← Back
BuildNYC
Over six families without stores
3606 HOLLAND AVENUE
BRONX · BIN 2057805
💬 Discuss this project
1915Year Built
5Stories
C1Building Class
R7AZoning
7,902 sfGross Floor Area
11Units
Rent Stabilized8 Active Violations ▸
Over six families without stores · Owner of record: SHG 3606 · 2,375 sf lot · 3.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical systems installation in cellar, floors, penthouse7p · 1 filing · 13 docs
PenthouseMechanical systems installation in cellar, floors, penthouse34p · 4 filings · 20 docs
Floor 4Mechanical systems installation in cellar, floors, penthouse38p · 6 filings · 20 docs
Floor 3Mechanical systems installation in cellar, floors, penthouse37p · 6 filings · 20 docs
Floor 2Mechanical systems installation in cellar, floors, penthouse37p · 6 filings · 20 docs
Floor 1Mechanical systems installation in cellar, floors, penthouse37p · 6 filings · 20 docs
CellarMechanical systems installation in cellar, floors, penthouse34p · 4 filings · 20 docs
Site & exteriorSupport of Excavation Work21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ionic Group2607/08/2026
SHG1103/22/2026
Afs Systems1007/08/2026
Brookville Homes403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2020$650K—Private party → SHG 3606$82/sf building
11/20/2015$551K—UNITED HERING LLC → Private party$70/sf building
02/25/2015$258K—Private party → UNITED HERING LLC$33/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cavalry2403/21/2026
AE Design Solution603/21/2026
Green Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yellow Hat Construction IGeneral Contractor807/08/2026
Central Scaffold & HoistScaffold603/21/2026
Yellow Hat Construction IScaffold603/21/2026
A. M. Plumbing CompanyPlumbing207/08/2026
Manhattan D EnterprisesScaffold107/08/2026
Power Direct ElectricElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
D & W Electrical ContElectrical103/21/2026
Power Direct ElectricElectrical103/21/2026
Kaufman GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-Tech Engineering6659603/29/2022
M. International Engineering3129403/29/2022
Building Lifecycle
12/15/2025
Elevator Category 1 inspection report filed
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
09/08/2024
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM EAST…
HPD violation · open
09/08/2024
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER SPRING BALANCE AT LOWER WINDOW SASH IN THE PRIVATE HALLWAY LOCATED AT APT…
HPD violation · closed
08/15/2024
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4C,…
HPD violation · open
157 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offYellow Hat Construction I01/03/2022
DOB NOWSupport of ExcavationSigned-offYellow Hat Construction I11/01/2021
DOB NOWSupported ScaffoldSigned-offCentral Scaffold & Hoist09/15/2021
DOB NOWSupported ScaffoldSigned-offCentral Scaffold & Hoist09/14/2021
DOB NOWSprinklersSigned-offAmb Mechanical09/09/2021
DOB NOWPlumbingSigned-offA. M. Plumbing Company08/25/2021
DOB NOWConstruction FenceSigned-offYellow Hat Construction I07/06/2021
DOB NOWStructuralSigned-offYellow Hat Construction I07/06/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises06/15/2021
DOB NOWConstruction FenceSigned-offYellow Hat Construction I04/07/2021
DOB NOWStructuralSigned-offYellow Hat Construction I03/22/2021
DOB NOWConstruction FenceSigned-offKaufman Group08/17/2020
BIS—ISSUEDJSB Works08/10/2022
BIS—ISSUEDYellow Hat Construction I08/23/2021
BIS—ISSUEDYellow Hat Construction I04/01/2021
BIS—ISSUEDKaufman Group01/14/2021
BIS—ISSUEDKaufman Group11/24/2020
BISPLISSUEDAttack Plumbing03/12/2015
BISOTISSUEDJRS Construction & Expediting03/12/2015
BISPLISSUEDF & L Plumbing & Mechanical10/30/2003
4 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024Permit IssuedD & W Electrical ContGeneral Wiring
10/28/2021CompletePower Direct ElectricGeneral Wiring
09/17/2021CompletePower Direct Electric—
06/14/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/04/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/04/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
04/30/2022Sprinkler SystemsNANIK MASSANDspecial
04/30/2022HVAC and service water heating equipment NANIK MASSANDenergy_progress
04/30/2022Post-installed AnchorsNANIK MASSANDspecial
04/30/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/30/2022Energy Code Compliance InspectionsNANIK MASSANDprogress
04/30/2022Maintenance informationNANIK MASSANDenergy_progress
04/30/2022HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
04/30/2022HVAC and service water heating system controls NANIK MASSANDenergy_progress
04/09/2022HVAC and service water heating equipment NANIK MASSANDenergy_progress
04/09/2022Post-installed AnchorsNANIK MASSANDspecial
04/09/2022Mechanical SystemsNANIK MASSANDspecial
04/09/2022Energy Code Compliance InspectionsNANIK MASSANDprogress
04/09/2022FinalNANIK MASSANDprogress
04/09/2022HVAC insulation and sealing NANIK MASSANDenergy_progress
04/09/2022Maintenance informationNANIK MASSANDenergy_progress
04/09/2022HVAC and service water heating system controls NANIK MASSANDenergy_progress
04/09/2022Duct leakage testing NANIK MASSANDenergy_progress
04/09/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/28/2022Sprinkler SystemsALBERTO ROMANspecial
03/28/2022HVAC-R and service water piping design and insulationALBERTO ROMANenergy_progress
03/21/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
03/21/2022Post-installed AnchorsALBERTO ROMANspecial
03/21/2022Energy Code Compliance InspectionsALBERTO ROMANprogress
03/21/2022Maintenance informationALBERTO ROMANenergy_progress
03/21/2022HVAC and service water heating equipment ALBERTO ROMANenergy_progress
Latest 25 of 46.
251 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account