← Back
Old law tenement
361 WEST 51 STREET
MANHATTAN · Hell's Kitchen · BIN 1025196
💬 Discuss this project
1920Year Built
5Stories
C4Building Class
R8Zoning
7,515 sfGross Floor Area
10Units
Rent Stabilized23 Open Violations ▸
Old law tenement · Owner of record: 361-363 ASSOCIATES · 1,808 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 20 docs
Floor 12p · 1 filing · 9 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
361-363 ASSOCIATES503/22/2026
361-363 ASSOCIATES A J CL203/22/2026
361-363 ASSOCIATES CARE103/22/2026
361-363 ASSOCAITES PALE M203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP701/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z & K RENOVATION, CORPGeneral Contractor407/08/2026
Z.W. PLBG & HTG CORPPlumbing307/08/2026
TOMASZ PUZAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665701/18/2024
Building Lifecycle
All (95)Filed (7)Permit Issued (6)Signed Off (5)Violation (60)Inspection (9)Special Inspection (8)
07/05/2026
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
A
06/11/2024
Violation issued (HPD, open)
B
06/11/2024
Violation issued (HPD, open)
B
06/11/2024
Violation issued (HPD, open)
B
06/11/2024
Violation issued (HPD, closed)
C
02/05/2024
Signed off — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-S1
02/05/2024
Signed off — Alteration
M00673578-I1
01/29/2024
Signed off — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-I1
01/26/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
01/18/2024
Filed — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-P2
01/18/2024
Signed off — Alteration
M00673578-S1
01/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
01/11/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/26/2023
Permit issued — Plumbing
M00673578-S1-PL
12/19/2023
Permit issued — General Construction
M00673578-I1-GC
12/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2023
Permit issued — General Construction
M00804843-I1-GC
11/20/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-S2
10/03/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/28/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-P1
09/27/2023
Special inspection requirement — Heating Systems
INHWAN CHANG
09/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
09/22/2023
Violation issued (HPD, closed)
C
09/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2023
Violation issued (HPD, open)
B
09/13/2023
Violation issued (HPD, open)
B
09/13/2023
Violation issued (HPD, closed)
C
09/11/2023
Violation issued (HPD, closed)
C
09/11/2023
Violation issued (HPD, closed)
C
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, open)
B
09/10/2023
Violation issued (HPD, closed)
C
07/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2023
Permit issued — Plumbing
M00804843-S1-PL
06/08/2023
Permit issued — Boiler Equipment
M00804843-S2-BE
03/08/2023
Violation issued (HPD, open)
B
03/08/2023
Violation issued (HPD, open)
B
03/08/2023
Violation issued (HPD, open)
A
01/10/2023
Permit issued — General Construction
M00673578-I1-GC
01/09/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-S1
01/09/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-S2
01/06/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE THE BOILER ROOM. WORK INCLUDES REMOVING AND REPLACING THE CHIMNEY LINER, REPLACE HEATING BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
M00804843-I1
03/25/2022
Filed — Alteration
M00673578-S1
03/24/2022
Filed — Alteration
M00673578-I1
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
01/05/2022
Violation issued (ECB, closed)
Construction
01/05/2022
Violation issued (ECB, closed)
Construction
12/23/2021
Violation issued (ECB, closed)
Construction
09/04/2021
Violation issued (HPD, closed)
B
09/04/2021
Violation issued (HPD, closed)
B
09/04/2021
Violation issued (HPD, closed)
B
09/02/2021
Violation issued (HPD, closed)
B
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP12/26/2023
DOB NOWGeneral ConstructionSigned-offZ K RENOVATION12/19/2023
DOB NOWGeneral ConstructionSigned-offZ K RENOVATION12/05/2023
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP06/08/2023
DOB NOWBoiler EquipmentSigned-offZ.W. PLBG & HTG CORP06/08/2023
DOB NOWGeneral ConstructionSigned-offZ K RENOVATION01/10/2023
BISPLISSUEDZ.W. PLBG & HTG CORP10/02/2014
