← Back
Public elementary, junior or senior high
M.S. 61 Dr. Gladstone H. Atwell
360 EMPIRE BOULEVARD · BIN 3337872
💬 Discuss this project
1956Year Built
3Stories
W1Building Class
R7-1Zoning
149,945 sfGross Floor Area
3Units
LL97 Covered13 Open Violations 1 unresolved · 12 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 111,200 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction38p · 1 filing · 20 docs
Floor 3Under Construction38p · 1 filing · 20 docs
Floor 2Under Construction38p · 1 filing · 20 docs
Floor 1Under Construction42p · 3 filings · 20 docs
Basement4p · 2 filings · 20 docs
Sub-BasementUnder Construction34p · 1 filing · 20 docs
1 job · most recent 05/21/2026
Heating and Air Conditioning Systems Heating Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/21/2026Permit IssuedINTRICATE TECH SOLUTIONSHeating and Air Conditioning Systems, Heating Systems, Others, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-A18HA7 320 CFM · Fan Coil Indoor ×8
PKA-A24KA7 770 CFM · Fan Coil Indoor ×2
PKA-A36KA7 830 CFM · Fan Coil Indoor ×2
PUY-A18NHA7 18,000 BTU · Condensing Unit ×2
PUY-A24NHA7 770 CFM · Condensing Unit ×2
PUY-A36NKA7 830 CFM · Condensing Unit ×2
Heating
Changeair Sophomore E-AHP ERW IQ-O Cabinet 1,500 CFM · Heat Pump Outdoor ×126
Ventilation
Acme PV120 1,500 CFM ×4
PV165 3,400 CFM ×4
PNU185RF 4,700 CFM ×2
PV200 1,900 CFM ×2
PV300 3,800 CFM ×2
Minivent 450-VG 250 CFM · Erv ×4
Other
Mitsubishi Electric PKFY-P12NMAU 12,000 BTU · Vrf Indoor ×14
PKFY-P12NLMU 12,000 BTU · Vrf Indoor ×10
PEFY-P12NMAU 12,000 BTU · Vrf Indoor ×6
PKFY-P24NMLU 24,000 BTU · Vrf Indoor ×6
PUEFY-P18NMLU 18,000 BTU · Vrf Indoor ×6
PUEFY-P12NMLU 12,000 BTU · Vrf Indoor ×4
PURY-EP144YNU-A 144,000 BTU · Vrf Outdoor ×4
PKFY-P12NMLU 12,000 BTU · Vrf Indoor ×2
PUEFY-P24NMLU 24,000 BTU · Vrf Indoor ×2
PUEFY-P36NMLU 36,000 BTU · Vrf Indoor ×2
PURY-EP72YNU-A 72,000 BTU · Vrf Outdoor ×2
PURY-EP96YNU-A 96,000 BTU · Vrf Outdoor ×2
1 job · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026Permit IssuedVITAL PLUMBING, INC7 heads
2 jobs · most recent 05/21/2026
Water/Sanitary Plumbing-Sprinkler Storm
FiledStatusContractorScope
05/21/2026Permit IssuedVITAL PLUMBING, INCPlumbing-Sprinkler, Storm, Water/Sanitary
02/14/2022——Water/Sanitary
16 jobs · most recent 07/08/2026
General Wiring Lighting
FiledStatusContractorScope
07/08/2026CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/21/2026Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
12/30/2025Permit IssuedKLK ELECTRIC, INC—
12/02/2025Permit IssuedMILAD CONTRACTING CORP.General Wiring, Lighting
06/26/2025CompleteEVEREST ELECTRIC CORP—
05/18/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/29/2022CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
11/18/2022CompleteDIAZ ELECTRIC OF NEW YORKGeneral Wiring
08/18/2020Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
08/13/2020CompleteTRIBECA ELECTRICAL CORPGeneral Wiring
03/17/2020Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
05/08/2019CompleteCHARAN ELEC'L ENTERP'S IN—
03/13/2019CompleteCHARAN ELEC'L ENTERP'S IN—
01/30/2019CompleteCHARAN ELEC'L ENTERP'S IN—
10/10/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 jobs · most recent 05/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/21/2026Permit IssuedINTRICATE TECH SOLUTIONSSteel, Concrete, Masonry
10/07/2025Permit IssuedADAM'S EUROPEAN CONTRACTI2 scope_items
2 jobs · most recent 04/15/2026
Scaffold Fence
FiledStatusContractorScope
04/15/2026Permit IssuedRAVEN CONSTRUCTION SERVICScaffold
12/01/2025Permit IssuedADAM'S EUROPEAN CONTRACTIFence
1 job · most recent 04/28/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/28/2026——Suspended Scaffold (SC)
