← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
London Towne House
360 WEST 22ND STREET · BIN 1013332
💬 Discuss this project
1965Year Built
16Stories
RMBuilding Class
R7BZoning
210,014 sfGross Floor Area
220Units
LL97 CoveredRent Stabilized15 Active Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 19,750 sf lot · 10.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects360 West 22nd Street Owners IncUnder Construction3 filings
RoofSidewalk bridging installationUnder Construction2p · 2 filings
Floor 16Unit 16A, Unit 16E, Unit 17E3 filings
Floor 15Unit 15D, Unit 15E, Unit 16F3 filings
Floor 14Unit 14F, Unit 14G2 filings
Floor 13
Floor 12
Floor 11Unit 11E1p · 2 filings
Floor 10Unit 10E2 filings
Floor 9Gomez Stolk & Harpin, Unit 9E, Unit 9K3 filings
Floor 8
Floor 7
Floor 6
Floor 5Unit 5J2p · 1 filing
Floor 4Interior renovation1 filing
Floor 3Unit 3E, Unit 3H, Unit 3J +14 filings
Floor 2
Floor 1Friedman Management CO.2 filings
CellarChiller replacement1p · 1 filing
Sub-Basement2 filings · 10 docs
Site & exteriorSidewalk bridging installationUnder Construction4 filings · 12 docs
Filed — no permit issuedNew interior partition and door installation1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
360 West 22nd St Owners8203/21/2026
Rite Aid1003/21/2026
S&E Maintenance703/21/2026
London Towne House Associates L P403/21/2026
360 West 22 Street403/21/2026
Penmark Realty303/21/2026
LTH Association303/21/2026
360 W 22nd Owners Inc Penmark203/21/2026
Oratrop103/22/2026
Arw Construction103/22/2026
1235 Park Condominiums103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting2203/21/2026
Sol Building Consulting Services1303/21/2026
Midtown Preservation Architecture203/21/2026
Highrise Group203/21/2026
CB403/21/2026
Code403/21/2026
Municipal Building Consultants103/21/2026
Commercial Capital USA403/21/2026
J Callahan Consulting403/21/2026
Swa Architecture203/21/2026
CM3 Design Studio403/21/2026
DY Expediting403/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spire Scaffolding & HoistScaffold507/08/2026
Innovative Ventures TeamGeneral Contractor407/08/2026
The Metro Group PlumbingPlumbing407/08/2026
Nilu Home Improvement NYGeneral Contractor303/21/2026
AM Building Restoration*General Contractor303/21/2026
Bellwood NYGeneral Contractor303/21/2026
Cube Builders Group NYGeneral Contractor303/21/2026
Paradise Construction GroupGeneral Contractor307/08/2026
DPH Plumbing & HeatingPlumbing307/08/2026
S.A.L. Electric CoElectrical203/22/2026
Flytiger P & HPlumbing207/08/2026
Just Plumbing & HeatingPlumbing207/08/2026
Orbit Plumbing & HeatingPlumbing208/25/2026
Crystal ComfortGeneral Contractor203/21/2026
P.S.I. MechanicalPlumbing207/08/2026
PipestylistsPlumbing207/08/2026
Scarponi & Son Plumbing & HeatingPlumbing207/08/2026
The Metro GroupGeneral Contractor204/09/2026
Xinos ConstructionGeneral Contractor104/09/2026
Rennon ConstructionScaffold107/08/2026
DVM Electrical ServicesElectrical103/22/2026
The Metro GroupScaffold104/09/2026
Xinos ConstructionScaffold104/09/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
Attractive Lighting ElectricalElectrical103/22/2026
Jay Helfgott ElectricElectrical103/21/2026
Jorden-Ash ElectricElectrical103/22/2026
J Y ElectricElectrical103/22/2026
KJK ElectricElectrical103/22/2026
NTS ElectricalElectrical103/22/2026
Lina ElectricElectrical103/21/2026
Irby ElectricElectrical103/21/2026
Thompson Electrical Main ServiceElectrical103/21/2026
Plumbing P & HPlumbing107/08/2026
G.P. Mechanicalspecialty_contractor107/08/2026
Glendale Electl ContngElectrical103/22/2026
A.davino Electrical Cont'g CoElectrical103/22/2026
NY Fine Interiors & WoodwGeneral Contractor106/28/2026
Orchid ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Group-S52161210/08/2026
Winton Group Architecture4343108/19/2026
Howard L Zimmerman Architects1712103/25/2026
Studio Nyandak Architectu8378103/11/2026
Midtown Preservation Architects2634112/19/2025
Alan Margolin & Associates423208/01/2025
Etna Consulting Structural8263211/20/2024
Assure Professional Engineering6962211/08/2024
SWL Engineering Inspectio6912105/13/2024
Linea3155904/29/2024
SGM Engineering2366207/07/2023
HRF Services5616204/21/2023
Milrose Consultants2003104/16/2022
Alnour Consulting Engineering607210/26/2021
