Elevator apt, fireproof with stores
Stuy Town Peter Cooper Village
360 FIRST AVENUE · BIN 1083681
💬 Discuss this project
1947Year Built
15Stories
D6Building Class
R7-2Zoning
3,122,165 sfGross Floor Area
2,498Units
LL97 CoveredRent Stabilized29 Active Violations 28 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: BPP PCV Owner · 828,650 sf lot · 3.77 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBpp Pcv Owner LLC1 filing
Floor 14Unit 13E1 filing · 10 docs
Floor 13Unit 12D2 filings · 7 docs
Floor 12
Floor 11Unit 10B2 filings · 9 docs
Floor 10Unit 9E2 filings · 13 docs
Floor 9Unit 8D, Unit 8GUnder Construction3 filings · 20 docs
Floor 8
Floor 7Unit 6A2 filings · 7 docs
Floor 6Unit 5H1 filing · 12 docs
Floor 5
Floor 4
Floor 3Unit 2A, Unit 2B, Unit 2H6 filings · 20 docs
Floor 2Unit 1D2 filings · 9 docs
Floor 1Bpp Pcv Owner LLC1 filing · 11 docs
Filed — no permit issuedBpp Pcv Owner LLC2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BPP PCV Owner17610/06/2026
Tishman/Speyer PCVST Management1803/21/2026
Rose Associates Inc Manager1103/21/2026
Metropolitan Life Insurance Co803/21/2026
P.C.V./St LLC C/O Rein403/21/2026
Corner Realty203/21/2026
Met Life Ins Co203/21/2026
Blackstone Developers103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$1.3B—PCVST-DIL LLC → BPP PCV Owner$431/sf building
06/03/2014$1.1B—— → —$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Building Studio Architects3308/24/2026
Sandeep Gunnala Engineering107/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Beam Living2903/21/2026
Sandeep Gunnala Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Super G ConstructionGeneral Contractor1707/08/2026
AP Plumbing & HVACPlumbing1007/08/2026
Dellapeak InteriorsGeneral Contractor607/08/2026
Crre Town and VillageGeneral Contractor507/08/2026
Northeast Plumbing & HeatingPlumbing410/06/2026
Atlas-Acon Electric ServiceElectrical303/21/2026
Millennium Maintenance & ElectricalElectrical303/21/2026
K & M Electrical Contng IElectrical203/21/2026
Innovative Heating SolutiPlumbing207/08/2026
VTL Electric CoElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
Atlas-Acon Electric ServiceElectrical103/22/2026
Ask Electl ContrtngElectrical103/22/2026
VTL Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Building Studio Architect5922308/24/2026
Sandeep Gunnala Engineering8482307/10/2026
Building Lifecycle
All (201)Filed (36)Permit Issued (33)Signed Off (16)Facade (FISP) (15)Violation (49)Inspection (17)Objection (5)Special Inspection (30)
10/05/2026
Permit issued — Plumbing
M01447474-S1-PL
09/04/2026
Signed off — Alteration
General construction for interior renovation of Apartment 5H on the 6th floor as shown on drawings filed herewith. No change in use, egress or occpupancy.
M01380438-S1
09/04/2026
Signed off — Alteration
General construction for interior renovation of Apartment 5H on the 6th floor as shown on drawings filed herewith. No change in use, egress or occpupancy.
M01380438-I1
09/01/2026
Permit issued — General Construction
M01447474-I1-GC
08/24/2026
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 8G on the 9th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01447474-S1
08/24/2026
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 8G on the 9th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01447474-I1
08/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
John Field
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
08/24/2026
Special inspection requirement — Final
John Field
08/24/2026
Special inspection requirement — Lighting in dwelling units
John Field
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
08/04/2026
Violation issued (HPD, open)
B
08/04/2026
Violation issued (HPD, open)
B
08/04/2026
Violation issued (HPD, closed)
C
07/10/2026
Filed — Alteration
Filing for limited FISP facade repairs at 360 First Avenue as shown on drawings filed herewith. No change in use, egress, or occupancy.