Building Lifecycle
All (177)Filed (26)Permit Issued (19)Signed Off (3)Violation (60)Inspection (3)Objection (36)Special Inspection (30)
06/24/2026
Permit issued — Mechanical Systems
B00779536-S2-MS
06/23/2026
Violation issued (ECB, open)
Construction
06/23/2026
Violation issued (ECB, open)
Construction
06/11/2026
Permit issued — Sprinklers
B00779536-S4-EW-SP
05/21/2026
Filed — Alteration
Install VPHPs and associated ductwork and install VRFs, replacement of all existing gas and fuel fired heating and ventilation appliances in the school building with new electric powered heat pump type air conditioning systems and and associated ductwork.
B00779536-S4
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
05/19/2026
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
05/12/2026
Special inspection requirement — Sprinkler Systems
Hakeem Alshawabkeh
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Objection raised — Other
04/28/2026
Filed — Alteration
SC/IS61K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SUSPENDED SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01392704-I1
04/24/2026
Special inspection requirement — Post-installed Anchors
HAKEEM ALSHAWABKEH
04/17/2026
Objection raised — Other
04/15/2026
Filed — Alteration
SF/IS61K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01228878-P1
03/24/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
03/12/2026
Permit issued — Plumbing
B00779536-S3-PL
02/27/2026
Permit issued — Mechanical Systems
B00779536-S2-MS
02/19/2026
Permit issued — General Construction
B00779536-I1-GC
01/22/2026
Permit issued — Supported Scaffold
B01228878-I1-SF
01/22/2026
Permit issued — Sidewalk Shed
B01228875-I1-SH
01/21/2026
Permit issued — Support of Excavation
B01294681-I1-SE
12/30/2025
Permit issued — Construction Fence
B01228868-I1-FN
12/15/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/09/2025
Objection raised — Other
12/09/2025
Objection raised — Other
12/01/2025
Filed — Alteration
SF/IS61K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01228878-I1
12/01/2025
Filed — Alteration
SH/IS61K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01228875-I1
12/01/2025
Filed — Alteration
FN/IS61K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536 B01294681. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01228868-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2025
Objection resolved — Addressed
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/09/2025
Objection raised — Other
10/07/2025
Filed — Alteration
SOE/IS61K - FOR SUPPORT OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # B00779536. B01228868 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01294681-I1
09/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
09/17/2025
Violation issued (FDNY_ORDER, closed)
08/25/2025
Signed off — Alteration
Remove exist. sink. Protect exist piping to remain during construction. Provide new domestic & sanitary piping, Flood stopper valve for hot water connect. Provide hot box washing mach connect, and sufficient sanitary piping for washing mach discharge.
B00701429-I1
08/25/2025
Signed off — Alteration
Remove exist. sink. Protect exist piping to remain during construction. Provide new domestic & sanitary piping, Flood stopper valve for hot water connect. Provide hot box washing mach connect, and sufficient sanitary piping for washing mach discharge.
B00701429-S2
08/25/2025
Signed off — Alteration
Remove exist. sink. Protect exist piping to remain during construction. Provide new domestic & sanitary piping, Flood stopper valve for hot water connect. Provide hot box washing mach connect, and sufficient sanitary piping for washing mach discharge.