Building Lifecycle
All (300)Filed (61)Permit Issued (43)Signed Off (26)Facade (FISP) (3)Violation (26)Inspection (39)Objection (72)Special Inspection (30)
10/08/2026
Filed — Alteration
REMOVE EXISTING CHIMNEY LINER. PROVIDE NEW 316L SS BREECHING AND CHIMNEYLINER FROM COMMERCIAL STORAGE SPACE, CELLAR HALLWAY, AND THROUGH GARAGE ROOF. PROVIDE NEW LIFETIME XI1 LINER. ALL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01096829-P4
10/08/2026
Filed — Alteration
REMOVE EXISTING CHIMNEY LINER. PROVIDE NEW 316L SS BREECHING AND CHIMNEYLINER FROM COMMERCIAL STORAGE SPACE, CELLAR HALLWAY, AND THROUGH GARAGE ROOF. PROVIDE NEW LIFETIME XI1 LINER. ALL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01096829-P3
10/07/2026
Filed — Alteration
REMOVE EXISTING CHIMNEY LINER. PROVIDE NEW 316L SS BREECHING AND CHIMNEYLINER FROM COMMERCIAL STORAGE SPACE, CELLAR HALLWAY, AND THROUGH GARAGE ROOF. PROVIDE NEW LIFETIME XI1 LINER. ALL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01096829-S4
09/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL SCORRANO
09/30/2026
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
09/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL SCORRANO
09/30/2026
Special inspection requirement — Heating Systems
MICHAEL SCORRANO
09/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL SCORRANO
09/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL SCORRANO
09/24/2026
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR ENGINEER INSPECTION& FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01341033-P3
09/14/2026
Objection resolved — Resolved
09/14/2026
Objection resolved — Addressed
09/03/2026
Objection raised — Inspections
09/03/2026
Objection raised — Scope
08/24/2026
Permit issued — Plumbing
M01256480-S1-PL
08/24/2026
Objection resolved — Resolved
08/24/2026
Objection resolved — Resolved
08/20/2026
Objection raised — Other
08/20/2026
Objection raised — Inspections
08/20/2026
Objection raised — Scope
08/19/2026
Filed — Alteration
INTERIOR RENOVATION IN APT 17E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01429981-S1
08/19/2026
Filed — Alteration
INTERIOR RENOVATION IN APT 17E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01429981-I1
08/13/2026
Permit issued — Suspended Scaffold
M01438852-I1-SC
08/05/2026
Filed — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
M01438852-I1
07/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR ENGINEER INSPECTION& FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01341033-P2
07/23/2026
Special inspection requirement — Interior lighting power
James Maynard
07/23/2026
Special inspection requirement — Lighting controls
James Maynard
07/14/2026
Filed — Alteration
REMEDIATION OF EXISTING EXHAUST SHAFTS. INSTALLATION OF NEW GRILLES, CONSTANT AIR REGULATORS, AND FIRE DAMPERS. TESTING AND BALANCING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01412037-I1
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
James Maynard
07/13/2026
Special inspection requirement — Lighting in dwelling units
James Maynard
07/13/2026
Special inspection requirement — Final
James Maynard
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
James Maynard
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL SCORRANO
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — Heating Systems
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — Maintenance information
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL SCORRANO
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL SCORRANO
06/04/2026
Special inspection requirement — Final
06/04/2026
Special inspection requirement — Mechanical Systems
05/23/2026
Violation issued (ECB, closed)
Unknown
05/21/2026
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR ENGINEER INSPECTION& FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01341033-P1
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Objection raised — Scope
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Admin
04/02/2026
Permit issued — Structural
M01096829-S3-ST
04/02/2026
Permit issued — General Construction
M01333275-I1-GC
03/25/2026
Filed — Alteration
Replace make up air unit to deliver tempered outdoor air to corridors via existing shafts. No change in use, egress or occupancy.