M01353806-I1
06/25/2026
Special inspection requirement — Masonry
Sandeep Gunnala
06/25/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
06/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sandeep Gunnala
06/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
06/25/2026
Special inspection requirement — Final
Sandeep Gunnala
05/12/2026
Permit issued — Plumbing
M01380438-S1-PL
04/24/2026
Permit issued — General Construction
M01380438-I1-GC
04/17/2026
Filed — Alteration
General construction for interior renovation of Apartment 5H on the 6th floor as shown on drawings filed herewith. No change in use, egress or occpupancy.
M01380438-S1
04/17/2026
Filed — Alteration
General construction for interior renovation of Apartment 5H on the 6th floor as shown on drawings filed herewith. No change in use, egress or occpupancy.
M01380438-I1
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
04/16/2026
Special inspection requirement — Lighting in dwelling units
John Field
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
John Field
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
04/15/2026
Special inspection requirement — Final
John Field
04/08/2026
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 8D on the 9th floor as shown on drawings filed herewith. No change in use, egress or occupancy. OT filed separately under M00777056-I1.
M00777058-I1
03/13/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/11/2026
Cycle 9 facade report submitted
02/11/2026
Cycle 9 facade report signed — SWARMP
02/04/2026
Cycle 9 facade inspection completed
01/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
John Field
01/05/2026
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 8D on the 9th floor as shown on drawings filed herewith. No change in use, egress or occupancy. OT filed separately under M00777056-I1.
M00777058-P1
01/01/2026
Violation issued (HPD, closed)
C
01/01/2026
Violation issued (HPD, closed)
B
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2025
Permit issued — Plumbing
M00777058-I1-PL
04/07/2025
Signed off — Alteration
Installation of plumbing fixtures and related piping as shown on drawings filed herewith. Filed in conjunction with Alt-CO M00643013-I1. No change in use, egress or occupancy.
M00627846-I1
03/25/2025
Objection raised — Other
03/20/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW 11 MASONRY FAADE REPAIR.
M01183718-P1
03/12/2025
Signed off — Alteration
General construction for interior renovation of Apartment 2B on the 3rd floor as shown on drawings filed herewith. PL filed separately under M01137207-I1. No change in use, egress or occupancy.
M01137184-I1
03/12/2025
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 2B on the 3rd floor as shown on drawings filed herewith. OT filed separately under M01137184-I1. No change in use, egress or occupancy.
M01137207-I1
03/03/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Admin
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNortheast Plumbing & Heating10/05/2026
DOB NOWGeneral ConstructionPermit IssuedSuper G Construction09/01/2026
DOB NOWPlumbingSigned-offNortheast Plumbing & Heating05/12/2026
DOB NOWGeneral ConstructionSigned-offSuper G Construction04/24/2026
DOB NOWPlumbingSigned-offNortheast Plumbing & Heating10/10/2025
DOB NOWPlumbingSigned-offNortheast Plumbing & Heating12/05/2024
DOB NOWGeneral ConstructionSigned-offSuper G Construction11/25/2024
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating08/17/2023
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating04/05/2023
DOB NOWGeneral ConstructionSigned-offSuper G Construction03/10/2023
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating01/12/2023
DOB NOWGeneral ConstructionSigned-offSuper G Construction12/28/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating08/30/2022
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating08/30/2022
DOB NOWGeneral ConstructionSigned-offSuper G Construction08/08/2022
DOB NOWGeneral ConstructionSigned-offSuper G Construction08/05/2022
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating05/25/2022
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating04/27/2022
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating04/27/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating04/08/2022
DOB NOWGeneral ConstructionSigned-offSuper G Construction03/29/2022