B00701429-S1
08/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/15/2025
Violation issued (ECB, open)
Construction
05/20/2025
Special inspection requirement — Post-installed Anchors
Maxim Korngold
05/13/2025
Violation issued (ECB, open)
Construction
04/14/2025
Violation issued (FDNY_NOV, closed)
02/25/2025
Special inspection requirement — Structural Steel - Details
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Structural Steel - Welding
MIKHAIL ZEYGMAN
02/25/2025
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
Latest 60 of 177 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4507/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DOE 040203/22/2026
D.O.E. I.S.61 0403/22/2026
DEPT OF EDUCATION I.S.61603/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DOE IS 61 040603/22/2026
P.S. 61 D.O.E203/22/2026
P.S. 061 DOE303/22/2026
PS 61 DEPT OF EDUCATION04303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC HEALTH HOSPITALS203/21/2026
DSENY ENGINEERING SERVICES803/21/2026
SUPERSTRUCTURES ENG + ARCH803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE CONTROL ABATEMENTGeneral Contractor807/08/2026
U & I MECHANICAL CORPGeneral Contractor307/08/2026
MAR-SAL PLBG & HTG, INCPlumbing307/08/2026
ADAM'S EUROPEAN CONTRACTINGGeneral Contractor307/08/2026
RAVEN CONSTRUCTION SERVICGeneral Contractor204/09/2026
INTRICATE TECH SOLUTIONSGeneral Contractor206/27/2026
VITAL PLUMBING, INCPlumbing107/08/2026
GIOVANNI DITURIElectrical103/21/2026
VITAL PLUMBING, INCFire Protection107/08/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317805/21/2026
FUTURE TECH CONSULTANTS O5891308/13/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedINTRICATE TECH SOLUTIONS06/24/2026
DOB NOWSprinklersPermit IssuedVITAL PLUMBING, INC06/11/2026
DOB NOWPlumbingPermit IssuedVITAL PLUMBING, INC03/12/2026
DOB NOWMechanical SystemsPermit IssuedINTRICATE TECH SOLUTIONS02/27/2026
DOB NOWGeneral ConstructionPermit IssuedADAM'S EUROPEAN CONTRACTING02/19/2026
DOB NOWSupported ScaffoldPermit IssuedRAVEN CONSTRUCTION SERVIC01/22/2026
DOB NOWSidewalk ShedPermit IssuedRAVEN CONSTRUCTION SERVIC01/22/2026
DOB NOWSupport of ExcavationPermit IssuedADAM'S EUROPEAN CONTRACTING01/21/2026
DOB NOWConstruction FencePermit IssuedADAM'S EUROPEAN CONTRACTING12/30/2025
DOB NOWGeneral ConstructionSigned-offEMPIRE CONTROL ABATEMENT09/18/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CONTROL ABATEMENT05/20/2024
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC02/01/2024
DOB NOWMechanical SystemsSigned-offU & I MECHANICAL CORP05/01/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE CONTROL ABATEMENT04/14/2023
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC09/15/2022
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC05/05/2022
DOB NOWMechanical SystemsSigned-offU & I MECHANICAL CORP05/02/2022
DOB NOWGeneral ConstructionSigned-offEMPIRE CONTROL ABATEMENT04/22/2022
DOB NOWMechanical SystemsSigned-offEMPIRE CONTROL ABATEMENT04/22/2022
BISOTISSUEDFIVE STAR ELECTRIC CORP06/19/2014
BISPLISSUEDVITAL PLUMBING, INC08/20/2012
BISEQISSUEDCENTRAL MECHANICAL SYSTEMS INC06/05/2012
BISMHISSUEDCHAPMAN & EVANS CONTRACT04/17/2012
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/05/2012
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/05/2012
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC04/05/2012
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC03/06/2012
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC03/06/2012
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC03/06/2012
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC08/12/2011
BISFBISSUEDVITAL PLUMBING, INC08/12/2011
BISEQISSUEDCENTRAL MECHANICAL SYSTEMS INC08/12/2011
BISPLISSUEDVITAL PLUMBING, INC08/12/2011
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC08/12/2011
BISPLISSUEDLAFATA CORALLO P & H INC08/05/2011