M01364030-I1
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating08/24/2026
DOB NOWSuspended ScaffoldPermit IssuedRosenwach Tank Co08/13/2026
DOB NOWStructuralPermit IssuedThe Metro Group04/02/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction04/02/2026
DOB NOWPlumbingPermit IssuedThe Metro Group Plumbing01/22/2026
DOB NOWBoiler EquipmentPermit IssuedThe Metro Group Plumbing01/22/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction01/15/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction01/06/2026
DOB NOWGeneral ConstructionPermit IssuedThe Metro Group12/11/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/23/2025
DOB NOWGeneral ConstructionPermit IssuedNY Fine Interiors & Woodw09/22/2025
DOB NOWSupported ScaffoldSigned-offThe Metro Group09/17/2025
DOB NOWPlumbingSigned-offP.S.I. Mechanical05/13/2025
DOB NOWMechanical SystemsSigned-offCrystal Comfort02/25/2025
DOB NOWPlumbingPermit IssuedThe Metro Group Plumbing01/09/2025
DOB NOWBoiler EquipmentPermit IssuedThe Metro Group Plumbing01/09/2025
DOB NOWPlumbingSigned-offP.S.I. Mechanical12/16/2024
DOB NOWGeneral ConstructionSigned-offNilu Home Improvement NY12/12/2024
DOB NOWStructuralSigned-offAM Building Restoration*06/03/2024
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG04/24/2024
DOB NOWGeneral ConstructionSigned-offOrchid Construction04/15/2024
DOB NOWPlumbingSigned-offMohamed Abdelrazek01/30/2024
DOB NOWPlumbingSigned-offT & T Plumbing11/08/2023
DOB NOWGeneral ConstructionPermit IssuedG.P. Mechanical05/19/2023
DOB NOWGeneral ConstructionSigned-offParadise Construction Group01/27/2023
DOB NOWPlumbingSigned-offMohamed Abdelrazek01/17/2023
DOB NOWGeneral ConstructionSigned-offParadise Construction Group01/11/2023
DOB NOWGeneral ConstructionSigned-offCube Builders Group NY11/10/2022
DOB NOWPlumbingSigned-offT & T Plumbing11/03/2022
DOB NOWPlumbingSigned-offScarponi & Son Plumbing & Heating05/20/2022
DOB NOWGeneral ConstructionSigned-offParadise Construction Group05/05/2022
DOB NOWPlumbingSigned-offScarponi & Son Plumbing & Heating05/03/2022
DOB NOWGeneral ConstructionSigned-offInnovative Ventures Team04/01/2022
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/10/2022
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/10/2022
DOB NOWGeneral ConstructionSigned-offInnovative Ventures Team12/16/2021
DOB NOWGeneral ConstructionSigned-offInnovative Ventures Team12/10/2021
DOB NOWPlumbingSigned-offFlytiger P & H12/01/2021
DOB NOWPlumbingSigned-offFlytiger P & H07/26/2021
DOB NOWGeneral ConstructionSigned-offBellwood NY07/20/2021
+ 57 more permits on file
1 project · most recent 12/04/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025——Others
Other
Ice Air 5FCUE04 400 CFM · Fan Coil Indoor ×2
5 projects · most recent 10/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/08/2026Permit IssuedThe Metro Group PlumbingGas, Water/Sanitary
08/19/2026——Gas, Water/Sanitary
12/04/2025——Gas, Water/Sanitary
08/01/2025Signed-offOrbit Plumbing & HeatingGas, Water/Sanitary
04/21/2023——Water/Sanitary
25 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
03/03/2026Permit IssuedTower Electric—
09/24/2025Permit IssuedGlendale Electl ContngGeneral Wiring
08/21/2025Permit IssuedS.A.L. Electric CoGeneral Wiring
04/07/2025Permit IssuedAlltech Electrical ContngGeneral Wiring
04/05/2025Permit IssuedDVM Electrical ServicesGeneral Wiring
03/05/2025CompleteKwong Ming Electric—
03/03/2025CompleteC R ElectricGeneral Wiring
02/28/2025CompleteGalaxy ElectricGeneral Wiring
01/30/2025CompleteS.A.L. Electric CoGeneral Wiring
08/12/2024CompleteCronos Fire and Electrical—
05/30/2024CompleteIcon ElectricGeneral Wiring
09/15/2023CompleteRigid ElectricGeneral Wiring
06/09/2023Permit IssuedN.Z. Pilgrim ElectricGeneral Wiring
02/22/2023CompleteCity Grid ElectricGeneral Wiring
1 project · most recent 10/08/2026
Steel
FiledStatusContractorScope