DOB NOWGeneral ConstructionSigned-offSuper G Construction03/25/2022
DOB NOWMechanical SystemsPermit IssuedSuper G Construction03/07/2022
DOB NOWMechanical SystemsSigned-offCrre Town and Village10/07/2021
DOB NOWMechanical SystemsSigned-offCrre Town and Village07/06/2021
DOB NOWMechanical SystemsSigned-offCrre Town and Village01/08/2021
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating10/13/2020
DOB NOWMechanical SystemsSigned-offDellapeak Interiors02/13/2020
DOB NOWMechanical SystemsSigned-offDellapeak Interiors02/13/2020
DOB NOWPlumbingSigned-offMitie Plumbing & Heating01/30/2020
DOB NOWPlumbingPermit IssuedMitie Plumbing & Heating01/30/2020
DOB NOWMechanical SystemsSigned-offDellapeak Interiors01/29/2020
DOB NOWMechanical SystemsSigned-offDellapeak Interiors01/28/2020
BISOTISSUEDCrre Town and Village09/26/2024
BISOTISSUEDCrre Town and Village09/26/2023
BISOTISSUEDCrre Town and Village11/03/2022
BISOTISSUEDCrre Town and Village10/08/2021
BISOTISSUEDCrre Town and Village10/06/2021
BISOTISSUEDCrre Town and Village07/06/2021
BISOTISSUEDCrre Town and Village01/13/2021
+ 43 more permits on file
6 projects · most recent 08/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/24/2026Permit IssuedNortheast Plumbing & HeatingGas, Water/Sanitary
04/17/2026Signed-offNortheast Plumbing & HeatingGas, Water/Sanitary
08/03/2022Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
03/30/2022Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
03/28/2022Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
01/15/2020Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
25 projects · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedElectrical SolutionsGeneral Wiring
06/16/2026Permit IssuedElectrical SolutionsGeneral Wiring
05/27/2026Permit IssuedElectrical SolutionsGeneral Wiring
11/05/2025CompleteElectrical SolutionsGeneral Wiring
12/12/2024CompleteElectrical SolutionsGeneral Wiring
12/03/2024CompleteElectrical SolutionsGeneral Wiring
10/19/2023CompleteElectrical SolutionsGeneral Wiring
09/06/2023CompleteAtlas-Acon Electric Service—
03/31/2023CompleteElectrical SolutionsGeneral Wiring
02/15/2023CompleteElectrical SolutionsGeneral Wiring
02/10/2023CompleteElectrical SolutionsGeneral Wiring
10/12/2022CompleteElectrical SolutionsGeneral Wiring
10/12/2022CompleteElectrical SolutionsGeneral Wiring
05/20/2022Permit IssuedVertex ElectricGeneral Wiring
04/19/2022CompleteElectrical SolutionsGeneral Wiring
1 project · most recent 08/24/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/24/2026Permit IssuedNortheast Plumbing & HeatingTenant Protection Plan 72 Hour
1 project · most recent 03/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/20/2025——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
03/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/20/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/02/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
08/24/2026HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
08/24/2026Tenant Protection Plan ComplianceJohn Fieldspecial
08/24/2026Energy Code Compliance InspectionsJohn Fieldprogress
08/24/2026FinalJohn Fieldprogress
08/24/2026Lighting in dwelling unitsJohn Fieldenergy_progress
08/24/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
08/24/2026Tenant Protection Plan ComplianceJohn Fieldspecial
08/24/2026Energy Code Compliance InspectionsJohn Fieldprogress
06/25/2026MasonrySandeep Gunnalaspecial
06/25/2026Post-installed AnchorsSandeep Gunnalaspecial
06/25/2026Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
06/25/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
06/25/2026FinalSandeep Gunnalaprogress
04/16/2026Tenant Protection Plan ComplianceJohn Fieldspecial
04/16/2026Lighting in dwelling unitsJohn Fieldenergy_progress
04/16/2026Energy Code Compliance InspectionsJohn Fieldprogress
04/16/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
04/16/2026Tenant Protection Plan ComplianceJohn Fieldspecial
04/16/2026HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
04/16/2026Energy Code Compliance InspectionsJohn Fieldprogress
04/16/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
04/15/2026FinalJohn Fieldprogress
01/06/2026Energy Code Compliance InspectionsJohn Fieldprogress
01/06/2026HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
Latest 25 of 56.
