| Owner | Filings | Most Recent |
|---|---|---|
| CHARLES H GREENTHAL MANAGEMENT COR | 32 | 08/13/2026 |
| COOPER SQUARE REALTY | 23 | 03/21/2026 |
| NOUVEAU PROPERTY MANAGEMENT | 9 | 09/15/2026 |
| PYRAMID RESTORATION NY | 7 | 09/13/2026 |
| CEPRINE CONSTRUCTION | 6 | 03/22/2026 |
| HALSTEAD MANAGEMENT | 3 | 03/21/2026 |
| PRIME CONTRACTORS | 2 | 03/21/2026 |
| ROMANOV | 1 | 03/22/2026 |
| PARK AVE COURT CONDOMINIUM | 1 | 03/21/2026 |
| QUANTUM DESIGN | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CHRISTOPHER CARSON, ARCHITECT | 7 | 09/02/2026 |
| MESZAROS ENGINEERING PLLC | 7 | 07/15/2026 |
| NEWTEC ENGINEERING | 1 | 07/13/2026 |
| ALWAYS FAST SERVICES CORP | 3 | 05/26/2026 |
| WILLIAM LAU | 2 | 02/17/2026 |
| PECORA ARCHITECTURE | 2 | 01/23/2026 |
| TMF ELEC'L CONTR. INC. | 3 | 02/06/2025 |
| WISKUP ARCHITECTURE PLLC | 2 | 04/17/2023 |
| PJAR ARCHITECTS PC | 3 | 09/15/2022 |
| FEINGOLD AND GREGORY ARCH. | 2 | 05/05/2022 |
| MICHAEL ZENREICH ARCHITECT PC | 1 | 04/29/2022 |
| DINA VEDMED ARCHITECT | 1 | 07/14/2021 |
| FIELD LINES | 3 | 05/13/2021 |
| ANZALONE ARCHITECTURE PLLC | 3 | 04/05/2021 |
| LUKE LICALZI, P.E., P.C. | 2 | 04/17/2020 |
| STUDIO AU ARCHITECTURE | 1 | 12/18/2019 |
| PACE ENGINEERING P.C. | 1 | 04/02/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| DINA VEDMED ARCHITECT | 1 | 03/21/2026 |
| CHARLES H GREENTHAL MANAGEMENT COR | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| FIRST SERVICE RESIDENTIAL | 4 | 03/21/2026 |
| GANCI LOGOZZO | 4 | 03/21/2026 |
| MESZAROS ENGINEERING PLLC | 10 | 03/21/2026 |
| WLA ENGINEERING P C | 4 | 03/21/2026 |
| CODE | 6 | 03/21/2026 |
| CYPHER DESIGN | 2 | 03/21/2026 |
| STONECORE LLC | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ROMANOV INC | General Contractor | 4 | 04/09/2026 |
| CC CONTROLLED PLBG CO.,IN | Plumbing | 4 | 08/13/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 4 | 08/25/2026 |
| C C CONTROLLED COMBUSTION | General Contractor | 4 | 07/25/2026 |
| WILLIAM HERMAN | Electrical | 3 | 03/21/2026 |
| HERMAN WILLIAM | Electrical | 3 | 03/21/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 3 | 03/21/2026 |
| ZONE PLUMBING & HEATING C | Plumbing | 2 | 07/08/2026 |
| GLENDALE ELECTL CONTNG IN | Electrical | 2 | 03/22/2026 |
| A. TOBIN INTERIORS INC | General Contractor | 2 | 04/09/2026 |
| EAST SIDE INTERIORS INC | General Contractor | 2 | 03/21/2026 |
| EDR CONST & MGMT INC | General Contractor | 2 | 03/21/2026 |
| GARADICE BUILDERS INC | General Contractor | 2 | 03/21/2026 |
| PYRAMID RESTORATION NY LL | General Contractor | 2 | 04/09/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| ZFM INC | Plumbing | 2 | 07/08/2026 |
| AXON ELEC'L CONTRG CORP | Electrical | 1 | 03/22/2026 |
| P.S.I. MECHANICAL | Plumbing | 1 | 07/08/2026 |
| H & D MAINTENANCE CO INC | General Contractor | 1 | 07/08/2026 |
| KEL-MAR INTERIORS INC | General Contractor | 1 | 07/08/2026 |
| LINKED MECHANICAL LLC | General Contractor | 1 | 07/29/2026 |
| SCHIMENTI CONSTRUCTION CO | Plumbing | 1 | 07/08/2026 |
| RENOVATION WITH PASSION I | General Contractor | 1 | 07/08/2026 |
| GREGORY PAPANTONIOU | Electrical | 1 | 03/21/2026 |
| TRANSITION MANAGEMENT COR | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AMKA & ASSOCIATES LLC | 8239 | 3 | 09/02/2026 |
| MESZAROS ENGINEERING PLLC | 963 | 7 | 07/15/2026 |
| OBAID MIAN | 849 | 1 | 07/13/2026 |
| CTHREE ARCHITECTURE + DES | 1124 | 1 | 01/12/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 4 | 12/24/2024 |
| SOCOTEC ENGINEERING | 4983 | 1 | 08/12/2024 |
| STANDING ARCHITECTURE LLC | 2722 | 1 | 08/22/2023 |
| H. A. BADER CONSULTANTS | 2332 | 2 | 09/15/2022 |
| FEINGOLD & GREGORY ARCHIT | 979 | 1 | 05/05/2022 |
| MICHAEL ZENREICH ARCHITEC | 1724 | 1 | 04/29/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | CC CONTROLLED PLBG CO.,IN | 08/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ARISTA AIR CONDITIONING CORP | 08/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LINKED MECHANICAL LLC | 07/28/2026 |
| DOB NOW | General Construction | Permit Issued | C C CONTROLLED COMBUSTION | 07/23/2026 |
