← Back
Two family converted from one family
360 JEFFERSON AVENUE
BROOKLYN · BIN 3052420
💬 Discuss this project
1905Year Built
3Stories
B3Building Class
R6BZoning
3,620 sfGross Floor Area
2Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,900 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof10p · 2 filings · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar10p · 2 filings · 20 docs
Basement7p · 1 filing · 20 docs
1 job · most recent 11/01/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/01/2024Signed-offPANDA HVAC INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PKFY-P18NLMU-E 20,000 BTU · Vrf Indoor ×5
PEFY-P24NMAU-E3 30,000 BTU · Vrf Indoor ×3
PUMY-HP48NKMU 54,000 BTU · Vrf Outdoor ×3
PKFY-P24NLMU-E 27,000 BTU · Vrf Indoor ×2
MXZ-3C24NAH72 25,000 BTU · Vrf Outdoor ×1
PUMY-P60NKMU2 66,000 BTU · Vrf Outdoor ×1
2 jobs · most recent 12/16/2022
General Wiring
FiledStatusContractorScope
12/16/2022CompleteA.L. ELECTRICAL CORP.General Wiring
08/19/2022CancelledDENMAR ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (170)Filed (13)Permit Issued (5)Signed Off (4)Violation (29)Inspection (13)Objection (76)Special Inspection (30)
03/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
11/04/2024
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
11/04/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
11/04/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
11/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
11/04/2024
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
11/04/2024
Special inspection requirement — Permanent certificate
DOYUN KIM
11/04/2024
Special inspection requirement — Lighting controls
DOYUN KIM
11/04/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
11/04/2024
Special inspection requirement — Maintenance information
DOYUN KIM
11/04/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
11/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
11/01/2024
Filed — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-P7
11/01/2024
Special inspection requirement — Permanent certificate
DOYUN KIM
11/01/2024
Special inspection requirement — Insulation placement and R values
DOYUN KIM
11/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
11/01/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
11/01/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
11/01/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
11/01/2024
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
11/01/2024
Special inspection requirement — Lighting controls
DOYUN KIM
11/01/2024
Special inspection requirement — Lighting in dwelling units
DOYUN KIM
11/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
11/01/2024
Special inspection requirement — Maintenance information
DOYUN KIM
11/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
10/21/2024
Filed — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-P6
09/25/2024
Filed — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-P5
09/24/2024
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
06/27/2024
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
06/11/2024
Signed off — Alteration
INTERIOR NON STRUCTURAL DEMO
B07997563-I1
06/05/2024
Filed — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-P4
04/10/2024
Violation issued (HPD, closed)
A
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2024
Signed off — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-S1
02/07/2024
Objection resolved — Addressed
01/23/2024
Permit issued — Mechanical Systems
B00829254-S1-MS
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/12/2024
Permit issued — Structural
B07997563-I1-ST
01/12/2024
Objection raised — Scope
01/12/2024
Objection raised — Scope
01/12/2024
Objection raised — Scope
01/12/2024
Objection raised — Zoning
01/09/2024
Filed — Alteration CO
HEREWITH TO PROPOSE MECHANICAL SYSTEMS AS PER PLANS, IN CONJUNCTION WITH DOB # B00829254
B00829254-P3
12/28/2023
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR A 2 FAMILY DWELLING IN CONJUNCTION WITH B00829254-I1
B00863699-I1
12/28/2023
Signed off — Alteration
HEREWITH TO PROPOSE PL SYSTEMS AS PER CONSTRUCTION PLANS, IN CONJUNCTION WITH DOB # B00829254.
B07998964-I1
12/01/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/29/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2023
Violation issued (HPD, closed)
I
Latest 60 of 170 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2021$1.9M—Private party → Private party$513/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VESTA CONSTRUCTION, INCGeneral Contractor407/08/2026
MEGA PLBG CORPFire Protection107/08/2026
PANDA HVAC INCGeneral Contractor107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA74151211/01/2024
FORUM ENGINEERING, P. C.907107/22/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPANDA HVAC INC01/23/2024
DOB NOWStructuralSigned-offVESTA CONSTRUCTION, INC01/12/2024
DOB NOWPlumbingSigned-offNICE PLUMBING CORP07/27/2023
DOB NOWSprinklersSigned-offREAL PLUMBING CORP07/07/2023
DOB NOWGeneral ConstructionPermit IssuedVESTA CONSTRUCTION, INC06/05/2023
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Fail-Final Construction Permit WithdrawalFailView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
11/04/2024Lighting in dwelling unitsDOYUN KIMenergy_progress
11/04/2024Permanent certificateDOYUN KIMenergy_progress
11/04/2024Concrete - Cast-In-PlaceDOYUN KIMspecial
11/04/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
11/04/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
11/04/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
11/04/2024Energy Code Compliance InspectionsDOYUN KIMprogress
11/04/2024Interior lighting powerDOYUN KIMenergy_progress
11/04/2024Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
11/04/2024Fenestration air leakageDOYUN KIMenergy_progress
11/04/2024Maintenance informationDOYUN KIMenergy_progress
11/04/2024Fenestration areasDOYUN KIMenergy_progress
11/04/2024Insulation placement and R valuesDOYUN KIMenergy_progress
11/04/2024Lighting controlsDOYUN KIMenergy_progress
11/01/2024Lighting controlsDOYUN KIMenergy_progress
11/01/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
11/01/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
11/01/2024Energy Code Compliance InspectionsDOYUN KIMprogress
11/01/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
11/01/2024Fenestration areasDOYUN KIMenergy_progress
11/01/2024Permanent certificateDOYUN KIMenergy_progress
11/01/2024Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
11/01/2024Maintenance informationDOYUN KIMenergy_progress
11/01/2024Lighting in dwelling unitsDOYUN KIMenergy_progress
11/01/2024Concrete - Cast-In-PlaceDOYUN KIMspecial
Latest 25 of 92.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B07997563-I1Request digital key ↗
08/27/2026B00863699-P1Request digital key ↗
08/27/2026B00863699-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)7
08/13/2026B00829254-P7Open ↗
08/13/2026B00829254-P6Open ↗
08/13/2026B00829254-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00829254-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026B00746021-I1Open ↗
08/30/2026B00863699-I1Open ↗
08/28/2026B00829254-P5Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026B00746021-I1Open ↗
09/02/2026B00746021-I1Open ↗
08/28/2026B00829254-P5Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00746021-I1Open ↗
08/28/2026B07997563-I1Open ↗
08/27/2026B00863699-I1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist8
08/15/2026B00746021-I1Open ↗
08/13/2026B00829254-P5Open ↗
08/13/2026B00829254-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00829254-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00829254-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00829254-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B07997563-I1Open ↗
08/27/2026B00863699-P1Open ↗
08/27/2026B00863699-I1Open ↗
Showing 3 of 13 on file for this type
▸Other Documents13
▸DOB NOWProperty Ownership Certification8
08/27/2026B00829254-P5Open ↗
08/27/2026B00829254-P7Open ↗
08/27/2026B00829254-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWWaiver Document4
08/13/2026B00829254-P7Open ↗
08/13/2026B00829254-I1Open ↗
08/13/2026B00829254-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00829254-I1Open ↗