▾Documents — 805 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch28
09/02/2026M00698016-I1Request digital key ↗
09/02/2026M00699160-I1Request digital key ↗
09/02/2026M00698768-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00280942-I1Request digital key ↗
09/04/2026M00280873-I1Request digital key ↗
09/04/2026M00366037-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00284865-I1Request digital key ↗
09/05/2026M00284480-I1Request digital key ↗
08/15/2026M00284480-P1Request digital key ↗
▸Applications & Permits127
▸BISPLAN / WORK APPROVAL APPLICATION69
02/23/2026102999668Open ↗
12/30/2025102999668Open ↗
11/17/2025102999668Open ↗
Showing 3 of 69 on file for this type
▸BISWORK PERMIT APPLICATION58
01/13/2021123725932Open ↗
11/06/2020123807924Open ↗
07/20/2020140924775Open ↗
Showing 3 of 58 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications221
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
01/07/2020123725932Open ↗
12/24/2019123725978Open ↗
10/30/2019123476274Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00280942-I1Open ↗
09/05/2026M00284480-I1Open ↗
09/04/2026M00366037-I1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
12/24/2019123725978Open ↗
12/24/2019123725932Open ↗
06/11/2019123898363Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
10/04/2026M01137184-I1Open ↗
10/04/2026M01137184-I1Open ↗
09/25/2026M00777006-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
07/15/2020140924775Open ↗
12/24/2019123725932Open ↗
06/11/2019123898363Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
10/04/2026M01137184-I1Open ↗
09/25/2026M00777006-I1Open ↗
09/23/2026M01447474-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/15/2020140924775Open ↗
05/23/2019140850247Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/15/2020140924775Open ↗
05/23/2019140850247Open ↗
Showing 2 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
12/24/2019123725978Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
10/22/2019123476274Open ↗
06/11/2019123898363Open ↗
06/05/2019123897827Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection28
▸BISTenant Protection Plan and Notes18
12/24/2019123725978Open ↗
12/24/2019123725932Open ↗
06/11/2019123898363Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan8
09/05/2026M00284480-I1Open ↗
09/04/2026M00366037-I1Open ↗
09/04/2026M00366037-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00643013-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00643013-I1Open ↗
▸Environmental & Asbestos69
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/05/2026M00280942-I1Open ↗
09/05/2026M00284480-I1Open ↗
09/04/2026M00366037-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
07/15/2020140924775Open ↗
01/07/2020123725932Open ↗
06/11/2019123898363Open ↗
Showing 3 of 18 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026M00627846-I1Open ↗
08/13/2026M00643013-I1Open ↗
▸Energy Compliance79
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
01/07/2020123725932Open ↗
12/24/2019123725978Open ↗
10/30/2019123476274Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
06/02/2021123807924Open ↗
01/19/2021123725978Open ↗
12/09/2020140924775Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
06/02/2021123807924Open ↗
01/19/2021123725978Open ↗
12/09/2020140924775Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis6
09/02/2026M00777058-I1Open ↗
08/13/2026M00777006-I1Open ↗
08/13/2026M00643013-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/06/2025123502094Open ↗
11/29/2022123725932Open ↗
07/09/2020123497260Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/15/2020140924775Open ↗
05/23/2019140850247Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
01/06/2025123502094Open ↗
11/29/2022123725932Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/29/2022123725932Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/02/2021123807924Open ↗
01/19/2021123725978Open ↗
12/09/2020140924775Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/06/2025123502094Open ↗
11/29/2022123725932Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
01/09/2025123502094Open ↗
12/07/2022123725932Open ↗
06/02/2021123807924Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSUPERSEDING LETTER4
01/13/2021123725932Open ↗
11/06/2020123807924Open ↗
10/19/2020140924775Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
01/06/2025123502094Open ↗
11/29/2022123725932Open ↗
▸Cost, Insurance & Ownership87
▸BISCOST AFFIDAVIT70
04/07/2022102813779Open ↗
06/02/2021123807924Open ↗
01/19/2021123725978Open ↗
Showing 3 of 70 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/09/2025123502094Open ↗
12/06/2022123725932Open ↗
07/09/2020123497260Open ↗
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET32
12/24/2019123725978Open ↗
12/24/2019123725932Open ↗
06/11/2019123898363Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM19
11/06/2020123807924Open ↗
10/30/2019123476274Open ↗
10/15/2019123497260Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION13
07/24/2020123725978Open ↗
12/24/2019123725978Open ↗
12/24/2019123725932Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/15/2020140924775Open ↗
05/23/2019140850247Open ↗
Showing 2 of 5 on file for this type
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/13/2026M01183718-I1Open ↗
08/13/2026M01183718-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01183718-P1Open ↗
08/13/2026M01183718-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026M00643013-I1Open ↗