| DOB NOW | General Construction | Permit Issued | RENOVATION WITH PASSION I | 06/05/2026 |
| DOB NOW | Plumbing | Permit Issued | PIPEWORKS NYC INC | 06/03/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STREAMLINE CONSULTANTS NY | 05/28/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 05/26/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ANDAMIO SCAFFOLDING LLC | 02/25/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 02/25/2026 |
| DOB NOW | Plumbing | Signed-off | P.S.I. MECHANICAL | 02/09/2026 |
| DOB NOW | General Construction | Permit Issued | A. TOBIN INTERIORS INC | 02/06/2026 |
| DOB NOW | General Construction | Permit Issued | A. TOBIN INTERIORS INC | 01/28/2026 |
| DOB NOW | General Construction | Permit Issued | PYRAMID RESTORATION NY LL | 01/28/2026 |
| DOB NOW | General Construction | Permit Issued | C C CONTROLLED COMBUSTION | 11/17/2025 |
| DOB NOW | Plumbing | Signed-off | ZONE PLUMBING & HEATING C | 08/18/2025 |
| DOB NOW | Plumbing | Permit Issued | CC CONTROLLED PLBG CO.,IN | 08/15/2025 |
| DOB NOW | General Construction | Permit Issued | ROMANOV INC | 07/22/2025 |
| DOB NOW | General Construction | Permit Issued | C C CONTROLLED COMBUSTION | 03/12/2025 |
| DOB NOW | General Construction | Permit Issued | PYRAMID RESTORATION NY LL | 11/04/2024 |
| DOB NOW | Plumbing | Signed-off | ZONE PLUMBING & HEATING C | 08/07/2024 |
| DOB NOW | General Construction | Permit Issued | ROMANOV INC | 07/30/2024 |
| DOB NOW | Plumbing | Permit Issued | CC CONTROLLED PLBG CO.,IN | 07/24/2024 |
| DOB NOW | General Construction | Permit Issued | C C CONTROLLED COMBUSTION | 03/04/2024 |
| DOB NOW | Plumbing | Permit Issued | CC CONTROLLED PLBG CO.,IN | 03/01/2024 |
| DOB NOW | General Construction | Signed-off | CR SAFETY GROUP | 09/28/2023 |
| DOB NOW | Plumbing | Signed-off | J&M PLUMBING OF WESTCHEST | 09/28/2023 |
| DOB NOW | General Construction | Signed-off | EDR CONST MGMT | 05/17/2023 |
| DOB NOW | General Construction | Signed-off | BHD GROUP LLC | 07/07/2022 |
| DOB NOW | General Construction | Signed-off | TRANSITION MANAGEMENT COR | 06/02/2022 |
| DOB NOW | General Construction | Signed-off | EAST SIDE INTERIORS | 07/26/2021 |
| DOB NOW | Plumbing | Signed-off | FRED SMITH P&H CO INC | 07/09/2021 |
| DOB NOW | General Construction | Signed-off | H & D MAINTENANCE CO INC | 07/09/2021 |
| DOB NOW | Plumbing | Signed-off | LIQUID TECH PLBG&HTG,INC | 06/07/2021 |
| DOB NOW | General Construction | Permit Issued | KEL-MAR INTERIORS INC | 05/28/2021 |
| DOB NOW | Plumbing | Signed-off | ZEFI MECHANICAL INC | 03/12/2021 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 07/31/2020 |
| DOB NOW | Plumbing | Permit Issued | DEMAR PLUMBING CORP | 02/27/2020 |
| DOB NOW | Plumbing | Signed-off | ZEFI MECHANICAL INC | 01/07/2020 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/13/2026 | Permit Issued | ARISTA AIR CONDITIONING C | Air Conditioning Systems | Cooling Carrier 50FE-M07A2A5-0A0A0 72,000 BTU · Rooftop Unit ×1 |
| 06/17/2026 | Permit Issued | LINKED MECHANICAL LLC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MSZ-FX18NL 23,600 BTU · Fan Coil Indoor ×2 MSZ-FX06NL 9,000 BTU · Fan Coil Indoor ×1 MXZ-SM42NLHZ 48,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/02/2026 | — | — | Gas, Water/Sanitary |
| 07/15/2026 | Permit Issued | CC CONTROLLED PLBG CO.,IN | Gas, Water/Sanitary |
| 04/27/2026 | Permit Issued | PIPEWORKS NYC INC | Water/Sanitary |
| 01/23/2026 | Signed-off | P.S.I. MECHANICAL | Gas, Water/Sanitary |
| 12/24/2024 | Signed-off | 5 BORO'S PLUMBING INC | Gas, Water/Sanitary |
| 02/18/2020 | Permit Issued | DEMAR PLUMBING CORP | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/18/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 02/02/2026 | Complete | DCE CORPORATION | General Wiring |
| 12/04/2025 | Complete | ELECTRIC A/C INC | General Wiring |
| 10/24/2025 | Complete | GRX EURO ELECTRIC CORP | General Wiring |
| 09/02/2025 | Complete | ALL PURPOSE ELECTRIC CORP | — |
| 06/11/2024 | Complete | T. MCCAFFREY-T. MCGOVERN | General Wiring |
| 07/20/2023 | Permit Issued | ERRIGAL ELECTRICAL CORP | General Wiring |