BISSPISSUEDLAFATA-CORALLO PLBG & HTG08/05/2011
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC07/05/2011
BISPLISSUEDDEWATERS PBG&HTGLLC03/25/2010
BISOTISSUEDICS BUILDERS, INC03/25/2010
BISSPISSUEDLAFATA-CORALLO PLBG & HTG09/08/2009
+ 11 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
05/19/2026Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
05/19/2026Post-installed AnchorsHakeem Alshawabkehspecial
05/12/2026Sprinkler SystemsHakeem Alshawabkehspecial
04/24/2026Post-installed AnchorsHAKEEM ALSHAWABKEHspecial
03/24/2026Post-installed AnchorsMAXIM KORNGOLDspecial
09/29/2025Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
05/20/2025Post-installed AnchorsMaxim Korngoldspecial
02/25/2025Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
02/25/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/25/2025Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
02/25/2025Structural Steel - WeldingMIKHAIL ZEYGMANspecial
02/25/2025Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
02/25/2025Subsurface Conditions – Fill Placement & In-Place Density—special
02/25/2025Sprayed fire-resistant materialsMIKHAIL ZEYGMANspecial
02/25/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
02/25/2025FinalMIKHAIL ZEYGMANprogress
02/25/2025Subgrade InspectionsMIKHAIL ZEYGMANspecial
02/25/2025Structural Steel - DetailsMIKHAIL ZEYGMANspecial
02/25/2025MasonryMIKHAIL ZEYGMANspecial
08/14/2024Fire-Resistance Rated ConstructionHAKEEM ALSHAWABKEHprogress
08/14/2024Fire-Resistant Penetrations and JointsHAKEEM ALSHAWABKEHspecial
08/14/2024MasonryHAKEEM ALSHAWABKEHspecial
08/14/2024Structural Stability – Alterations of existing buildingsHAKEEM ALSHAWABKEHspecial
08/14/2024Post-installed AnchorsHAKEEM ALSHAWABKEHspecial
08/14/2024Wall Panels, Curtain Walls, and VeneersHAKEEM ALSHAWABKEHspecial
Latest 25 of 73.
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/31/2026B00671072-S1Request digital key ↗
08/30/2026B00701429-P5Request digital key ↗
08/20/2026B01294681-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/31/2026B00671072-I1Open ↗
08/31/2026B00671072-S3Open ↗
08/31/2026B00671072-S1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/28/2026B01392704-I1Open ↗
09/23/2026B00779536-I1Open ↗
09/02/2026B00779536-S3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00779536-I1Open ↗
08/31/2026B00779536-S2Open ↗
08/24/2026B00701429-P5Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/19/2026B01228878-P1Open ↗
08/13/2026B01228878-I1Open ↗
08/13/2026B01228868-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026B00701429-S2Open ↗
08/14/2026B00701429-S1Open ↗
▸Approvals, Objections & Sign-offs70
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/31/2026B00671072-S1Open ↗
08/30/2026B00701429-P5Open ↗
08/19/2026B01228878-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
08/31/2026B00671072-S1Open ↗
08/30/2026B00701429-P5Open ↗
08/19/2026B01228878-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)11
08/31/2026B00671072-S1Open ↗
08/16/2026B00779536-S4Open ↗
08/15/2026B00701429-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/16/2026B00779536-S4Open ↗
08/15/2026B00701429-I1Open ↗
08/15/2026B00701429-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents37
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal26
08/31/2026B00671072-S1Open ↗
08/30/2026B00701429-P5Open ↗
08/19/2026B01228878-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProof of Historic Building5
08/16/2026B00779536-I1Open ↗
08/15/2026B00701429-I1Open ↗
08/14/2026B00701429-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/15/2026B00701429-I1Open ↗
08/15/2026B00701429-S2Open ↗
08/14/2026B00701429-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/15/2026B01392704-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01294681-I1Open ↗
▸DOB NOWCalculations1
08/15/2026B01392704-I1Open ↗