10/08/2026Permit IssuedThe Metro GroupSteel
1 project · most recent 01/23/2026
Sidewalk Shed
FiledStatusContractorScope
01/23/2026Permit IssuedXinos ConstructionSidewalk Shed
2 projects · most recent 09/24/2026
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/24/2026Permit IssuedXinos ConstructionSuspended Scaffold
12/19/2025Permit IssuedXinos ConstructionTenant Protection Plan 72 Hour
2 projects · most recent 09/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/24/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
08/05/2026Permit IssuedRosenwach Tank CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 39
DateTypeResultReport
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 39.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/30/2026Heating SystemsMICHAEL SCORRANOspecial
09/30/2026Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
09/30/2026Maintenance informationMICHAEL SCORRANOenergy_progress
09/30/2026HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
09/30/2026HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
09/30/2026HVAC-R and service water piping design and insulationMICHAEL SCORRANOenergy_progress
07/23/2026Interior lighting powerJames Maynardenergy_progress
07/23/2026Lighting controlsJames Maynardenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
07/13/2026FinalJames Maynardprogress
07/13/2026Energy Code Compliance InspectionsJames Maynardprogress
07/13/2026Energy Code Compliance InspectionsJames Maynardprogress
07/13/2026Lighting in dwelling unitsJames Maynardenergy_progress
07/13/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Tenant Protection Plan Compliance—special
06/18/2026Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
06/16/2026Tenant Protection Plan Compliance—special
06/15/2026Maintenance informationMICHAEL SCORRANOenergy_progress
06/15/2026Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
06/15/2026Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
06/15/2026Heating SystemsMICHAEL SCORRANOspecial
06/15/2026Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
06/15/2026HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
06/15/2026HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gomez Stolk & HarpinResidentialFloor 9
Project M00784236 Alteration · LOC Issued · 09/14/2022
Project M00784237 Alteration · LOC Issued · 09/14/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,439 on file (BIS + DOB NOW)
▸Plans & Drawings63
▸DOB NOWPlans/Sketch58
09/06/2026M01364030-I1Request digital key ↗
09/03/2026M00518424-I1Request digital key ↗
09/03/2026M00573385-I1Request digital key ↗
Showing 3 of 58 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00123724-I1Request digital key ↗
09/05/2026M00123724-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00363881-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits325
▸BISPLAN / WORK APPROVAL APPLICATION164
02/27/2026104117545Open ↗
02/25/2026104117545Open ↗
06/12/2025104117545Open ↗
Showing 3 of 164 on file for this type
▸BISWORK PERMIT APPLICATION107
07/28/2025104117545Open ↗
06/10/2025104117545Open ↗
09/01/2023122779305Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWLPC Approval/Permit51
09/03/2026M00573385-I1Open ↗
09/03/2026M00573435-I1Open ↗
09/03/2026M00573435-P1Open ↗
Showing 3 of 51 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
06/09/2025123328336Open ↗
04/20/2021122763241Open ↗
07/31/2020140929075Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications305
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION111
02/07/2020103218402Open ↗
02/07/2020103218402Open ↗
02/07/2020103218402Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature58
09/05/2026M00123724-I1Open ↗
09/05/2026M00123724-P1Open ↗
09/03/2026M00467855-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
10/09/2026M01096829-P3Open ↗
10/09/2026M01096829-S4Open ↗
