeneral Wiring
07/06/2023CompleteAXON ELEC'L CONTRG CORPGeneral Wiring
05/30/2023CompleteVALENTIS ELECTRIC, INC.General Wiring
02/10/2023CompleteARC POWER ELECL CONTS INC—
08/02/2022Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
05/01/2020CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
03/04/2020CompleteBRONXDALE ELECTRIC INCGeneral Wiring
02/28/2020Permit IssuedHECMAR ELECTRICGeneral Wiring
10/04/2019CompleteDUDLEY & ASSOC. LIC. ELECGeneral Wiring
3 projects · most recent 05/26/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/26/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
02/25/2026Permit IssuedANDAMIO SCAFFOLDING LLCScaffold
02/25/2026Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 05/01/2026
FiledStatusContractorScope
05/01/2026Permit IssuedSTREAMLINE CONSULTANTS NY—
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
08/10/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/30/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
08/26/2026Fire-Resistant Penetrations and JointsAHMAD KHANZADAspecial
08/26/2026Energy Code Compliance InspectionsCHRISTOPHER CARSONprogress
07/16/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
07/16/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
07/16/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
07/16/2026Maintenance informationChristian Meszarosenergy_progress
07/16/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
07/16/2026Post-installed AnchorsChristian Meszarosspecial
07/13/2026Tenant Protection Plan ComplianceObaid Mianspecial
07/08/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
07/08/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
07/08/2026Maintenance informationChristian Meszarosenergy_progress
07/08/2026Tenant Protection Plan Compliance—special
07/08/2026Post-installed AnchorsChristian Meszarosspecial
07/08/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
06/02/2026FinalObaid Mianprogress
06/02/2026HVAC-R and service water heating system controlsObaid Mianenergy_progress
06/02/2026HVAC-R and service water piping design and insulationObaid Mianenergy_progress
06/02/2026HVAC-R and service water heating equipmentObaid Mianenergy_progress
06/02/2026Mechanical SystemsObaid Mianspecial
06/02/2026Maintenance informationObaid Mianenergy_progress
05/12/2026Energy Code Compliance InspectionsCHRISTOPHER CARSONprogress
05/11/2026Fire-Resistance Rated ConstructionCHRISTOPHER CARSONprogress
04/23/2026Fire-Resistant Penetrations and JointsAHMAD KHANZADAspecial
04/23/2026Post-installed AnchorsAHMAD KHANZADAspecial
Latest 25 of 89.
▾Documents — 908 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch36
09/15/2026M01447954-I1Request digital key ↗
09/15/2026M01447954-S1Request digital key ↗
09/06/2026M00031839-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00280646-I1Request digital key ↗
09/05/2026M00200298-I1Request digital key ↗
09/04/2026M00249900-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits165
▸BISPLAN / WORK APPROVAL APPLICATION85
07/20/2023101901024Open ↗
06/20/2023101901024Open ↗
06/13/2023101901024Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION79
10/25/2021122849864Open ↗
10/02/2020123730775Open ↗
06/04/2020123730775Open ↗
Showing 3 of 79 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications240
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION80
02/14/2020123840914Open ↗
02/05/2020123856176Open ↗
12/19/2019123724103Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
09/23/2026M01447954-S1Open ↗
09/23/2026M01447954-I1Open ↗
09/23/2026M01447954-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/15/2026M01447954-I1Open ↗
09/15/2026M01447954-S1Open ↗
09/05/2026M00280646-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026M01447954-S1Open ↗
09/23/2026M00727033-I1Open ↗
09/02/2026M00516958-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
12/19/2019123724103Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
12/19/2019123724103Open ↗
Showing 1 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/10/2021141002402Open ↗
▸Trade Schedules & Equipment59
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
04/25/2018122140600Open ↗
04/20/2018123385176Open ↗
03/19/2018122140600Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/21/2022122849864Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/21/2022122849864Open ↗
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes17
02/14/2020123840914Open ↗
02/05/2020123856176Open ↗
12/19/2019123724103Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan7
08/13/2026M00249900-I1Open ↗
08/13/2026M00200298-P1Open ↗
08/13/2026M00249900-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos55
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/15/2026M01447954-I1Open ↗
09/15/2026M01447954-S1Open ↗
09/05/2026M00315919-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
02/14/2020123840914Open ↗
02/07/2020123856176Open ↗
02/05/2020123856176Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance82
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
02/14/2020123840914Open ↗
02/05/2020123856176Open ↗
12/19/2019123724103Open ↗
Showing 3 of 43 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
05/12/2021123724103Open ↗
10/23/2020123713794Open ↗
11/15/2018122140600Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/12/2021123724103Open ↗
05/12/2021123724103Open ↗
10/23/2020123713794Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/14/2026M00700719-I1Open ↗
08/13/2026M00727033-I1Open ↗
08/13/2026M00557534-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/10/2021141002402Open ↗
Showing 1 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
03/21/2022122849864Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/21/2022122849864Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/21/2022122849864Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/21/2022122849864Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/21/2022122849864Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY12
06/22/2023101901024Open ↗
06/16/2023101901024Open ↗
06/10/2021141002402Open ↗
Showing 3 of 12 on file for this type
▸BISMECHANICAL SYSTEMS1
03/21/2022122849864Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/15/2018122140600Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/21/2022122849864Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/21/2023101901024Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
03/22/2022122849864Open ↗
05/12/2021123724103Open ↗
10/23/2020123713794Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/02/2020123730775Open ↗
08/17/2020123730775Open ↗
10/22/2018122223682Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
03/21/2022122849864Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership76
▸BISCOST AFFIDAVIT70
06/23/2023101901024Open ↗
06/10/2021141002402Open ↗
05/12/2021123724103Open ↗
Showing 3 of 70 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/21/2022122849864Open ↗
03/14/2022123730775Open ↗
▸Filing & Intake Forms81
▸BISEFILING COVER SHEET37
02/14/2020123840914Open ↗
02/05/2020123856176Open ↗
12/19/2019123724103Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION24
07/20/2023101901024Open ↗
02/04/2022122849864Open ↗
08/17/2020123730775Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM15
10/25/2021122849864Open ↗
10/02/2020123730775Open ↗
05/15/2020123840914Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
06/10/2021141002402Open ↗
Showing 1 of 5 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
11/29/2019123730775Open ↗
10/03/2017110479189Open ↗
07/25/2017123045855Open ↗
Showing 3 of 10 on file for this type
▸BISMAINTENANCE INFORMATION1
03/21/2022122849864Open ↗
▸BISSHUTOFF DAMPERS1
03/21/2022122849864Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type