| 07/06/2023 | Complete | AXON ELEC'L CONTRG CORP | General Wiring |
| 05/30/2023 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 02/10/2023 | Complete | ARC POWER ELECL CONTS INC | — |
| 08/02/2022 | Permit Issued | ROBERT CHIMENTI | 2 meters, 1 new_meters |
| 05/01/2020 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 03/04/2020 | Complete | BRONXDALE ELECTRIC INC | General Wiring |
| 02/28/2020 | Permit Issued | HECMAR ELECTRIC | General Wiring |
| 10/04/2019 | Complete | DUDLEY & ASSOC. LIC. ELEC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/26/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| 02/25/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 02/25/2026 | Signed-off | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/01/2026 | Permit Issued | STREAMLINE CONSULTANTS NY | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/10/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 06/30/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 06/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/08/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 11/20/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 11/14/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 09/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/29/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/11/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/11/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/11/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/07/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/28/2023 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 02/27/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/31/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/26/2022 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 10/08/2021 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/01/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/28/2021 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/07/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/26/2026 | Fire-Resistant Penetrations and Joints | AHMAD KHANZADA | special |
| 08/26/2026 | Energy Code Compliance Inspections | CHRISTOPHER CARSON | progress |
| 07/16/2026 | HVAC-R and service water heating system controls | Christian Meszaros | energy_progress |
| 07/16/2026 | HVAC-R and service water heating equipment | Christian Meszaros | energy_progress |
| 07/16/2026 | HVAC-R and service water piping design and insulation | Christian Meszaros | energy_progress |
| 07/16/2026 | Maintenance information | Christian Meszaros | energy_progress |
| 07/16/2026 | Tenant Protection Plan Compliance | Christian Meszaros | special |
| 07/16/2026 | Post-installed Anchors | Christian Meszaros | special |
| 07/13/2026 | Tenant Protection Plan Compliance | Obaid Mian | special |
| 07/08/2026 | HVAC-R and service water heating system controls | Christian Meszaros | energy_progress |
| 07/08/2026 | HVAC-R and service water heating equipment | Christian Meszaros | energy_progress |
| 07/08/2026 | Maintenance information | Christian Meszaros | energy_progress |
| 07/08/2026 | Tenant Protection Plan Compliance | — | special |
| 07/08/2026 | Post-installed Anchors | Christian Meszaros | special |
| 07/08/2026 | HVAC-R and service water piping design and insulation | Christian Meszaros | energy_progress |
| 06/02/2026 | Final | Obaid Mian | progress |
| 06/02/2026 | HVAC-R and service water heating system controls | Obaid Mian | energy_progress |
| 06/02/2026 | HVAC-R and service water piping design and insulation | Obaid Mian | energy_progress |
| 06/02/2026 | HVAC-R and service water heating equipment | Obaid Mian | energy_progress |
| 06/02/2026 | Mechanical Systems | Obaid Mian | special |
| 06/02/2026 | Maintenance information | Obaid Mian | energy_progress |
| 05/12/2026 | Energy Code Compliance Inspections | CHRISTOPHER CARSON | progress |
| 05/11/2026 | Fire-Resistance Rated Construction | CHRISTOPHER CARSON | progress |
| 04/23/2026 | Fire-Resistant Penetrations and Joints | AHMAD KHANZADA | special |
| 04/23/2026 | Post-installed Anchors | AHMAD KHANZADA | special |