10/09/2026M01096829-P4Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
10/09/2026M01096829-S4Open ↗
10/09/2026M01096829-P4Open ↗
09/29/2026M01096829-P1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
07/28/2020140929075Open ↗
Showing 1 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/28/2020140929075Open ↗
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment107
▸BISSCHEDULE B - PLUMBING41
02/27/2026104117545Open ↗
02/25/2026104117545Open ↗
06/06/2025122779305Open ↗
Showing 3 of 41 on file for this type
▸BISSELF-CERT PLUMBING NOTICE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/23/2021122763241Open ↗
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes21
07/28/2025104117545Open ↗
03/17/2023122779305Open ↗
07/31/2020140929075Open ↗
Showing 3 of 21 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos104
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
09/03/2026M00573385-I1Open ↗
09/03/2026M00573435-I1Open ↗
09/03/2026M00573435-P1Open ↗
Showing 3 of 49 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)34
07/28/2020140929075Open ↗
Showing 1 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance101
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS21
08/16/2024123538010Open ↗
04/19/2021123658746Open ↗
03/03/2021140929075Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
08/16/2024123538010Open ↗
03/23/2021122763241Open ↗
03/23/2021122763241Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
07/28/2020140929075Open ↗
Showing 1 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/24/2025122779305Open ↗
06/09/2025123328336Open ↗
03/23/2021122763241Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00573385-I1Open ↗
Showing 1 of 3 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/31/2020140929075Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY27
08/16/2024123538010Open ↗
08/16/2024123538010Open ↗
04/18/2022122650719Open ↗
Showing 3 of 27 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/28/2020140929075Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs136
▸BISLANDMARKS APPROVAL56
07/31/2020140929075Open ↗
02/07/2020103218402Open ↗
Showing 2 of 56 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
09/26/2025122779305Open ↗
06/09/2025123328336Open ↗
08/27/2024123538010Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION23
08/15/2022101245564Open ↗
08/15/2022101245546Open ↗
08/15/2022101245519Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER4
07/28/2025104117545Open ↗
09/01/2023122779305Open ↗
03/22/2023122779305Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
06/09/2025123328336Open ↗
03/23/2021122763241Open ↗
03/03/2021140929075Open ↗
▸BISFINAL1
09/26/2025122779305Open ↗
▸Cost, Insurance & Ownership96
▸BISCOST AFFIDAVIT86
08/16/2024123538010Open ↗
04/22/2021123658746Open ↗
03/03/2021140929075Open ↗
Showing 3 of 86 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/24/2025122779305Open ↗
06/09/2025123328336Open ↗
04/20/2021122763241Open ↗
▸Filing & Intake Forms117
▸BISEFILING COVER SHEET39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISADDITIONAL INFORMATION38
03/02/2026104117545Open ↗
04/08/2024122779305Open ↗
01/06/2023122779305Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM31
09/01/2023122779305Open ↗
03/22/2023122779305Open ↗
03/03/2023122779305Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
07/28/2020140929075Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents27
▸DOB NOWManufacturer's Specifications6
10/05/2026M01341033-P3Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWCalculations6
10/05/2026M01341033-P3Open ↗
Showing 1 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/27/2024123538010Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWProof of Historic Building4
09/02/2026M00705645-I1Open ↗
Showing 1 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDHCR Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type