BISOTISSUEDZ & K RENOVATION, CORP09/12/2014
BISPLISSUEDZ.W. PLBG & HTG CORP08/05/2014
BISOTISSUEDZ & K RENOVATION, CORP07/31/2014
BISEQISSUEDZ & K RENOVATION, CORP03/26/2013
BISOTISSUEDZ & K RENOVATION, CORP03/26/2013
BISPLISSUEDZ.W. PLBG & HTG CORP06/22/2006
BISOTISSUEDZ & K RENOVATION, CORP05/05/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/25/2024Tenant Protection Plan ComplianceINHWAN CHANGspecial
01/25/2024Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
01/16/2024Tenant Protection Plan Compliance—special
01/16/2024Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
09/27/2023Heating SystemsINHWAN CHANGspecial
09/27/2023Tenant Protection Plan ComplianceINHWAN CHANGspecial
09/27/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
02/02/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00673578-I1Request digital key ↗
09/02/2026M00673578-S1Request digital key ↗
09/01/2026M00804843-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
10/29/2018122093064Open ↗
09/24/2018122093064Open ↗
03/30/2018122093064Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
10/07/2014122093064Open ↗
09/16/2014122093064Open ↗
08/18/2014122065399Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
11/13/2018122093064Open ↗
11/13/2018122093064Open ↗
11/13/2018122093064Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00673578-I1Open ↗
09/02/2026M00673578-S1Open ↗
09/01/2026M00804843-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/18/2026M00804843-P1Open ↗
09/18/2026M00804843-P1Open ↗
09/18/2026M00804843-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/15/2014122093064Open ↗
08/07/2014122065399Open ↗
03/26/2013121574297Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/15/2014122093064Open ↗
08/07/2014122065399Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/26/2013121574297Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE3
12/29/2014122093064Open ↗
11/28/2014122093064Open ↗
10/22/2014122065399Open ↗
▸BISSCHEDULE B - PLUMBING2
11/16/2012121436446Open ↗
08/04/2010120428073Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/15/2014122093064Open ↗
08/07/2014122065399Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist7
08/13/2026M00804843-I1Open ↗
08/13/2026M00804843-P2Open ↗
08/13/2026M00804843-S2Open ↗
Showing 3 of 7 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON4
09/15/2014122093064Open ↗
03/26/2013121574297Open ↗
01/10/2013121436446Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
01/10/2013121436446Open ↗
08/04/2010120428073Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
08/07/2014122065399Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/02/2026M00673578-I1Open ↗
09/02/2026M00673578-S1Open ↗
09/01/2026M00804843-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/15/2014122093064Open ↗
08/07/2014122065399Open ↗
03/26/2013121574297Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
11/13/2018122093064Open ↗
10/13/2015121574297Open ↗
10/06/2014122065399Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/13/2018122093064Open ↗
10/13/2015121574297Open ↗
10/06/2014122065399Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/15/2018122093064Open ↗
11/13/2018122093064Open ↗
11/02/2018122093064Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/26/2013121574297Open ↗
11/16/2012121436446Open ↗
08/04/2010120428073Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
11/16/2012121436446Open ↗
08/04/2010120428073Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/06/2014122065399Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
11/13/2018122093064Open ↗
10/13/2015121574297Open ↗
10/06/2014122065399Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
09/16/2014122093064Open ↗
08/07/2014122065399Open ↗
03/29/2013121574297Open ↗
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM6
11/15/2018122093064Open ↗
11/13/2018122093064Open ↗
11/02/2018122093064Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
09/15/2014122093064Open ↗
08/07/2014122065399Open ↗
03/26/2013121574297Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
10/29/2018122093064Open ↗
06/13/2017122093064Open ↗
10/15/2014122065399Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM2
11/16/2012121436446Open ↗
08/04/2010120428073Open ↗